Meetings on Krk LNG terminal and evacuation pipeplines

Die Anfrage wurde abgelehnt durch Generaldirektion Energie.

Dear Energy,

Under the right of access to documents in the EU treaties, as developed in Regulation 1049/2001, I am requesting documents which contain the following information:

- a list of all meetings between DG Energy and other European Union bodies and/or third parties on the Krk LNG terminal and evacuation pipeplines between January 2016 and 30 March 2017

- the minutes and all related documents of all meetings between DG Energy and other European Union bodies and/or third parties on the Krk LNG terminal and evacuation pipeplines between January 2016 and 30 March 2017

- all correspondence (written, email) between DG Energy and other European Union bodies and/or third parties on the Krk LNG terminal and evacuation pipeplines between January 2016 and 30 March 2017

Yours faithfully,

Pascoe Sabido

Generaldirektion Energie

1 Attachment

Dear M. Sabido,
 
Thank you for your e-mail  dated  16/08/2017/2017.  We hereby acknowledge
receipt of your application for access to documents, which was registered
on 17/08/2017 under GESTDEM 2017/4722 reference.
 
In accordance with Regulation (EC) No 1049/2001 regarding public access to
European Parliament, Council and Commission documents, your application
will be handled within 15 working days. The time limit will expire on
07/09/2017.
In case this time limit needs to be extended, you will be informed in due
course.
 
Can you please confirm that your postal address is : Corporate Europe
Observatory, Rue d'Edimbourg 26,  Bruxelles 1050 ?
 
You have lodged your application via the AsktheEU.org website. Please note
that this is a private website which has no link with any institution of
the European Union. Therefore the European Commission cannot be held
accountable for any technical issues or problems linked to the use of this
system.

 
Yours faithfully,
 
ACCESS TO DOCUMENTS TEAM
European Commission
Secretariat General
Unit B4 - Transparency
 

Zitate anzeigen

Dear Energy,

That is indeed my correct address, thank you for confirming.

Yours faithfully,

Pascoe Sabido

Dear Energy,

In accordance with Regulation (EC) No 1049/2001 regarding public access to European Parliament, Council and Commission documents, my request was supposed to have been completed by today.

Please can you make the requested documents available.

Yours faithfully,

Pascoe Sabido

Generaldirektion Energie

2 Attachments

Dear M. Sabido,
 
Your application for access to documents, registered under the above
mentioned reference number, is currently being handled. However, we are
not in a position to complete the handling of your application within the
time limit of 15 working days, which expired on 07/09/2017.
 
An extended time limit is needed for thorough analysis as to the
availability of the document requested.
 
Therefore, we have to extend the time limit with 15 working days in
accordance with Article 7(3) of Regulation (EC) No 1049/2001 regarding
public access to documents. The new time limit expires on 28/09/2017.
 
We apologise for this delay and for any inconvenience this may cause.
 
Yours faithfully,
 
ENER ACCES DOCUMENTS Team
 
European Commission
DG ENER
Unit A.1

DM24 08/046
B-1049 Brussels/Belgium
+32 2 295 62 44
 
 
 
_____________________________________________

Zitate anzeigen

Generaldirektion Energie

Dear Mr Sabido,

 

We refer to your Access to documents request of 16 August 2017, registered
as GESTDEM 2017/4722.

 

In the indicated period from January 2016 till March 2017, concerning the
Krk LNG terminal the Directorate-General for Energy had contacts within
the context of the Projects of Common Interest process (PCI process) and
the Commission Initiative on Central and South-Eastern European Energy
Connectivity (CESEC).

 

Under the PCI process, the Krk LNG terminal as a PCI project on the 2nd
PCI list (as project 6.5.1 LNG terminal in northern Greece) and as a
candidate project for the 3rd PCI list, is part of the so-called
North-South Gas Interconnections in Central Eastern and South Eastern
Europe (“NSI East Gas”) Priority Corridor and the related Regional Group.
The NSI East Regional Group meetings took place on the following dates: 2
February; 27 May; 22 September; 7 November and 12 December of 2016 and on
16 February of 2017.

The related documents and list of meetings can be found online in the
folder: "13 TEN-E Regional Group Meetings" available at:

[1]https://circabc.europa.eu

 

Whereas under the CESEC initiative, Krk LNG terminal being a CESEC
Conditional Priority Project, as the "LNG terminal in Croatia",  there
were meetings on 9 September and 28-29 November of 2016. The CESEC
documents and list of meetings can be found online at:

[2]https://ec.europa.eu/energy/en/topics/in...

 

Best regards,

ENER B1 PROJECTS

 

 

Zitate anzeigen

Dear Energy,

Thank you for the initial offering.

Can you please confirm that this means you've not met, spoken to or corresponded with anyone (another EU institution, a third party e.g. the project promoter or a national government) about the Krk LNG terminal outside of these meetings?

In my request, I explicitly ask for a list of meetings, minutes, and all correspondence "between DG Energy and other European Union bodies and/or third parties on the Krk LNG terminal and evacuation pipeplines between January 2016 and 30 March 2017".

If this is the case, then I can close the file, but if it is not the case, please send through any other meetings, minutes and/or correspondence relating to the Krk LNG Terminal and evacuation pipelines.

Yours faithfully,

Pascoe Sabido

Generaldirektion Energie

Dear Mr Sabido,
 
We can confirm that beyond the PCI and CESEC processes no meetings have
been organized in DG ENERGY or at the level of the cabinets of the
Commissioner for Climate Action and Energy and of the Vice-President
Šefčovič specifically dedicated to the Krk LNG terminal.
 
Best regards,
ENER B1 PROJECTS
 

Zitate anzeigen

Dear Energy,

I'm confused at why you have narrowed my request to meetings "organized in DG ENERGY or at the level of the cabinets of the Commissioner for Climate Action and Energy and of the Vice-President Šefčovič specifically dedicated to the Krk LNG terminal".

Firstly, the request covers all meetings that covered the Krk LNG terminal and evacuation pipeplines, not just those specifically dedicated to them. This includes within DG Energy, with other departments and with external parties such as project promoters, ENTSO-G or the gas lobby.

Secondly, my original request went far further than just meetings. It also includes all correspondence (written, email) which refers to the Krk LNG terminal and evacuation pipeplines.

Please ensure you provide all the relevant documents, as originally requested.

Yours faithfully,

Pascoe Sabido