BTO report of meeting of the ISG on cloning (28/08/2012) 
Present: 
 (SECGEN), 
 (DG AGRI), 
 (DG TRADE) 
 and 
 (DG SANCO) 
 
Subject: Examination of GHK draft revised interim report (16.08.2012) 
Main comments from other DGs: 
  All participants in favour of keeping the approach foreseen by the terms of reference 
of the study: assessment of each individual measure of the 4 approaches (suspension, 
traceability, traceability and labelling, pre-market approval). 
 
 
 
  The findings and data collected during GHK interviews should be integrated in the 
report and be used to elaborate and assess possible measures: 
 
 
  Economic impacts and cost estimates are missing at this stage (intended for final 
report only). 
 
Conclusions 
 

  GHK report should integrate data and findings collected by GHK and elaborate 
measures and scenario to be assessed; therefore the report needs to be largely revised. 
  The timeline for the draft final report (end of August) and of final report (end of 
September) is not compatible with the amount of work necessary to provide a valuable 
report (to provide more time to GHK).  
  The Steering Group advises to give more time to the consultant to improve the report 
in order to ensure that appropriate information is made available to write a good 
Impact Assessment. In the absence of such information, delays are likely to occur at a 
later stage.  
  Next meeting of the IASG on Wednesday 5/09 planned to examine i) the draft final 
report sent by GHK, ii) the data collected by GHK on traceability aspects