Dies ist eine HTML Version eines Anhanges der Informationsfreiheitsanfrage 'Lobby meetings with Fluxys, Enagás, SNAM, GRTgaz, GIE'.


Ref. Ares(2018)5389783 - 19/10/2018
Annex – List of documents for GESTDEM 2018/3410 – Mr SABIDO 
Disclosed (D), Not disclosed 
File Number 
Title 
No. 
Company 
(ND) incl. reason 
ENAGAS: Proposal for a Regional Workshop on the Iberian-French-

Ares(2014)2513396  German Gas Corridor (Madrid, 14 October) and meeting request 
 
1  Enagas 
DG/ENAGAS 
2  Enagas 
Ares(2014)995732 
ENAGAS, Presentation on CRE's consultation on 2018 

Response to the public consultation on the Revision of Regulation (EU) 

Ares(2015)2066913 
3  Enagas 
No 994/2010 - Enagás GTS 
4  Enagas 
Ares(2015)2068284  ENAGAS comments to EC Consultation on Reg 994/2010 

5  Fluxys 
Ares(2014)1896069  FLUXYS Request for a meeting 

Announce that our Board of Directors has decided to appoint from 1 

Ares(2014)3233553  January 2015 Pascal De Buck as deputy CEO of Fluxys SA as well as 
6  Fluxys 
CEO and Chairman of the Executive Board of Fluxys Belgium SA. 
Board of Directors has decided to appoint from 1 January 2015 Pascal 

Ares(2014)3517724  De Buck as deputy CEO of Fluxys SA as well as CEO and Chairman of 
7  Fluxys 
the Executive Board of Fluxys Belgium SA 
8  Fluxys 
Ares(2015)1989761  Fluxys input on consultation Regulation (EC) 994/2010 


Note to Final Report ENER/EEPR09-INTG-BE-FR-SUBACTION 
Ares(2015)245547 
1/SI2.573299 - Fluxys Belgium SA 
9  Fluxys 
10  Fluxys 
Ares(2017)3516795  RE: NSI West meeting 27/04 : working document 

Gas 

Invitation and draft agenda of the Gas Coordination Group (24 September 
Infrastructure 
Ares(2013)2991039  2013) 
11  Europe 
Gas 

Infrastructure 
Ares(2014)1825664  Forum 2014 sur le gaz pour les Etats membres 
12  Europe 
Gas 

Infrastructure 
Ares(2014)2458794  Letter to EU bodies and associations on the stress tests 
13  Europe 

Annex – List of documents for GESTDEM 2018/3410 – Mr SABIDO 

Gas 
Energy security stress tests - Your letter with reference 
Ares(2014)2592941 
Infrastructure 
ENER/B2/BS/cs/S(2014)2442927 
14  Europe 
Gas 

Infrastructure 
Ares(2015)1622203  Revision SoS regulation - GIE input 
15  Europe 
Gas 

AGENDA 23/06/2015 -14h30 | Invitation to speak | GasNaturally's 
Infrastructure 
Ares(2015)1921606  Member States' Gas Forum 
16  Europe 

FW: Internet publication of replies to consultation on revision of Gas 
Gas 
Ares(2015)2084536  Security of Supply Regulation 
Infrastructure 
17  Europe 
ND, power point presentation 
contains commercially sensitive 
Gas 
Ares(2015)2423230  RE: Network code on transmission tariffs for gas 
information about tariffs for gas 
Infrastructure 
storages 
18  Europe 
ND, the email itself does not 
contain information, the 
attachment contains 8 power 
Ares(2015)3124813  GSE Workshop 15 July 2015 
Gas 
points from companies who 
Infrastructure 
presented at the workshop but 
19  Europe 
where not part of the request 
Gas 

Infrastructure 
Ares(2015)3618755  Study on actual GHG data for diesel, petrol, kerosene and natural gas 
20  Europe 
Gas 

Infrastructure 
Ares(2015)4046139  R/Study on actual GHG data for diesel, petrol, kerosene and natu rai gas 
21  Europe 
Gas 

Infrastructure 
Ares(2015)4431499  GIE response to consultation on LNG and storage strategy 
22  Europe 
Gas 

Infrastructure 
Ares(2015)4941481  GSE follow-up 
23  Europe 

Annex – List of documents for GESTDEM 2018/3410 – Mr SABIDO 
ND, the email itself does not 
Gas 
contain any information, but the 
Ares(2015)5136951  RE: GSE follow-up 
Infrastructure 
attachment contains intellectual 
24  Europe 
proporty of GSE ("toolbox") 
Gas 

Infrastructure 
Ares(2015)5488828  RE: Meeting 11h00 & follow-up TelCo on Friday at 11h15 
25  Europe 
Gas 

Infrastructure 
Ares(2016)7110776  20160216 Press Release GIE Energy Security Package final.pdf 
26  Europe 
Gas 

Infrastructure 
Ares(2016)7110776  RE: GIE Security of Supply TF 
27  Europe 

Gas 
Steering Group Participation: Quo Vadis EU gas market regulatory 
Ares(2016)7163927 
Infrastructure 
framework 
28  Europe 
Gas 

Infrastructure 
Ares(2017)3235767  EU energy legislative reforms 
29  Europe 
Gas 

Infrastructure 
Ares(2017)738644 
Presentations at LNG and storage strategy workshop 22 September 2015 
30  Europe 
Gas 

Infrastructure 
Ares(2018)2264353  Towards the Paris Agreement with Gas Infrastructure 
31  Europe 
32  GasNaturally 
Ares(2016)7110776  GasNaturally Heating Workshop Programme.pdf 

33  GasNaturally 
Ares(2016)7110776  SFM GasNaturally 23Jun2015.pdf 

34  GasNaturally 
Ares(2016)7110776  Meetings and documents ENER - GasNaturally.docx 

ND, contains commercially 
  
Projet EEPR-FR The Technical Implementation 
35  GRTgaz 
sensitive information 
FW, Demande de modification (report date de fin) de la subvention 

Ares(2013)3178548 
36  GRTgaz 
EEPR-2009-INTg-FR 
ND, contains commercially 
Ares(2013)3534233  launch of ISC - Amendment of EEPR-INTg-FR 
37  GRTgaz 
sensitive information 
38  GRTgaz 
Ares(2013)725707 
ACTION N° EEPR-2009-INTg-FR INTERIM PAYMENT - 


Annex – List of documents for GESTDEM 2018/3410 – Mr SABIDO 
C/SI2.573299 - C/SI2.573304 - FINAL TECHNICAL IMPLEMENTATION 
ND, contains commercially 
Ares(2014)3224275  REPORT, FINANCIAL STATEMENT AND MISC. SUPPORTING 
sensitive information 
39  GRTgaz 
DOCUMENTS. 
ND, contains commercially 
Ares(2014)3250710  CONTRACT SI2.573304 AUDIT CERTIFICATE 
40  GRTgaz 
sensitive information 
ND, contains commercially 
Ares(2014)3321565  CONTRACT SI2.595821  TEN E REQUEST  FINAL PAIEMENT 
41  GRTgaz 
sensitive information 
Press Release Communication: Interconnexion gazière entre l'Espagne 
ND, ongoing litigation in the 
Ares(2014)3362250 
42  GRTgaz 
et la France 
Administrative court of Lyon 
43  GRTgaz 
Ares(2014)3536704  RE: ProjetG186/10 
ND,  
44  GRTgaz 
Ares(2014)3677016  RE: ProjetG186/10 

REQUEST FOR FINAL PAYMENT - DECISION C(2011) 4894 FOR THE 
ND, contains commercially 
Ares(2014)3830510 
45  GRTgaz 
ACTION 2010-G186/10-ENER/10/TEN-E - SI2.595821 - 
sensitive information 
46  GRTgaz 
Ares(2014)4266114  Communication on progress of Project G186/10 

47  GRTgaz 
Ares(2014)995732 
ENAGAS, Presentation on CRE's consultation on 2018 (same as doc.2) 

CONTRACT SI2.577629 INTERIM TECHNICAL IMPLEMENTATION 
ND, ongoing litigation in the 
Ares(2015)1304540 
48  GRTgaz 
REPORT AND FINANCIAL STATEMENT 
Administrative court of Lyon 
RE: Ares(2015)1028341 - RE: request for balance payment EEPR-2009-
ND, contains commercially 
Ares(2015)1453110 
49  GRTgaz 
INTg--FR-SI2.577629 
sensitive information 
*STOP* - RE: request for balance payment EEPR-2009-INTg--FR-
ND, contains commercially 
Ares(2015)1649117 
50  GRTgaz 
SI2.577629 
sensitive information 
*END STOP*RE: Ares(2015)1028341 - RE: request for balance payment 
ND, contains commercially 
Ares(2015)1649235 
51  GRTgaz 
EEPR-2009-INTg--FR-SI2.577629 
sensitive information 
ND, contains commercially 
Ares(2015)16808 
EEPR-2009-INTg-FR-SI2.577629 - PAYMENT REQUEST 
52  GRTgaz 
sensitive information 
RE: Internet publication of replies to consultation on revision of Gas 

Ares(2015)1725664 
53  GRTgaz 
Security of Supply Regulation 
FW: GRTgaz's response to European Commission's consultation on the 

Ares(2015)1891832  revision of regulation 994/2010 concerning measures to safeguard 
54  GRTgaz 
security of gas supply 
Payment of the balance - =FP=ENER/EEPR09-INTG-BE-FR-
ND, contains commercially 
Ares(2015)245096 
55  GRTgaz 
SUBACTION 2/SI2.573304 - GRT GAZ 
sensitive information 
=Final payment=ENER/EEPR09-INTG-BE-FR-SUBACTION 
ND, contains commercially 
Ares(2015)245547 
56  GRTgaz 
1/SI2.573299 - Fluxys Belgium SA 
sensitive information 
ND, contains commercially 
Ares(2015)751243 
RE: Ares(2015)209576 - *STOP 2* - ProjetG186/10 
57  GRTgaz 
sensitive information 


Annex – List of documents for GESTDEM 2018/3410 – Mr SABIDO 
FW: PF 7432 - Court of Auditors' Audit in relation to the Statement of 
ND, contains commercially 
Ares(2016)1840743  Assurance 2015: Project ref. EEPR09-INTG-BE-FR-SUBACTION 2-GRT 
sensitive information 
58  GRTgaz 
GAZ 
59  GRTgaz 
Ares(2016)5404399  FINANCIAL AUDIT 2015 - 025 -TEN -E-FR AND 2015-041 RRPR-FR 

ND, ongoing litigation in the 
Ares(2016)761662 
Consultant study on Midcat project (Comments on draft final report). 
60  GRTgaz 
Administrative court of Lyon 
61  GRTgaz 
Ares(2016)839547 
GRTgaz answer to strategy for LNG and storage 

Follow-up to the Southern Gas Corridor Regional Group meeting of 16 

Ares(2017)938707 
62  GRTgaz 
February 2017 
Follow-up to the NSI West Gas Regional Group meeting of 15 February 

Ares(2017)941991 
63  GRTgaz 
2017 
EEPR-2009-INTg-FR - Explanations regarding the Final Technical 

Ares(2018)1186229 
64  GRTgaz 
Implemenatation Report (FTIR) 
FW: Ares(2018)1186229 - EEPR-2009-INTg-FR - Final Technical 

Ares(2018)1753608 
65  GRTgaz 
Implemenatation Report (FTIR) 
66  GRTgaz 
Ares(2018)768322 
Synthèse de l'étude sur « un mix gaz 100% renouvelable en 2050 ? 

 
Electronically signed on 19/10/2018 15:15 (UTC+02) in accordance with article 4.2 (Validity of electronic documents) of Commission Decision 2004/563