Ceci est une version HTML d'une pièce jointe de la demande d'accès à l'information 'History of IntCen/Sitcen'.


 
COUNCIL OF
Brussels, 22 May 2002  
THE EUROPEAN UNION
 
8945/2/02 
 

 
REV 2 
 
 
LIMITE 
 
COSDP 138 

 
FORWARDING NOTE 

From   : 
Secretariat 
To  

Delegations 
No. prev. doc.:  14614/01 COSDP 309 
Subject 
Suggestions for procedures for coherent, comprehensive EU crisis 
management 

 
 
Delegations will find attached a revised version of the suggestions for procedures for coherent, 
comprehensive EU crisis management. This version has been established on the basis of the work 
conducted in the Politico-Military Group. 
 
The suggestions for procedures for coherent, comprehensive, EU crisis management are a "living 
document", reflecting the current state of agreement on issues as laid down in agreed texts, and 
should continue to be reviewed and up-dated in light of developments. 
 
 
 
 
 
 
_______________________________________________________________________________  
8945/2/02  

 DG 

EN 


ANNEX 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

SUGGESTIONS FOR 
PROCEDURES 
FOR 
COHERENT, COMPREHENSIVE EU CRISIS MANAGEMENT 
 
 
 
 
 

 
 

_______________________________________________________________________________  
8945/2/02  

ANNEX DG 

EN 

 
INTRODUCTION 
 
 
The paper has been drawn up to include crises of the highest degree of complexity. Although the 
widest range of activities during the crisis cycle are described and appear sequentially, this is only 
for ease of reference. Therefore, the paper does not constrain the EU to develop its approach to a 
crisis in the sequence set down here. On the one hand, many instruments and processes mentioned 
might be relevant in several or all phases of a crisis, on the other hand, some of the processes 
mentioned may be skipped altogether.  
 
Furthermore, many of these processes, such as the development of a crisis management concept, are 
iterative in nature. Stability promotion and post-conflict reconstruction are mentioned as a separate 
phase 7, however, this is a matter of presentation and it is being understood that these may be 
present in all phases. 
 
The approach adopted since Helsinki makes the PSC the linchpin of the European security and 
defence policy (ESDP) and of the common foreign and security policy (CFSP): 

The PSC will deal with all aspects of the CFSP, including the ESDP. 

Without prejudice to Article 207 of the Treaty establishing the European Community, the 
PSC has a central role to play in the definition of and follow-up to the EU's response to a 
crisis. 

Within the scope of Title V (TEU), PSC shall exercise, under the responsibility of the 
Council, political control and strategic direction of crisis management operations. 
Naturally, the PSC plays this central role throughout a crisis; this is a principle underpinning this 
document. 
 
Coreper exercises the role conferred on it by Article 207 of the Treaty establishing the European 
Community and by Article 19 of the Council’s Rules of Procedure. To this end, it will be informed 
in good time by the PSC. 
 
The present suggestions are based on current Treaty provisions. After the entry into force of the 
Treaty of Nice these suggestions will need to be amended accordingly. They should also reflect 
developments in the EU-NATO arrangements for the implementation of Berlin Plus.  
 
Police aspects, following from the Police Action Plan adopted by the Göteborg European Council, 
have been introduced in the paper. These will be developed as appropriate as further work on and 
_______________________________________________________________________________  
8945/2/02  

ANNEX DG 

EN 

 
consideration of these requirements will be taken forward in the appropriate Council bodies by the 
Presidency, assisted by the Secretary General/High Representative.  
 
The on-going development of civilian crisis management capacities other than police (i.e. in the 
area of rule of law, civil administration and civil protection) will be reflected in the document as 
they evolve as foreseen in Annex III "New concrete targets for civilian aspects of crisis 
management" of the Presidency ESDP Report to the Göteborg European Council. 
 
The European Council has also invited the Presidency, together with the Secretary-General/High 
Representative, to continue work within the General Affairs Council to work out the practical 
modalities related to the implementation of the military and civilian aspects of crisis management, 
including civil-military co-ordination. Once these have been developed, they will be reflected in the 
procedures. 
 
It has been widely recognised that the establishment and implementation of a co-ordinated 
information policy is of paramount importance in time of crisis.  Information policy is mentioned in 
each phase as a separate section that will need to be developed subsequently. 
 
A comprehensive exercise policy allows the testing of crisis management procedures and 
contributes to its further development. All relevant Council Secretariat services, the SATCEN, the 
Commission and the Member States participate in the crisis management exercises. Appropriate 
external actors may also participate1 
 
It is noted that Denmark recalled the Protocol on the position of Denmark annexed to the Treaty on 
European Union and to the Treaty establishing the European Community. 
 
NB. References in the paper to the Council Secretariat include in particular the Directorate General 
E External Relations and its Police Unit, the EU Military Staff, the Policy Unit, the Legal Service, 
but can also include other Directorates General as appropriate. 
                                                 
1  
Principles regarding participation and observation in EU exercises are set out in the Exercise Policy of the European Union (Doc. 8373/1/01 
REV 1, p. 8, §18-20). 
_______________________________________________________________________________  
8945/2/02  

ANNEX DG 

EN 

 
TABLE OF CONTENTS 
PHASE 1  ROUTINE PHASE ........................................................................................................................................ 9 
A. STABILITY PROMOTION AND CONFLICT PREVENTION............................................................................................. 9 
B. MONITORING AND ANALYSIS OF THE SITUATION, EARLY WARNING ...................................................................... 9 
-  Consultations and contacts................................................................................................................................. 11 
C. ADVANCE PLANNING AND PREPARATORY ACTIONS, INCLUDING CIVILIAN ASPECTS AND CIVIL-MILITARY CO-
ORDINATION ................................................................................................................................................................. 13 
D. INFORMATION POLICY ......................................................................................................................................... 14 
PHASE 2  CRISIS BUILD-UP...................................................................................................................................... 15 
A. DETECTION OF THE CRISIS................................................................................................................................... 15 
-  Work within the EU: analyses, policy options, first measures taken.................................................................. 15 
-  Co-ordination, including civil-military co-ordination........................................................................................ 17 
-  Consultations and contacts................................................................................................................................. 18 
B. CONSIDERATION THAT EU ACTION IS APPROPRIATE: IDENTIFICATION OF AVAILABLE INSTRUMENTS, 
CAPABILITIES AND RESOURCES WITH A VIEW TO AN OVERALL APPROACH (HEREINAFTER CRISIS MANAGEMENT 
CONCEPT) ..................................................................................................................................................................... 19 
-  Work within the EU, including civilian aspects and civil-military co-ordination .............................................. 19 
-  Consultations and contacts................................................................................................................................. 23 
C. INFORMATION POLICY ......................................................................................................................................... 23 
PHASE 3  APPROVAL OF THE CRISIS MANAGEMENT CONCEPT................................................................ 24 
A. APPROVAL OF THE CRISIS MANAGEMENT CONCEPT............................................................................................. 24 
-  Work within the EU ............................................................................................................................................ 24 
-  Consultations and contacts................................................................................................................................. 25 
B. DEVELOPMENT OF THE MILITARY ELEMENTS OF THE EU APPROACH .................................................................. 26 
C. DEVELOPMENT OF CIVILIAN ASPECTS OF THE EU APPROACH.............................................................................. 28 
D. 
CO-ORDINATION INCLUDING CIVIL-MILITARY CO-ORDINATION ........................................................................... 30 
E. INFORMATION POLICY ......................................................................................................................................... 30 
PHASE 4  FORMAL DECISION TO TAKE ACTION............................................................................................. 31 
A. COUNCIL DECISION TO TAKE ACTION .................................................................................................................. 31 
B. SELECTION OF A MILITARY STRATEGIC OPTION ................................................................................................... 32 
-  Case 1: EU military operation without use of NATO assets and capabilities.................................................... 33 
-  Case 2: EU military operation with recourse to NATO assets and capabilities ................................................ 33 
-  For case 1 and case 2......................................................................................................................................... 34 
C. DEVELOPMENT OF THE CIVILIAN ASPECTS .......................................................................................................... 37 
- Police.................................................................................................................................................................. 37 
- CFSP .................................................................................................................................................................. 39 
- Community 
elements........................................................................................................................................... 39 
D. 
CO-ORDINATION, INCLUDING CIVIL-MILITARY CO-ORDINATION........................................................................... 39 
_______________________________________________________________________________  
8945/2/02  

ANNEX DG 

EN 

 
E. CONSULTATIONS AND CONTACTS........................................................................................................................ 40 
F. INFORMATION POLICY ......................................................................................................................................... 41 
PHASE 5   IMPLEMENTATION ................................................................................................................................ 42 
A. GENERAL IMPLEMENTATION, CIVILIAN ASPECTS AND CIVIL-MILITARY CO-ORDINATION .................................... 42 
-  Work within the EU ............................................................................................................................................ 42 
-  Consultations and contacts................................................................................................................................. 43 
B. CONDUCT OF THE MILITARY OPERATION ............................................................................................................. 44 
C. CONDUCT OF THE POLICE OPERATION AND OTHER TITLE V CIVILIAN INSTRUMENTS .......................................... 46 
D. 
CO-ORDINATION, INCLUDING CIVIL-MILITARY CO-ORDINATION........................................................................... 46 
E. INFORMATION POLICY ......................................................................................................................................... 48 
PHASE 6  REFOCUSING OF EU ACTION............................................................................................................... 49 
A. REFOCUSING OF EU ACTION............................................................................................................................... 49 
-  Work within the EU ............................................................................................................................................ 49 
-  Consultations and contacts................................................................................................................................. 50 
B. TERMINATION OF THE CURRENT MILITARY OPERATION WHERE APPROPRIATE .................................................... 51 
C. TERMINATION OF THE POLICE OPERATIONS AND OPERATIONS RELATED TO OTHER CIVILIAN INSTRUMENTS ...... 51 
D. COUNCIL DECISION.............................................................................................................................................. 52 
E. INFORMATION POLICY ......................................................................................................................................... 52 
F. DOCUMENTATION ............................................................................................................................................... 53 
G. LESSONS LEARNED.............................................................................................................................................. 53 
PHASE 7  STABILITY PROMOTION, POST CONFLICT RECONSTRUCTION.............................................. 54 
ANNEX 1: ILLUSTRATIVE LIST OF CIVILIAN INSTRUMENTS ...................................................................... 55 
ANNEX 2: TEMPLATE CRISIS MANAGEMENT CONCEPT............................................................................... 99 
 
 
 
_______________________________________________________________________________  
8945/2/02  

ANNEX DG 

EN 


Phase 1 
PHASE 1  ROUTINE PHASE  
The procedures outlined in the following are implemented in full compliance with the competencies 
attributed to Coreper by virtue of TEC Article 207. 
 
 


Pre-crisis, support to stability and conflict prevention   

Monitoring and analysis, early warning and advance planning 
 
 

A. 
Stability promotion and conflict prevention 
 
1. 
Following up the principles of the UN Charter and of the OSCE Charter for European 
Security as well as the objectives of the EU, as outlined in TEU, the Union is active in 
stability promotion, early warning and conflict prevention and cooperates with the UN, 
the OSCE, NATO, the Council of Europe and other international organisations in a 
mutually reinforcing manner. The EU contributes to these objectives for example 
through projects to combat the destabilising accumulation of small arms, and through a 
broad range of programmes in support of human rights, democracy, institution building 
and market economy, and with the full range of EU instruments including Community 
action and individual Member States' initiatives. The EU Programme for the Prevention 
of Violent Conflicts is being implemented.  
 
N.B. The instruments mentioned above can be used in all subsequent phases of a crisis. 
 
B. 
Monitoring and analysis of the situation, early warning 
 

Work within the EU 
 
2. 
The Member States and the Commission carry out routine monitoring and exchanges of 
information within the Political and Security Committee (PSC), as well as within the 
relevant geographic and thematic Council working groups. 
 
3. 
The EU joint Situation Centre (EU SITCEN), operating on a permanent basis, monitors 
international developments, provides early warning, receives and evaluates information 
and disseminates information and evaluation to competent bodies, and acts as point of 
operational contact for the SG/HR. 
 
_______________________________________________________________________________  
8945/2/02  

ANNEX DG 

EN 

Phase 1 
4. 
The EU Satellite Centre (SatCen), as directed by the SG/HR in accordance with the 
Joint Action, contributes to early warning. 
 
5. 
The Policy Unit provides the PSC with timely assessment and early warning of events 
or situations which may have significant repercussions for the EU's foreign and security 
policy. The Policy Unit produces policy options papers. 
 
6. 
Within the General Secretariat of the Council, the Police Unit 2 assists the SITCEN in 
collecting and evaluating information, in particular regarding public security and 
criminal issues related to potential crises, and thus contributes to early warning and 
situation assessment.3 
 
7. 
The Military Staff monitors potential crises inter alia by relying on appropriate national 
and multinational intelligence capabilities and performs early warning and situation 
assessment. 
 
8. 
The Military Committee provides the forum for military consultation and cooperation 
between the EU Member States in the field of conflict prevention and crisis 
management. Its Chairman participates as appropriate in the PSC. The military 
representatives of the Member States are encouraged to do likewise. The Military 
Committee assesses the risks of potential crises and provides military advice and makes 
recommendations to the PSC, at the latter's request or on its own initiative, acting within 
guidelines forwarded by the PSC.  
 
At the request of the PSC, the Committee for civilian aspects of crisis management 
(CIVCOM) may give advice, as appropriate, on civilian aspects related to potential 
crises. 
 
                                                 
2  
Co-ordinating and co-operating with their DG H (Justice and Home Affairs) counterparts, as required. 
 
3  
The “Police Action Plan”, contained in the Presidency report to Göteborg, points to the integration of police expertise and input into EU 
structures for early warning and timely assessment as an aspect deserving particular attention. 
_______________________________________________________________________________  
8945/2/02  
10 
ANNEX DG 

EN 

Phase 1 

Consultations and contacts 
 
9. 
The development of the ESDP will also lead to a genuine strategic partnership between 
the EU and NATO in the management of crisis with due regard for the two 
organisations' decision-making autonomy. 
 
Accordingly, in this phase the EU consults and cooperates with NATO in accordance 
with the provisions of the standing arrangements for consultation outside times of 
crisis 4. The Presidency, the SG/HR and the Council Secretariat including the Military 
Staff maintain regular contacts with NATO at the appropriate level. 
 
                                                 
4  
Meetings between the PSC and the NAC will be held not less than three times, and EU-NATO ministerial meetings not less than once, per 
EU Presidency. Either organisation may request additional meetings as necessary. Meetings between the EU and the NATO Military 
Committees may be held as required, at the request of either organisation with at least one such meeting during each Presidency. There may 
also be: 
 

meetings between subsidiary groups (e.g. PMG/PCG or Military Committee working groups); 
 

meetings in the form of ad hoc EU/NATO groups; 
 

expert groups along HTF Plus lines. 
 
When necessary, and in particular where NATO capabilities and expertise are concerned, NATO representatives will be invited to meetings, 
in accordance with the provisions of the TEU and on a basis of reciprocity. This will apply to: 
 

the Secretary General of NATO for ministerial meetings, in particular those attended by Defence Ministers; 
 

the Chairman of the NATO Military Committee for meetings of the Military Committee; 
 

DSACEUR for meetings of the Military Committee, in view of his responsibilities for the European pillar of NATO and his 
potential role in EU-led operations. 
_______________________________________________________________________________  
8945/2/02  
11 
ANNEX DG 

EN 

Phase 1 
10.  The EU consults with non-EU European NATO members and other countries which are 
candidates for accession to the EU in accordance with the provisions of the permanent 
consultation arrangements during non-crisis periods on involvement in crisis 
management operations with military and/or police forces.5 6 
 
11.  The EU conducts exchanges of information with third countries on ESDP and military 
crisis management within the framework of political dialogue. Contacts with other third 
countries are maintained as necessary. 
 
12.  Contacts and appropriate cooperation as necessary with the UN and other international 7 
and regional organisations (e.g. OSCE, Council of Europe), as well as with NGOs etc. 
are maintained. 
 
                                                 
5  
The PSC plays a leading role in the implementation of these arrangements, which include notably during each Presidency: 
 

a minimum of two meetings in EU+15 format and of two meetings in EU+6 format; 
 

one ministerial meeting bringing together the 15 and the 6 countries; 
 

a minimum of two meetings at Military Committee representative level, as well as exchanges at military experts level (in particular 
concerning the establishment of capability objectives).  
 
Each third country may appoint from its mission an ESDP interlocutor with regard to the PSC. To facilitate the association of third countries 
wishing to be involved in EU military activities, they may appoint an officer accredited to the EU Military Staff who will serve as a contact. 
A minimum of two information meetings will be held during each Presidency for these officers from the 15 and the 6 countries.  
 
6  
The Presidency report to the Göteborg European Council contains provisions on contributions of non-EU states to EU police missions in 
civilian crisis management (Annex II), the specific modalities of which are to be further elaborated as well as considered by the PSC. The 
Presidency report states that contributions by non-EU states to EU police missions will be given favourable consideration, in accordance with 
modalities to be determined with full respect for the decision-making autonomy of the EU and the single institutional framework of the 
Union. It suggests that dialogue and information in issues related to police could also take place within the EU+15 format. In the event of a 
crisis, this structure could also serve for consultation, in view of possible contributions to a mission, in the period leading up to a decision of 
the Council to launch a police operation. 
 
7  
See document "EU Cooperation with International Organisations in Civilian Aspects of Crisis Management" (Annex V to Presidency ESDP 
Report to the Göteborg European Council). 
 
_______________________________________________________________________________  
8945/2/02  
12 
ANNEX DG 

EN 

Phase 1 
C. 
Advance planning and preparatory actions, including civilian aspects and civil-military 
co-ordination 
 
13.  The PSC continues to monitor and assess potential crises. 
 
14.  The Military Committee continues to provide military advice and make 
recommendations to the PSC, at the latter's request or on its own initiative, acting within 
the guidelines forwarded by the PSC. 
 
15.  The Committee for Civilian Aspects of Crisis Management provides information, 
formulates recommendations and gives advice on civilian aspects of crisis management 
to the PSC and to the other appropriate Council bodies in accordance with their 
respective competencies. It helps to ensure a higher degree of inter-pillar coherence in 
the civilian aspects of EU crisis management, and promotes improvements in the crisis 
response capabilities of the EU. It contributes to the setting-up of mechanisms for the 
exchange of information, co-ordination, and rapid reaction between the Union and the 
Member States. It assists the PSC and other appropriate Council bodies to acquire a 
comprehensive view of the means available to the EU and to Member States. 
 
16.  The Member States provide the Co-ordinating Mechanism for civilian aspects of crisis 
management 8, set up at the Council Secretariat and fully interacting with the 
Commission services (hereafter the "Co-ordinating Mechanism"), with information on 
Member States' civilian crisis management assets available, including their state of 
readiness or deployment and any bilateral contributions. This information will be made 
available to Committee for Civilian Aspects of Crisis Management in order to ensure 
the necessary exchange of information and co-ordination between the EU and the 
Member States.  
 
                                                 
 
"A co-ordinating mechanism, fully interacting with the Commission services, should be set up at the Council Secretariat. It would run the 
database project and the different capabilities initiatives. In particular crises, depending on the EU’s role, it may set up an ad hoc centre to 
co-ordinate the effectiveness of EU Member States’ contributions. This should be a lean, efficient, non-bureaucratic structure permitting 
close interaction with the Commission ." (Presidency conclusions Helsinki, Annex 2 to Annex IV).  
 
_______________________________________________________________________________  
8945/2/02  
13 
ANNEX DG 

EN 

Phase 1 
17.  The Military Staff carries out the military aspects of strategic advance planning for the 
missions set out in Article 17(2) TEU. It also regularly reviews existing plans. As 
appropriate, it co-ordinates its planning activities with those of other General Secretariat 
or Commission services involved in crisis management. 
 
18.  The Police Unit conducts advance planning in close co-ordination with the Military 
Staff, as well as with other services of the General Secretariat and the Commission, as 
appropriate. 
 
19.  Close co-ordination takes place between the Council Secretariat and the Commission. 
This includes the possibility of co-ordinated advance planning. 
 
D. Information 
policy 
 
20.  The Presidency, SG/HR, Member States and the Commission implement a coherent 
information policy during the routine phase. 
 
21.  Co-ordination with a view to a coherent information strategy in response to crises takes 
place in the PSC. 
 
_______________________________________________________________________________  
8945/2/02  
14 
ANNEX DG 

EN 

Phase 2 
PHASE 2  CRISIS BUILD-UP 
 
–  Detection of the crisis, analysis, policy options, first measures taken 
The procedures outlined in the following are implemented in full compliance with the competencies 
attributed to Coreper by virtue of TEC Article 207. 
 
 
A. 

Detection of the crisis 
 

Work within the EU: analyses, policy options, first measures taken 
 
22.  The PSC monitors and assesses crises. The SG/HR, the Presidency, the Military 
Committee, a Member State and/or the Commission draw the attention of the PSC to a 
mounting crisis. 
 
23.  The provision of information, including intelligence, from Member States and the 
Commission is intensified. If necessary, the PSC identifies specific areas or subjects on 
which additional information is required. The PSC should have access to all necessary 
information processed through agreed channels (including from NATO, UN, OSCE and 
other international organisations) and to all proposals and initiatives relating to the 
crisis. 
 
24.  The EU SITCEN steps up the collection of information, processes it, and reports on the 
situation to the SG/HR and to the competent bodies for crisis management (in particular 
the PSC and the Military Committee). 
 
25.  The Council Secretariat provides analysis papers and policy options. To this end, 
Member States will provide classified information. The Commission provides policy 
analysis and policy options. Where relevant, analysis and policy option papers are 
prepared by the Commission and the Council Secretariat working together. 
 
_______________________________________________________________________________  
8945/2/02  
15 
ANNEX DG 

EN 

Phase 2 
26.  The SG/HR plays an important role in providing impetus in the definition and follow-up 
to the EU's response to a crisis. As part of his contribution to policy formulation under 
Article 26 TEU, he may draw on on-going work to present to the PSC his views on the 
crisis. 
 
27.  The Military Committee provides military advice and makes recommendations to the 
PSC, on the latter's request or on its own initiative, acting within guidelines forwarded 
by the PSC, with regard to the military dimension of a crisis and its implications.  
 
28.  Relevant geographical working groups examine particular aspects of the situation in 
greater detail, as appropriate, and report to the PSC. 
 
29.  The PSC meets to assess the causes and consequences of the crisis, on the basis of the 
information, policy options papers, advice and reports presented to it, and with a view to 
reaching a common political understanding of the crisis.  
 
30.  The Commission, which participates fully in the work of the PSC, informs the PSC on 
measures taken or under preparation and starts reflecting on the possible use of other 
instruments. Member States do likewise, informing the PSC on measures taken on a 
national basis. 
 
31.  In accordance with its preliminary political assessment, the PSC may review its 
information requirements and request specific information or types of reports from the 
EU SITCEN, the Commission and from Member States. The PSC may ask competent 
bodies to provide further analysis of the crisis. The SG/HR gives operational direction 
to the SATCEN to ensure that it will act in accordance with the PSC guidance and 
support as effectively as possible the decision-making of the Council and he reports as 
appropriate to the PSC. 
 
_______________________________________________________________________________  
8945/2/02  
16 
ANNEX DG 

EN 

Phase 2 
32.  The Committee for Civilian Aspects of Crisis Management provides information, 
formulates recommendations and gives advice on civilian aspects of crisis management 
to the PSC and to the other appropriate Council bodies in accordance with their 
respective competencies. The Committee assists these bodies in acquiring a 
comprehensive view of the means available to the EU and the Member States to respond 
to a crisis. To this effect, the Committee will use the relevant information from the Co-
ordinating Mechanism and the Police Unit as described below in paragraphs 43 and 44. 
 
33.  The SG/HR alerts other Council instances that might be called upon to participate in the 
crisis management.  
 
34.  The Council, either in a regular session or in an ad hoc session, may proceed to assess 
the situation and provide guidance to the PSC.  
 
35.  The PSC may agree that fact-finding missions (FFM) be dispatched to verify facts and 
assess the needs for further EU action. 
 

Co-ordination, including civil-military co-ordination 
 
36.  The Council Secretariat, including Military Staff and the Police Unit, and the 
Commission continue co-ordinated planning acting within their respective spheres of  
responsibility. 
 
_______________________________________________________________________________  
8945/2/02  
17 
ANNEX DG 

EN 

Phase 2 

Consultations and contacts 
 
37.  Contacts and meetings between EU and NATO are stepped upfrom the level of 
relevant services (including military staffs) and bodies, to Ministers if appropriate, so 
that, in the interest of transparency, consultation and cooperation, the two organisations 
can discuss their assessments of the crisis and how it may develop, together with any 
related security problems.  
 
38.  Dialogue and consultation with the non-EU European NATO members and other 
countries which are candidates for accession 9 to the EU are intensified at all levels, 
including ministerial level, in the period leading up to the Council decision. When a 
crisis develops, these intensified consultations will provide an opportunity for 
exchanges of views on situation assessment and discussion of the concerns raised by the 
countries affected, particularly when they consider their security interests to be 
involved. 
 
39.  Exchanges of information with other potential partners take place within the framework 
of political dialogue. Additional meetings are organised if the Council deems it 
necessary. Contacts with other third countries are intensified where necessary.  
 
40.  Contacts and appropriate cooperation as necessary with the UN and other 
international 10 and regional organisations (e.g. OSCE, Council of Europe), as well as 
with NGOs etc. are intensified. 
 
                                                 
 For 
police, see footnote 6. 
10  
See document "EU Cooperation with International Organisations in Civilian Aspects of Crisis Management" (Annex V to Presidency ESDP 
Report to the Göteborg European Council).  
 
_______________________________________________________________________________  
8945/2/02  
18 
ANNEX DG 

EN 

Phase 2 
B. 
Consideration that EU action is appropriate: identification of available instruments, 
capabilities and resources with a view to an overall approach (hereinafter crisis 
management concept) 
 

Work within the EU, including civilian aspects and civil-military co-ordination 
 
41.  The PSC, possibly in the light of Council guidance, analyses the situation and considers 
that EU action is appropriate (possibly on request from an international organisation, 
e.g. the UN or the OSCE.), triggering the development of a crisis management 
concept 11. To this end, it may provide guidance as appropriate. For this purpose, the 
PSC should have access to all necessary information processed through agreed channels 
(including from NATO, UN, OSCE and other international organisations), proposals 
and initiatives relating to the crisis in order to make a comprehensive assessment. After 
consulting the Presidency and without prejudice to Article 18 of the TEU, the SG/HR 
may chair the PSC.  
 
                                                 
11  
Crisis management concept: a conceptual framework describing the EU's overall approach to the management of a particular crisis, 
addressing the full range of activities. (See Annex 2 for a draft template crisis management concept.) The crisis management concept is an 
important tool to ensure the coherence and comprehensiveness of possible EU actions by taking account of the range and scale of the 
different instruments available to the Union.  
 
 
However, the structure of CMC will need to remain flexible and adaptable, as the actual shape of each CMC will be determined by a number 
of variables, such as the stage of a crisis at which a draft CMC is developed and presented to the PSC and the nature and location of the 
crisis. It is likely, for example, that at the beginning of a crisis a CMC might consider a broader range of options reflecting the early stage of 
internal EU deliberations on that crisis. By contrast, a CMC that was designed to address a crisis that had been extant for some time might 
focus on a much narrower range of options, reflecting the more developed understanding within the EU about what type of action would be 
appropriate. 
_______________________________________________________________________________  
8945/2/02  
19 
ANNEX DG 

EN 

Phase 2 
42.  An ad hoc crisis response co-ordinating team, consisting of Council Secretariat and 
Commission officials, is pulled together  12. It will prepare the draft crisis management 
concept. The SG/HR can draw on its work so that the draft crisis management concept 
presented to the PSC is both coherent and comprehensive and encompasses all relevant 
civilian and military instruments. 
 
43.  The EUMS, under the direction of the Military Committee acting within guidelines 
forwarded by PSC, contributes to the elaboration of the crisis management concept, in 
particular the definition of politico-military objectives for any possible military 
activities, the objectives and end-state that form the basis of the work on military 
strategic options. 
 
44.  The Member States provide the Co-ordinating Mechanism with information on civilian 
management assets available, including their state of readiness or deployment and any 
bilateral contributions (see paragraph 32). 
 
                                                 
12  
The ad hoc crisis response co-ordinating team is a vehicle for inter-service co-ordination in response to a given crisis. It will consist of 
officials from the relevant services in the Council Secretariat and the Commission. It will not be a standing structure but will be pulled 
together when a particular crisis occurs. As far as the Council Secretariat is concerned, the SG/HR will instruct the relevant services to 
participate in the team.  
 
 
The ad hoc team is a practical and effective way of ensuring at the working level that the Council and the Commission are in the position to 
ensure consistency in the external activities of the Union, in accordance with Article 3 second subparagraph TEU. The relevant co-ordination 
is between services, and is without prejudice to the prerogatives and obligations of the Institutions themselves. The team would thus help to 
ensure close two-way co-ordination in the planning of military and civilian measures. 
 
 
The team is not a Council working group. A fortiori, it does not take decisions. The SG can draw on its work so that the draft crisis 
management concept presented to the PSC is both coherent and comprehensive and encompasses all relevant civilian and military 
instruments. In addition, through the participation of Commission officials, the Commission can also use this work as a reference point when 
taking initiatives within its area of responsibility. This team would continue to work on planning as required in the light of the outcome of 
PSC meetings. The team would also assist in ensuring full coherence between the civilian and military aspects of the EU action in the 
implementation phase. 
 
For information aspects, the CRCT is supported by an Information Strategy Team consisting of Secretariat and Commission officials 
working in close contact with the Presidency. 
_______________________________________________________________________________  
8945/2/02  
20 
ANNEX DG 

EN 

Phase 2 
45.  Under the guidance of the PSC, the Police Unit produces analyses and general police 
options in order to contribute to the development of the draft crisis management 
concept, in particular by identifying police objectives, requirements for any possible 
police activity and available police capabilities and capacities (see paragraph 32).  
 
46.  Close contacts are maintained between the SG/HR and the Commission throughout the 
process.  
 
 
47.  The SG/HR presents the draft crisis management concept to the PSC. The Commission 
for its part will present the elements of the draft CMC which pertain to its competence. 
The PSC: 
 
-  gives guidance for the further development of the draft CMC, including for the 
coherent development of the different civilian and military elements; 
 

as appropriate, requests military advice from the EUMC for the military aspects of 
the draft CMC and requests CIVCOM to give the PSC a comprehensive overview 
of the civilian means available to the EU and to the Member States. 
 
48.  The Military Committee provides military advice to the PSC on the military aspects of 
the draft crisis management concept, on possible military strategic objectives including 
an assessment of the potential availability of military capabilities and capacities 
including in support of civilian instruments. Its Chairman participates in the PSC. The 
military representatives of the Member States are encouraged to do likewise. 
 
49.  Upon request from PSC, CIVCOM will give advice on all civilian aspects of the draft 
crisis management concept. 
 
_______________________________________________________________________________  
8945/2/02  
21 
ANNEX DG 

EN 

Phase 2 
50.  The PSC examines all the options that might be considered as the Union's response 
within the single institutional framework and without prejudice to the decision-making 
and implementation procedures established in the Treaties. To this end, the PSC: 
•  makes the general political assessment, keeping in mind the totality of measures 
applicable, and,  
•  after further discussion, if needed in an iterative process, finalises the draft crisis 
management concept and prepares an opinion to Council identifying the political 
objectives to be pursued by the Union and suggesting a cohesive set of options 
aimed at contributing to the settlement of the crisis.  
 
 
The Commission, which participates fully in the work of PSC, informs the PSC on 
measures taken or under preparation. Each measure will be dealt with by the competent 
body according to the applicable procedures: for Community measures, Coreper 
exercises fully its role. Member States inform the PSC about measures taken or that 
they intend to take at national level. 
 
51.  Meanwhile, monitoring of the developing crisis continues, information gathering is 
strengthened from all available sources such as missions of the Member States, 
Commission delegations, international organisations and NGOs on the ground, 
exploitation of SATCEN products, etc.  
 
_______________________________________________________________________________  
8945/2/02  
22 
ANNEX DG 

EN 

Phase 2 

Consultations and contacts 
 
52.  The EU maintains intensified dialogue and consultations with NATO (see § 37). 
 
53.  The EU maintains intensified consultations with the non-EU European NATO members 
and other countries which are candidates for accession to the EU 13 (see § 38), in 
particular: 
 
a) 
possibility of extra meetings if circumstances require; 
 
b) 
Military Staff holds information meetings for officers from the 15 and the 6 
serving as point of contact to the Military Staff. 
 
54.  Contacts with other third countries (see § 39) that are envisaging contributing to the 
management of the crisis are further intensified.  
 
55.  Contacts and appropriate cooperation as necessary with the UN and other international 
and regional organisations (e.g. OSCE, Council of Europe), NGOs etc. that are 
envisaging contributing to the management of the crisis are further intensified. 
 
C. Information 
policy 
 
56.  The PSC ensures co-ordination of a preliminary EU information strategy in relation to 
the crisis in the build-up phase. The Presidency, SG/HR, Member States and the 
Commission implement this preliminary coherent information strategy. For the possible 
EU response to the crisis, the draft crisis management concept presented by the SG/HR 
to the PSC includes a draft information strategy in support of the proposed options. 
 
                                                 
13  
For police, see footnote 6. 
  _______________________________________________________________________________  
8945/2/02  
 
23 
ANNEX DG 

EN 

Phase 3 
PHASE 3  APPROVAL OF THE CRISIS MANAGEMENT CONCEPT 
The procedures outlined in the following are implemented in full compliance with the competencies 
attributed to Coreper by virtue of TEC Article 207. 
 
A. 

Approval of the crisis management concept 
 

Work within the EU 
 
57.  The Council approves, on the basis of an opinion by the PSC, the general political 
assessment and a cohesive set of options. In particular, the Council: 
 
a) 
if European Council conclusions exist, further specifies the EU political 
objectives; otherwise, the Council may define such objectives; 
 
b) 
agrees the CMC14, including civilian and military aspects as appropriate; 
 
c) 
invites the Commission to submit appropriate proposals or adopt the measures 
which pertains to its competence in order to pursue the political objectives thus 
selected; 
 
d) 
invites Member States to orient their action in accordance with the crisis 
management concept. 
 
                                                 
14  
The crisis management concept will evolve as a function of developments of the situation. It might be modified as required. 
_______________________________________________________________________________  
8945/2/02  
24 
ANNEX DG 

EN 

Phase 3 
58.  The PSC requests the Military Committee to issue an MSOD and gives guidance for the 
further development of the civilian instruments, including the possible police mission, 
on the basis of the crisis management concept with a view to ensuring that they are 
coherent with the development of the MSOs. The EU SITCEN continues to produce 
comprehensive and timely situation reports and assessments, especially to the SG/HR, 
the PSC and other competent bodies for crisis management. 
 

Consultations and contacts 
 
59.  The EU maintains intensified dialogue and consultations with NATO (see § 37 and 
§71). 
 
60.  The EU intensifies dialogue and consultation with the 15 and with the 6 at all levels, 15 
including ministerial level, to exchange views on situation assessment and discusses the 
concerns raised by the countries affected, particularly when they consider their security 
interests to be involved (see also § 70 and § 71, second sub-paragraph). 
 
61.  Consultations with other potential partners: 
 
a) 
take place in the framework of political dialogue; if the Council deems it 
necessary, additional meetings in the PSC Troika format are organised. 
 
b)  when a military operation is being considered, the Troika or the SG/HR assisted by 
the Chairman of the EUMC in his capacity as his military adviser, as appropriate 
conduct such consultations, which constitute the framework for exchanges of views 
and discussions on possible participation by potential partners (see also §71, second 
sub-paragraph for Canada). 
 
c) 
Police issues could be included in the dialogue, co-operation and consultation on 
ESDP issues with potential partners. 
 
                                                 
15 
For police, see footnote 6. 
 
_______________________________________________________________________________  
8945/2/02  
25 
ANNEX DG 

EN 

Phase 3 
62.  Contacts with other third countries are maintained as necessary. 
 
63.  Intensive contacts and appropriate cooperation as necessary with the UN and other 
international 16 and regional organisations (e.g. OSCE, Council of Europe), as well as 
with NGOs etc. are maintained. 
 
B. 
Development of the military elements of the EU approach 
 
64.  Upon the PSC's request (including guidance as appropriate), the Military Committee 
issues a Military Strategic Option Directive to the Director General of the Military Staff 
to draw up and present prioritised military strategic option(s). This military directive 
will translate the PSC request, including such guidance as the PSC considers 
appropriate, into military terms.  
 
65.  In support of initial planning Member States give preliminary indications to the Military 
Staff of their intention to contribute to an EU-led operation. 
 
66.  As appropriate, building on previous contacts and without prejudice to a decision by 
Council (§ 76 f), in support of initial planning, interested third countries give 
preliminary indications to the Military Staff of their intention to contribute to an EU-led 
operation. 
 
67.  Having received the Military Strategic Option Directive from the Military Committee, 
the Military Staff develops and prioritises military strategic options as the basis for the 
military advice of the Military Committee to the PSC by: 
 
a) 
defining initial broad options; 
 
                                                 
16  
See document "EU Cooperation with International Organisations in Civilian Aspects of Crisis Management" (Annex V to Presidency ESDP 
Report to the Goteborg European Council).  
_______________________________________________________________________________  
8945/2/02  
26 
ANNEX DG 

EN 

Phase 3 
b) 
drawing as appropriate on planning support from external sources either using the 
assured access to NATO 17 or national planning capabilities or multinational HQs 
available to the EU which will analyse and further develop those options in more 
detail; 
 
c) 
evaluating the results of this more detailed work and commissioning any further 
work that might be necessary; 
 
d) 
presenting an overall assessment, with an indication of priorities and 
recommendations as appropriate, to the EUMC.  
 
Developed and prioritised military strategic options should include an assessment of 
feasibility and risk, a C2 structure including recommendations regarding an Operation 
Commander, an Operation Headquarters, a Force Commander, a Force Headquarters, 
Force capability requirements and an indication of forces that might be made available 
by contributing states; 
 
68.  The Military Committee evaluates the prioritised military strategic options developed by 
the Military Staff and forwards them to the PSC, together with its evaluation and 
military advice. 
 
69.  The PSC, based on the advice by the Military Committee, evaluates the military 
strategic option(s), and prepares an opinion to Council recommending the preferred 
military strategic option(s). 
 
                                                 
17  
Bearing in mind the potential role of DSACEUR. 
_______________________________________________________________________________  
8945/2/02  
27 
ANNEX DG 

EN 

Phase 3 
70.  Consultations with the 15 and with the 6 (which could be held at politico-military 
experts level) 18 take place with the aim of ensuring that the countries potentially 
contributing to an EU-led military crisis management operation are informed of the 
EU's intentions, particularly with regard to the military strategic options being 
envisaged. 
 
71.  Should the Union intend to look more closely at an option calling for pre-identified 
NATO assets and capabilities the PSC will so inform the NAC. 
 
Once the EU begins to examine in depth an option requiring the use of NATO assets 
and capabilities, particular attention will be paid to consultation of the six non-EU 
European NATO members and with Canada.  
 
C. 
Development of civilian aspects of the EU approach 
 
72.  The Member States provide the Co-ordinating Mechanism with information on civilian 
crisis management assets available, including their state of readiness or deployment and 
any bilateral contributions. The Committee for Civilian Aspects of Crisis Management 
and the Commission assists the PSC and other appropriate Council bodies to acquire a 
comprehensive view of the means available to the EU and to the Member States in order 
to improve co-ordination of resources of the Union and Member States through 
exchange of information. 
 
 
 
Work of the co-ordinating mechanism continues. 
 
73.  The PSC examines the full range of civilian instruments, including possible police 
options, that may be employed in the context of the response to the crisis, within the 
single institutional framework and without prejudice to the decision making and 
implementation procedures established in the Treaties, and for their coherence with the 
MSOs. In this process, the Commission presents the measures it has adopted or is 
envisaging. In accordance with § 57 (c), the Commission may as appropriate alter 
existing measures and/or develop additional envisaged measures and inform the PSC 
accordingly. 
                                                 
18  For 
police, see footnote 6. 
 
_______________________________________________________________________________  
8945/2/02  
28 
ANNEX DG 

EN 

Phase 3 
 
a) 
Planning for police options. 
 
 
If a possible police option is envisaged, the PSC will request the Police Unit, 
through the SG/HR, to develop and prioritise police strategic options as the basis 
for the advice by CIVCOM to the PSC. The police strategic options should 
include an assessment of feasibility and risk, a C2 structure (including 
recommendations regarding a Police head of Mission (PHM), an Operation 
Headquarters and Force requirements). It should describe the desired end-state 
and the general objective of police activities. 
 
CIVCOM evaluates, if instructed to do so by the PSC, the Police strategic options 
elaborated by the Police Unit and presents its advice on these options to the PSC. 
 
The PSC evaluates the police strategic options and makes the appropriate 
recommendations to the Council, including the preferred Police strategic 
option(s). 
 
 
_______________________________________________________________________________  
8945/2/02  
29 
ANNEX DG 

EN 

Phase 3 
D. 
Co-ordination, including civil-military co-ordination 
 
74.  In order to ensure coherence at the planning stage in the context of a possible Joint 
Action or where a Joint Action is initiated in parallel to existing or imminent 
Community measures, the crisis response co-ordinating team will: 
 
a) 
work to ensure good co-ordination of plans involving civilian instruments from 
the first and second pillar, particularly but not exclusively in the areas of police, 
strengthening the Rule of Law, Civil Administration and Civil Protection; 
 
 
 
b) 
contribute to the coherence between measures regarding Title V civilian 
instruments and measures taken or arranged by the Commission within the option 
for overall response approved by the Council, and the development of Military 
Strategic Options; 
 
 
 
c) 
develop the appropriate sequence of military and civilian instruments. 
 
E. Information 

policy 
 
75.  On the basis of the elements contained in the crisis management concept, the PSC 
ensures co-ordination of the EU information strategy in relation to the crisis and to the 
possible EU response to the crisis. The Presidency, SG/HR, Member States and the 
Commission implement this coherent information strategy. 
 
The information strategy is taken into account in the development of the military 
elements (MSOs) and of the civilian aspects of the EU approach to the crisis. 
 
_______________________________________________________________________________  
8945/2/02  
30 
ANNEX DG 

EN 

Phase 4 
PHASE 4  FORMAL DECISION TO TAKE ACTION  
The procedures outlined in the following are implemented in full compliance with the competencies 
attributed to Coreper by virtue of TEC Article 207. 
 
 
A. 

Council decision to take action 
 
76.  The PSC submits an opinion to the Council recommending the adoption of a decision to 
take action. The Council adopts the decision to take action to tackle the crisis (this 
decision could, where appropriate, take the form of a Joint Action in full respect of the 
single institutional framework and of Article 47 of the TEU). Within that decision, the 
Council inter alia: 
 
a) 
defines the political context in which the Joint Action is to be carried out; 
 
b) 
takes the necessary measures to that end including when appropriate the selection 
of a military strategic option.; 
 
c) 
defines the conditions under which the SG/HR will be responsible for 
implementing, within the framework established in Title V TEU, political, police, 
military and other aspects of the crisis management operation. For such measures, 
SG/HR acts with the assent of the PSC, which exercises the political control and 
strategic direction of crisis management operations. 
 
d) 
invites the Commission to direct its action towards achieving the objectives and 
priorities of the Joint Action, where appropriate by pertinent Community 
measures or notes that the Commission intends to do so; 
 
_______________________________________________________________________________  
8945/2/02  
31 
ANNEX DG 

EN 

Phase 4 
e) 
invites Member States to direct their action in support of the Joint Action.  
 
f) 
decides whether third countries will be invited to contribute. 
 
In parallel the Council may adopt any new Commission proposals for additional 
measures falling under the EC Treaty. Such measures will be agreed following normal 
procedures and in full respect of the role of Coreper
 
B. 
Selection of a military strategic option 
 
77.  The Council, in the light of the opinion delivered by the PSC based on the advice from 
the Military Committee, selects a military strategic option including a proposed chain of 
command (cf. § 67), and invites Member States to confirm, subject to national 
procedures, their readiness to support the selected option. 
 
 
The Chairman of the Military Committee attends the Council meeting acting as the 
spokesman of the Military Committee. 
 
78.  The military strategic option selected by the Council implies either an EU military 
operation without use of NATO assets and capabilities or an EU military operation with 
recourse to NATO assets and capabilities. (NB. The order of the cases does not imply a 
priority choice.) 
 
_______________________________________________________________________________  
8945/2/02  
32 
ANNEX DG 

EN 

Phase 4 

Case 1: 
EU military operation without use of NATO assets and capabilities 
 
 a) 
The 
Council: 
 
• 
appoints the Operation Commander and designates the Operation 
Headquarters; 
• 
designates the Force Commander, (the Force Headquarters and the 
Component Commands, if appropriate) 
 
b)   Non-EU European NATO members and other candidates for accession to the EU 
having, upon invitation to give such indication, expressed a clear intention to 
participate in the operation, may deploy liaison officers to European operation 
headquarters, in order to enable the exchange of information on the operational 
planning and on the foreseen contribution. 
 
c) 
EU keeps NATO informed of the general progress in preparations.  
 

Case 2: 
EU military operation with recourse to NATO assets and capabilities 
 
a) 
Staffs of the two organisations, in close contact with DSACEUR as strategic co-
ordinator, meet in order to specify the pre-identified NATO assets and capabilities 
considered for this option. 
 
b) 
The EU addresses a formal request to NATO for the use of its assets and 
capabilities. 
 
_______________________________________________________________________________  
8945/2/02  
33 
ANNEX DG 

EN 

Phase 4 
 
 
c) 
NATO assets and capabilities needed for the EU operation, as well as the 
modalities for their release, including the possible conditions for their recall, are 
identified at a PSC/NAC meeting. 
 
d) 
The Council, on the basis of responses from NATO and the Member States: 
 
• 
appoints the Operation Commander and designates the Operation 
Headquarters; 
 
• 
designates the Force Commander, (the Force Headquarters and the 
Component Commands, if appropriate); 
 
• 
approves on the basis of the "Berlin Plus" agreement the arrangements for 
hand-over and any recall conditions. 
 
 
 
e) 
The non-EU European allies will be involved in the planning according to the 
procedures laid down within NATO. 
 

For case 1 and case 2 
 
79.  On the basis of the military strategic option selected by the Council, the PSC sends such 
guidance to the EUMC as is necessary for EUMC to direct to the EUMS to draft the 
Initiating Military Directive. The Initiating Military Directive will include those 
directives required by the Operation Commander to enable him to draw up the 
necessary planning documents (CONOPS, Statement of Requirements (SOR), OPLAN). 
The PSC will approve the Initiating Military Directive before its release is authorised by 
the EUMC.  
 
_______________________________________________________________________________  
8945/2/02  
34 
ANNEX DG 

EN 

Phase 4 
80.  On the basis of the Initiating Military Directive, the Operation Commander prepares a 
"Concept of operations" (CONOPS), including guidelines on the use of force and a 
Statement of Requirements (SOR). 
 
81.  Upon request of the PSC, the Military Committee tasks the Operation Commander, 
assisted by the Military Staff, to hold technical exchanges in order to present operational 
planning work to the non-EU European NATO members and the other candidates for 
accession to the EU, invited to take part in the operation by the Council, that have 
expressed their intention in principle of taking part in the operation, so as to enable 
those countries to determine the nature and volume of the contributions they could make 
to the EU-led operation. These countries, and other third countries, which have 
expressed their intention, will provide the Operation Commander with an initial 
indication of their contribution. 
 
[Alternative A: 
82.  The PSC submits to the Council its opinion on CONOPS based on the advice and 
recommendations of the Military Committee supported by an evaluation from the 
Military Staff. The Council, possibly convened in an extraordinary session, approves 
CONOPS including guidelines on the use of force and formally invites third countries to 
participate in the operation.] 
 
OR  
 
[Alternative B: 
 
Based on the advice and recommendations of the Military Committee supported by an 
evaluation from the Military Staff, the PSC reaches agreement on the CONOPS 
including guidelines on the use of force and suggests that the Council by simplified 
written procedure agree to formally invite third countries to participate in the operation.] 
 
_______________________________________________________________________________  
8945/2/02  
35 
ANNEX DG 

EN 

Phase 4 
83.  Subsequently, the Operation Commander prepares a "Operation Plan" (OPLAN) with 
guidelines on the use of force, which will include the Rules of Engagement (RoE).  
 
84.  Upon request of the PSC, the Military Committee tasks the Operation Commander, in 
co-ordination with the Military Staff, to conduct the Force Generation process. 
 
85.  Member States, NATO when appropriate, and other troop contributors confirm the level 
and quality of their contributions at the Force Generation Conferences. 
 
86.  When appropriate, the Council Secretariat will prepare a draft Status of Forces (SOFA). 
The draft SOFA will be submitted to the Council by the PSC on the basis of the Military 
Committee’s military advice (given after consultation with the Operation Commander). 
 
87.  A PSC/NAC meeting will confirm, if appropriate, the availability of pre-identified 
assets and capabilities and all the practical arrangements, including hand-over and 
recall. 
 
88.  The PSC submits to the Council its opinion on the OPLAN with the advice and 
recommendations of the Military Committee, supported by an evaluation from the 
Military Staff. 
 
89.  Following the Force Generation Conferences, the Council, possibly convened in an 
extraordinary session, on the basis of the opinion of the PSC:  
 
a) 
approves the OPLAN and the guidelines on the use of force, which will include 
the RoE; 
 
_______________________________________________________________________________  
8945/2/02  
36 
ANNEX DG 

EN 

Phase 4 
b) 
decides to launch the operation once all preconditions such as the force generation 
are complete; 
 
c) 
approves, where appropriate, the SOFA; 
 
d) 
adopts the decision setting up the Committee of Contributors; 
 
The Chairman of the Military Committee, supported by the Operation Commander, 
attends the Council meeting acting as the spokesman of the Military Committee.  
 
C. 
Development of the civilian aspects  
 
- Police 
 
 
90.  The Council, in the light of the recommendations from the PSC, selects a Police 
strategic option.  The Council will also appoint the PHM. 
 
As appropriate on the basis of the Police strategic option, the PSC, through the SG/HR, 
requests the Police Unit to start operational planning through the development of a 
CONOPS and the elaboration of the Statement of Forces requirement (SOR, which is 
the Police Unit assessment of the forces required to execute the mission).  Upon this 
appointment, the PHM will have the possibility to assist the Police Unit in drafting the 
CONOPS. 
 
The CONOPS and the SOR are submitted to CIVCOM for consideration and advice 
before being presented to the PSC. 
 
In the light of advice and recommendations of CIVCOM, the PSC [agrees the 
CONOPS] [evaluates the CONOPS which is then submitted to the Council for 
approval]. 
 
_______________________________________________________________________________  
8945/2/02  
37 
ANNEX DG 

EN 

Phase 4 
Once the CONOPS is approved, the PHM, assisted by the appropriate staff (after his 
appointment, a planning team may be established for this purpose), and as necessary by 
the Police Unit will be responsible for the production of the Operation Plan (OPLAN). 
Furthermore, the Police Unit will contribute in support of the PHM to the elaboration of 
the appropriate Rules of Engagement (ROEs) and the Force Generation Process. 
 
CIVCOM provides advice and recommendations to the PSC on the OPLAN, including 
an annex on ROEs. 
 
In the light of advice and recommendations of CIVCOM, the PSC evaluates the 
OPLAN which is then submitted to the Council for approval. 
 
91.  Upon decision by the Council to launch a police operation or an integrated operation 
with police components: 
•  the full strength of Member States' pledges is assessed on the basis of the Co-
ordinating Mechanism's work 19 and according to modalities to be established; 
•  non-EU states that are willing and capable of contributing to a particular operation 
may be invited, by a decision by the Council, to take part in the operation.  
 
                                                 
19  
Additional modalities to generate the full requirement of a police element may need to be addressed. Reference to Annex II of the Göteborg 
ESDP report. 
_______________________________________________________________________________  
8945/2/02  
38 
ANNEX DG 

EN 

Phase 4 
- CFSP 
 
92.  The Council Secretariat undertakes all the preparatory work, in cooperation with the 
Commission as appropriate, for presentation to the PSC with a view to implementation 
of CFSP elements. 
 
- Community 
elements 
 
93.  All Community measures are put forward by the Commission, and adopted and 
implemented in accordance with the relevant procedures. 
 
D. 
Co-ordination, including civil-military co-ordination 
 
94.  Within the PSC, the Member States and the Commission confirm information on the 
civilian crisis management assets that they have committed for the implementation of 
the Council decision as well as their state of readiness or deployment and any bilateral 
contributions. 
 
95.  The Commission completes plans for the measures falling within its area of 
responsibility.  
 
 
 
The Council Secretariat including the Police Unit, in consultation with the Commission 
as appropriate, completes plans for police (Title V) and for other CFSP instruments. 
The planning capacity of the Council Secretariat could be reinforced by the addition, on 
an ad hoc basis, of national experts. 
 
 
 
The parallel development of the military and the police planning processes will facilitate 
their co-ordination and synchronisation mainly through joint meetings of the respective 
planning staffs at different stages. 
_______________________________________________________________________________  
8945/2/02  
39 
ANNEX DG 

EN 

Phase 4 
96.  The crisis response co-ordinating team supports (cf. § 74) the completion of the co-
ordination of the planning. 
 
97.  The EU SITCEN continues to produce comprehensive and timely situation reports and 
assessments, especially to the SG/HR, the PSC and other competent bodies for crisis 
management. 
 
E. 
Consultations and contacts 
 
98.  The EU maintains: 
 
 
 
a) 
intensified dialogue and consultations with NATO (see in particular § 78, 
Case 1. c) and Case 2; 
 
 
 
b) 
dialogue and consultations with the 15 and the 6 countries (see also § 78, 
Case 1. b) and Case 2. e)); 
 
 
 
c) 
contacts with third countries in the framework of political dialogue; 
 
 
 
d) 
contacts with other third countries concerned where necessary; 
 
 
 
e) 
contacts and appropriate cooperation as necessary with the UN and other 
international 20 and regional organisations (e.g. OSCE, Council of Europe), as 
well as with NGOs etc. 
 
                                                 
20  
See document "EU Cooperation with International Organisations in Civilian Aspects of Crisis Management" (Annex V to Presidency ESDP 
Report to the Göteborg European Council).  
_______________________________________________________________________________  
8945/2/02  
40 
ANNEX DG 

EN 

Phase 4 
F. Information 
policy 
 
99.  The PSC ensures co-ordination of the EU information strategy in relation to the crisis 
and to the EU response to the crisis. The Presidency, SG/HR, Member States and the 
Commission implement this coherent information strategy. 
 
The information strategy is taken into account in the development of military elements 
(MSOs) and the civilian aspects of the EU approach to the crisis. 
 
 
_______________________________________________________________________________  
8945/2/02  
41 
ANNEX DG 

EN 

Phase 5 
PHASE 5  IMPLEMENTATION 
The procedures outlined in the following are implemented in full compliance with the competencies 
attributed to Coreper by virtue of TEC Article 207. 
 
 
A. 
General implementation, civilian aspects and civil-military co-ordination 
 

Work within the EU 
 
100. The Council exercises the overall responsibility for the conduct of the action. 
The Council: 
 
a) 
receives reports and updates from the SG/HR in his role as PSC Chairman on the 
follow-up measures (Title V TEU political, police, military and other aspects) it 
entrusted to him and gives the necessary direction. The Chairman of the Military 
Committee represents the Military Committee at the Council meetings, as 
appropriate;  
 
b) 
considers the adoption of further proposals that may be presented meanwhile by 
the Commission, taking into account the need to ensure coherence of the EU crisis 
management action; 
 
c) 
receives reports from the Commission on the implementation of measures within 
its area or responsibility; 
 
d) 
receives reports from Member States on national measures. 
 
101.  Throughout the implementation: 
 
a) 
the SG/HR takes the necessary follow-up measures as entrusted to him by the 
Council according to the conditions defined in the Joint Action;  
 
_______________________________________________________________________________  
8945/2/02  
42 
ANNEX DG 

EN 

Phase 5 
b) 
the Commission keeps the PSC informed about the measures it has taken or 
envisages. The Commission ensures the proper implementation of Community 
measures according to the applicable procedures; 
 
c) 
in accordance with the provisions set in the Joint Action, without prejudice to the 
role of the Commission, the PSC:  
− 
under the authority of the Council, and within the scope of Title V (TEU), 
exercises political control and strategic direction of the crisis management 
operation, including, of the military and police operations (see §106 and 
113);  
− 
oversees the implementation of all the measures taken and assesses their 
effect, recommending adjustments as necessary; 
 
 
 
d) 
the EU SITCEN continues to produce comprehensive and timely situation reports 
and assessments, especially to the SG/HR, the PSC and other competent bodies 
for crisis management. 
 

Consultations and contacts 
 
102.  The EU maintains contacts with NATO, the 15 and the 6 countries.  
 
103.  Contacts with other third countries concerned are maintained as necessary. 
 
104.  Contacts and appropriate cooperation as necessary with the UN and other relevant 
international 21 and regional organisations (e.g. OSCE, Council of Europe), as well as 
with NGOs etc. dealing with the crisis are maintained. 
 
105.  For the Committee of Contributors, see § 112 below. 
 
                                                 
21  
See document "EU Cooperation with International Organisations in Civilian Aspects of Crisis Management" (Annex V to Presidency ESDP 
Report to the Göteborg European Council). 
_______________________________________________________________________________  
8945/2/02  
43 
ANNEX DG 

EN 

Phase 5 
B. 
Conduct of the military operation 
 
106.  The PSC exercises, under the authority of the Council, the political control and strategic 
direction of the military operation (see also § 101 c)) throughout its duration. 
 
107.  Throughout the operation, the Chairman of the Military Committee acts as the primary 
point of contact with the Operation Commander. 
 
108.  The Military Committee, supported by the Military Staff, monitors the proper execution 
of military operations conducted under the responsibility of the Operation Commander 
by: 
 
 
a) 
reporting regularly to the PSC on the military implementation of the operation; to 
that end, the Chairman of the Military Committee participates in the PSC. 
 
b) 
providing, in co-ordination with the Operation Commander, information and 
assessments to the PSC; 
 
c) 
elaborating as necessary, in the light of political and operational developments 
and in accordance with guidance set by the PSC, new military strategic options 
(cf. § 67); 
 
d) 
advising the PSC on the merits of carrying on, changing or terminating the 
operation. 
 
109.  In case of an EU operation without the use of NATO assets and capabilities, the EU 
keeps NATO informed of the general progress of the operation.   
 
_______________________________________________________________________________  
8945/2/02  
44 
ANNEX DG 

EN 

Phase 5 
110.  In the event of an operation calling on NATO assets and capabilities, NATO will be 
kept informed of the use of its assets and capabilities throughout the operation, if 
necessary by convening a meeting of the PSC and the NAC. When NATO command 
options are being used, NATO will be informed of the development in the situation by 
appropriate EU bodies, in particular the PSC and the Chair of the Military Committee. 22 
 
111.  The Military Committee monitors the proper execution of military operations conducted 
under the responsibility of the Operation Commander. To this effect, the Military 
Committee may invite the Operation Commander to report on the progress of the 
operation. The President of the Council and the Chairman of the PSC respectively may 
invite the Operation Commander to the GAC and the PSC. 
 
112.  The Committee of Contributors meets regularly during the operation. It will be supplied 
with detailed information regarding the operation on the ground via the EU bodies 
responsible for follow-up. It receives regular information from the Operation 
Commander who may be heard by the Committee. It deals with the various problems 
concerning the implementation of the military operation, the use of forces, and all day to 
day management matters which are not exclusively, under the instructions he will have 
received, the responsibility of the Operation Commander. The Committee provides 
opinions and recommendations on possible adjustments to operational planning, 
including possible adjustments to objectives, which may affect the situation of the 
forces. In these areas, the PSC, which exercises the political control and strategic 
direction of the operation, will take account of the views expressed by the Committee of 
Contributors. Depending on the nature of its tasks, the Committee may meet in the 
appropriate format. For Member States, it may be comprised of representatives on the 
PSC and on the Military Committee.  
 
                                                 
22  
In the case of an EU-led operation calling for a NATO command option, the entire chain of command must remain under the political control 
and strategic direction of the EU throughout the operation, after consultation between the EU and NATO. In that framework the operation 
commander will report on the conduct of the operation to EU bodies only. 
_______________________________________________________________________________  
8945/2/02  
45 
ANNEX DG 

EN 

Phase 5 
The Committee of Contributors will usually be chaired by a representative of the 
SG/HR or the Presidency, assisted by the Chairman of the Military Committee or his 
Deputy. The Director General of the Military Staff and the Operation Commander may 
also attend or be represented in the Committee. The Chairman of the Committee of 
Contributors will be responsible for conveying the outcome of the Committee's 
discussions to the PSC and to the Military Committee.  
 
C. 
Conduct of the police operation and other Title V civilian instruments 
 
113.  The PSC exercises, under the authority of the Council, the political control and strategic 
direction of the police operation. 
 
Police 
 
 
 
The SG/HR shall, in accordance with the terms of the Joint Action, give guidance to the 
PHM, through the EU Special Representative (EUSR) if such a representative has been 
appointed. 
 
The PHM will be responsible to the PSC, via the EUSR if such a representative has 
been appointed, and the SG/HR. The Police Unit will provide technical support to the 
PHM notably by acting as first point of contact for such issues. 
 
D. 
Co-ordination, including civil-military co-ordination 
(see also § 94-956) 
114.  The crisis response co-ordinating team will assist in ensuring full coherence between the 
civilian and military aspects of the EU action; 
 
115.  The Council Secretariat, where appropriate, reinforced as foreseen in § 95, prepares 
plans as regards other CFSP instruments.  
 
116.  On an ad hoc basis, the Council might appoint a Special Representative in order to 
ensure the coherence of all EU actors deployed in the field in the context of an EU crisis 
management operation. 
 
PM   Modalities for co-ordination between the EU actors in the field as well as between the field 
_______________________________________________________________________________  
8945/2/02  
46 
ANNEX DG 

EN 

Phase 5 
and Brussels need to be developed. In addition, modalities for co-ordination in the field 
between the EU and international organisations, local authorities and NGOs need to be 
developed.  
 
_______________________________________________________________________________  
8945/2/02  
47 
ANNEX DG 

EN 

Phase 5 
E. Information 
policy 
 
117.  The PSC ensures co-ordination of the EU information strategy in support of the EU 
response to the crisis. The Presidency, SG/HR, Member States and the Commission 
implement this coherent information strategy. 
 
The information strategy is implemented and co-ordinated throughout the conduct of the 
military operation and/or the police operation and/or other civilian actions. 
 
_______________________________________________________________________________  
8945/2/02  
48 
ANNEX DG 

EN 

Phase 6 
PHASE 6  REFOCUSING OF EU ACTION 
The procedures outlined in the following are implemented in full compliance with the competencies 
attributed to Coreper by virtue of TEC Article 207. 
 
 
A. 
Refocusing of EU Action 
NB.  Activities are described here for ease of reference but may take place in earlier or subsequent 
phases. 
 

Work within the EU 
 
118.  The PSC, as part of its continuous political assessment of the situation, as appropriate 
on the basis of new information, policy options papers, advice and reports presented to 
it, evaluates the political appropriateness of refocusing EU action and in particular of 
discontinuing some actions employed to resolve the crisis, including the military 
operation. The termination of the current military operation may or may not be 
accompanied by a transition to other military measures or to civilian measures. The 
refocusing of EU action may trigger a revised crisis management concept, which would 
be developed following the procedures outlined in the previous phases. 
 
119.  The crisis response co-ordinating team as appropriate:  
 
a) 
works to prepare co-ordinated plans necessary for the refocused EU action 
involving civilian instruments from the first and second pillar, particularly but not 
exclusively in the areas of police, strengthening the Rule of Law, Civil 
Administration and Civil Protection; 
 
b) 
contributes to ensure consistency and develops the appropriate sequence of 
military and civilian instruments
 
_______________________________________________________________________________  
8945/2/02  
49 
ANNEX DG 

EN 

Phase 6 
120.  The Member States provide the Co-ordinating Mechanism with information on civilian 
crisis management assets available, including their state of readiness or deployment and 
any bilateral contributions.  
 
121.  The SG/HR contributes a view to the PSC deliberations on a set of measures aimed at 
refocusing the EU action. The Commission for its part will present the elements of a 
refocused/revised EU action which pertain to its competence. The SG/HR prepares his 
contributions in the light of advice of the EUSR if such a representative has been 
appointed as well as information, including classified, provided by Member States and 
other parties concerned, and drawing on the work of the crisis response co-ordinating 
team. 
 
122.  The Commission provides the Council, including the PSC, with a policy analysis and 
policy options for actions within its competence. It informs them of the nature and 
details of these plans as concerns those Community measures. 
 
123.  The PSC prepares its opinion to the Council on the refocusing of EU action with a 
cohesive set of options. For the development of these options the procedures outlined in 
the preceding phases apply
 
 
124.  Consultations and contacts The EU maintains contacts with NATO (see in particular § 
128). 
 
125.   The EU maintains contacts with the 15 and the 6 countries. 
 
_______________________________________________________________________________  
8945/2/02  
50 
ANNEX DG 

EN 

Phase 6 
126.  The EU maintains contacts with other third countries concerned where necessary. 
 
127.  Intensive contacts and appropriate cooperation where necessary with the UN and other 
relevant international 23 and regional organisations (e.g. OSCE, Council of Europe), as 
well as with NGOs etc. are maintained. 
 
B. 
Termination of the current military operation where appropriate 
 
128.  If NATO assets and capabilities are being used in the operation, the PSC informs the 
NAC of the plans to terminate the operation. 
 
129.  The Committee of Contributors is consulted on matters related to planning the end of 
the operation and the withdrawal of forces. 
 
 
 
The PSC, which exercises the political control and strategic direction of the operation, 
will take into account the views expressed by the Committee of Contributors. 
 
 
 
The PSC in the light of the advice of the Military Committee prepares its opinion to the 
Council on the termination of the military operation. 
 
C. 
Termination of the police operations and operations related to other civilian instruments 
 
The SG/HR together with the Commission and, as far as police aspects are concerned, 
drawing on the input from the Police Unit, may call the attention of the PSC to the 
possible need to terminate police operations and operations related to other civilian 
instruments. 
 
The PSC, in the light of advice from CIVCOM, makes recommendations to the Council 
on the termination of the police operations and operations related to other civilian 
instruments. 
 
 
                                                 
23  
See document "EU Cooperation with International Organisations in Civilian Aspects of Crisis Management" (Annex V to Presidency ESDP 
Report to the Göteborg European Council). 
_______________________________________________________________________________  
8945/2/02  
51 
ANNEX DG 

EN 

Phase 6 
D. Council 
decision 
 
129.  The Council upon recommendation by the PSC, when appropriate advised by the 
Military Committee and CIVCOM: 
 
a) 
decides to terminate the current military operation. The Chairman of the Military 
Committee represents the Military Committee at the Council; 
 
b) 
decides to terminate the current police operation and the other measures that are 
no longer needed; 
 
c) 
decides about the launching of further actions needed at this stage; 
 
d) 
may invite the Commission to re-examine the measures falling under its 
responsibility, or to make the necessary proposals to that end; 
 
e) 
invites Member States to re-examine actions taken at national level, and if 
necessary, to adapt them. 
 
E. Information 
policy 
 
130.  The PSC ensures co-ordination of the EU information strategy in support of the EU 
response to the crisis. The Presidency, SG/HR, Member States and the Commission 
implement this coherent information strategy, concentrating on termination of the 
military operation and/or the police operation and on any transition and follow-up 
measures. 
 
_______________________________________________________________________________  
8945/2/02  
52 
ANNEX DG 

EN 

Phase 6 
F. Documentation 
 
  
 
G. Lessons 
learned 
 
131.  Once the military and/or police operation are terminated, and when other civilian 
aspects of the operation are wound down, the PSC: 
 
a) 
requests the Military Committee to evaluate lessons learned on the basis of the 
reports by the Operation Commander and the Military Staff; 
 
b) 
requests CIVCOM to evaluate lessons learned. In particular, this Committee will 
evaluate lessons learned for police operations on the basis of reports by the Police 
Unit and the PHM; 
 
c) 
may request the Committee of Contributors to provide its assessment of the 
lessons drawn from the operation; 
 
The Commission provides information to Council, including the PSC on lessons learned 
within its area of responsibility. 
 
The PSC proceeds to an overall assessment. 
 
 
 
_______________________________________________________________________________  
8945/2/02  
53 
ANNEX DG 

EN 

Annex 1 
PHASE 7  STABILITY PROMOTION, POST CONFLICT RECONSTRUCTION 
 
 
PM 
 
 
 
_________________
_______________________________________________________________________________  
8945/2/02  
54 
ANNEX DG 

EN 

Annex 1 
ANNEX 1: ILLUSTRATIVE LIST OF CIVILIAN INSTRUMENTS 
 
 
 
CRISIS MANAGEMENT PROCEDURES 
CIVILIAN INSTRUMENTS 
_______________________________________________________________________________  
8945/2/02  
55 
ANNEX 1 
DG E 
EN 

Annex 1 
 
 
 
FOREWORD 
This addendum contains a series of descriptive notes on civilian instruments of crisis 
management. Each of them details, for each instrument, the appropriate legal basis, the financing, 
the procedures to be followed, as well as additional remarks and selected precedents. This 
addendum is a living document which, as for the main document, needs to be studied in detail and 
evaluated by experts, namely from the Commission. 
The list of instruments is not exhaustive. The work to be undertaken on the document, besides 
improving and perfecting it, should also lead to the inclusion of additional descriptive notes on 
other instruments which are deemed relevant in civilian crisis management. 
_______________________________________________________________________________  
8945/2/02  
56 
ANNEX 1 
DG E 
EN 

Annex 1 
CONTENTS 
l.  
Declarations  
2.   Demarches  
3. Political 
dialogue 
4. Fact-finding 
mission 
5. 
EU Special representatives 
6. 
Troika, Presidency or SG/HR missions 
   (for mediation, arbitration, confidence-building)  
7. 
Revision of existing arrangements 
8. 
Revision of assistance programmes 
9a.  Sanctions - General trade embargo 
9b.  Sanctions - Arms embargo 
9c.  Sanctions - Visa/Visits ban, diplomatic staff reduction 
9d.  Sanctions - Ban on imports of specific products 
9e. 
Sanctions - Flights ban 
9f.  Sanctions - Freeze of assets/funds 
9g.  Sanctions - Ban on investment 
10. Financial 
assistance 
11. Humanitarian 
aid 
12.  Support to electoral process 
13.  Dispatch human rights observers 
14.  Dispatch mission to strengthen rule of law 
15.  Dispatch police forces 
_______________________________________________________________________________  
8945/2/02  
57 
ANNEX 1 
DG E 
EN 

Annex 1 
(to secure law and order, to train local police, to monitor local police)  
16. Demining 
assistance 
(via other International Organisations or by the EU autonomously)  
17.  Dispatch border control team 
18.  Control of migration flows, refugees 
19.  Evacuation operations including search & rescue 
_______________________________________________________________________________  
8945/2/02  
58 
ANNEX 1 
DG E 
EN 

Annex 1 
 
1. DECLARATIONS  
 
Legal basis:   Article 23 TEU  
Financing:   None  
A. Procedure: 
• Declarations are adopted throughout all phases of the crisis  
• Council Secretariat or Presidency prepares initial draft  
• Draft text is 
a. 
discussed and finalised at PSC for approval by the Council, (I/A Item Note via 
Coreper); in this case the Declaration is issued as "EU Declaration"; or 
  b. 
discussed and finalised via Coreu; in this case the Declaration is issued 
simultaneously in Brussels and Presidency capital as "Presidency Declaration on 
behalf of EU"; exceptionally, it can be agreed by Coreu that the Declaration is issued 
as "EU Declaration"; or 
c. 
prepared by PSC for adoption by forthcoming European Council, which will finalise 
the text during session; in this case the Declaration is issued as "Declaration by the 
European Council". 
Remarks: 

Association of Associates and EFTA/EEA countries to Declarations adopted under a. and 
b. above, is automatically launched by Secretariat in consultation with Presidency. 

Exceptionally, due to lack of time, Presidency issues its own Declaration as first 
immediate response to unforeseen events. In this case, the Presidency speaks on its own 
behalf. 

SG/HR issues statements on his own behalf. 
Selected precedents: 
All declarations in Council website under http://domus/News/PressOffice/CFSPStatements 
_______________________________________________________________________________  
8945/2/02  
59 
ANNEX 1 
DG E 
EN 

Annex 1 
 
2. DEMARCHES  
Legal basis:Article 23 TEU  
Financing:  None 
Procedure: 
• 
Demarches can be carved out throughout all phases of the crisis 
• PRESIDENCY PREPARES INITIAL DRAFT, WHICH CAN BE IN THE FORM OF "TERMS OF 
REFERENCE"; HOW INPUT MAY BE REQUESTED 
•  Draft text is discussed and finalised via Coreu, including modalities (SG/HR, 
Presidency and Commission, Presidency alone, Troika) and level of receiving 
authority and of EU representation (HOM, Regional Directors, etc.), or 
•  Draft text is discussed/finalised by PSC. 
Remarks: 
-Association of Associates to be decided in negotiation by Coreu or by PSC 
Selected precedents
See current list kept up-to-date by Council Secretariat (General Affairs) in designated directory 
j/listes/demarches.  
_______________________________________________________________________________  
8945/2/02  
60 
ANNEX 1 
DG E 
EN 

Annex 1 
 
3.   POLITICAL DIALOGUE 
Legal Basis: 
Bilateral agreement with the country concerned or ad-hoc arrangements. 
Financing:  
 
If needed, for travel expenses Council administrative budget (See SG decision 
1997) 
Procedure: 
• 
Established with like-minded countries but also with countries with which the Union may 
have divergence of views on major issues. In the latter cases such meetings can be employed 
as a means to defuse potential crises or seek solutions for on-going crises. 
• 
Political dialogue meetings can be organised and take place throughout all phases of a crisis. 
• 
Generally conducted by the Troika. TEU Article 26 provides for the possibility of political 
dialogue being conducted by the SG/HR. 
• 
Agreement of counterpart for each meeting always necessary. 
• 
The PSC can agree on an ad hoc basis, in relation to a specific crisis, to hold a meeting, and 
at the same time, agree on the level and composition of the EU delegation, as well as on the 
Terms of Reference. All this can also be done by Coreu. 
Selected precedents: 
See political dialogue commitments on the collection of acts applicable to CFSP 
(j/listes/dialpolit). 
_______________________________________________________________________________  
8945/2/02  
61 
ANNEX 1 
DG E 
EN 

Annex 1 
 
4. FACT-FINDING MISSION 
Legal basis: 
Council request and Commission Decision on financing 
Financing:  Commission Decision authorising utilisation of Budget line B8-0151 (Preparatory 
Actions and Common Strategies, New Actions), including financial statement. 
Procedure: 
•  This measure is normally used during crisis build-up, i.e.,when PSC deems, after Coreu 
exchanges, that before considering self-initiated or requested EU intervention, more 
knowledge of situation on the ground is needed, (i.e.; facts need to be verified, mediation 
and/or arbitration tried, confidence built). PSC examines possible composition of the team, in 
particular the appointment of its Head and the presence of relevant experts, i.e., from the 
Commission, the Member States, military and/or police, involved IOs, etc. 
• 
During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Presidency proposal on mission's tasks, composition, financing, reporting ' modalities, which 
is discussed by Foreign Relations Counsellors and agreed by PSC. Commission adopts 
internal Decision on the basis of Presidency proposal, authorising utilisation of CFSP budget 
line on preparatory actions (B8-0151) and establishing modalities to conclude contracts with 
missions' members. 
Selected Precedents: 
Mission led by General Sir Garry Johnson in Georgia to assess needs for potential EU measures 
in support of the authorities of Georgia to ensure the protection of its borders. Commission 
Decision of May 2000. Fact-finding mission followed by Joint Action 2000/456/CFSP, L 
183/22.7.00. 
_______________________________________________________________________________  
8945/2/02  
62 
ANNEX 1 
DG E 
EN 

Annex 1 
 
5.  EU SPECIAL REPRESENTATIVES 
Legal basis:  Art. 18.5 TEU via Joint Action (art. 14 TEU: unanimity, except if in 
implementation of a Common Strategy) 
Financing:  Administrative expenditure (salaries and travel expenses) charged to Council 
administrative budget (line 1113: Special Advisers and other persons authorised by 
the Council); Operational expenditure, if any, charged to CFSP budget lines B8-
0130 or B8-0131 (Special Representatives, existing and new ones). Financial 
statements required from Council Secretariat and Commission. 
Procedure: 
•  The appointment of EUSRs is normally used during Crisis Build-up, i.e., when the Council 
agrees on the advisability of appointing an EUSR and may call upon candidates, possibly via 
Council conclusions. PSC considers candidates put forward by Member States and EU 
Institutions at PSC or via Coreu. PSC also discusses objectives and mandate of EUSR. 
•  During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Joint Action which indicates mandate, duration, terms of reference, criteria for 
constituting EUSR's team, criteria and modalities for reporting, financing arrangements 
including co-operation with the Commission, provisions on immunities and privileges. 
Foreign Relations Counsellors discuss draft Joint Action and related financial statements, 
i.e., one from the Council Secretariat, also prepared by Council Secretariat, on salaries 
and travel expenses, and one from the Commission, if necessary, on operational 
expenditure. Draft Joint Action is agreed by PSC and submitted to Coreper/Council for 
approval. 
•  Once appointed, EUSR selects his team whose salaries and travel allowances are also charged 
to the Council administrative budget, except for secondees. The team is constituted in 
consultation with the Presidency, assisted by the SGIHR and in full association with the 
Commission. 
§ During all phases of the crisis, EUSRs co-operate with MS' and Commission's missions in the 
crisis country. With HOMs, they provide information and assessments to PSC. 
Remarks: 

Title of appointee (envoy, co-ordinator, etc.) has no bearing on nomination. Any person 
_______________________________________________________________________________  
8945/2/02  
63 
ANNEX 1 
DG E 
EN 

Annex 1 
whose nomination is not based on Axt.18(5) will be deemed to be a Presidency 
Representative (art. 18.2) 

Refer to Guidelines on appointing procedure (doc. 7089/00) approved by Council 
on 30.3.2000 
Selected precedents: 
African Great Lakes region, Joint Action 2000/347/CFSP, L122/24.05.00.  
See also "I/A" Item Note in doc. 8298/00. 
_______________________________________________________________________________  
8945/2/02  
64 
ANNEX 1 
DG E 
EN 

Annex 1 
 
6.  TROIKA, PRESIDENCY OR SG/HR MISSIONS (for mediation, arbitration, 
confidence, building) 
Legal basis:  
Articles 23 (Troika), 18 TEU (Presidency, High Representative). 
Financing: 
Council administrative budget for Troika travel (see SG Decision 1997) 
CFSP budget (B8-0151 budget line - preparatory action). No need for a 
formalCouncil decision, but need for Commission Decision (see fiche on fact-
finding mission) preceded by a Letter of Intent from Commission. 
Procedure: 
•  These missions can be organised and take place throughout all phases of a 
crisis; 
•  Consent of the "host" country necessary; 
•   Council Secretariat drafts terms of reference, to be approved by PSC or by 
Coreu; 
•    When politically advisable, Council conclusions. 
Remarks: 
Difficulty may reside in availability of Ministers. 
_______________________________________________________________________________  
8945/2/02  
65 
ANNEX 1 
DG E 
EN 

Annex 1 
 
7.  REVISION OF EXISTING ARRANGEMENTS 
Legal basis: 
Agreement(s) concerned, and in particular, suspension clause contained therein. 
Otherwise appropriate provision under public international law (Rebus Sic 
stantibus etc). Commission proposal always necessary (Unanimity or QMV 
depending on the legal basis of the decision of conclusion, or on the suspension 
clause) 
Financing: None 
• 
Arrangements in question are usually Community or mixed agreements with the country 
concerned. Most of them contain a suspension or a revision clause, allowing for 
the revision, suspension of termination of the agreement in its totality or in part if 
certain conditions are met and setting forth the procedure to that end (e.g. Articles 
1 and 58 of the agreement with Mexico, Doc. 11618/97). Commission proposal 
always necessary. 
• 
During crisis build-up: Commission assesses the consequences of such revision and presents 
to the Council (PSC) various options. 
• 
During pre-decisional planning/definition of action: Council invites the Commission to 
present a proposal (in accordance with the revision clause applicable) for the revision of the 
arrangement(s) in question. The proposal could be discussed and adopted, but its actual entry 
into force postponed to the moment when the Union decides to act. 
• 
During operational phase: Council adopts the Commission proposal or triggers the measures 
envisaged. Throughout the crisis the Commission reports on the effects of the measures 
taken. 
•  During transition period: Council adopts Commission proposals for the termination/re-entry 
into force/modification of the agreement(s) concerned. 
Remarks: 
- The SG/HR and the Commission might - as a means to positively influence the situation - 
notify the country concerned that such a revision is under consideration. 
- If revision/suspension requires the same procedure as for conclusion of the agreement, 
_______________________________________________________________________________  
8945/2/02  
66 
ANNEX 1 
DG E 
EN 

Annex 1 
the European Parliament might have to be consulted or give its assent. 
- For ACP countries, see art. 96 Cotonou agreement procedure. 
Precedents: 
Niger, July 1999 (doc. 10390/99) 
Fiji, Declaration 10578/00, (Presse 272), P 108/00 
Ivory Coast, Declaration 14234/1/99 Rev 1, (Presse 422), P 129/99 
_______________________________________________________________________________  
8945/2/02  
67 
ANNEX 1 
DG E 
EN 

Annex 1 
 
8.  REVISION OF ASSISTANCE PROGRAMMES 
Legal basis: 
Regulationt establishing the programmes, and specifically, clauses contained 
therein providing for revision or suspension (QMV on a proposal from the 
Commission). Comitology procedure for Commission initiatives within the 
programme. 
 
Financing: 
EC budget (funds allocated to the programme(s) in question) 
Procedure: 
• 
Programmes usually contained in ad-hoc Council regulations. Implemented by the 
Commission through a comitology procedure. May contain revision/suspension clauses, 
permitting the adoption of urgent measures by simplified procedure (e. g. Article 16 of Reg. 
99/2000 - Tacis). 
• 
During crisis build-up: The Commission informs the PSC of possible measures within the 
framework of existing assistance programmes to tackle the crisis, which could either be taken 
autonomously, or by the Council upon Commission 
proposal. The Commission identifies the measures to be taken autonomously and/or 
announces the necessary proposals to the Council. 
•  During pre-decisional planning/definition of action: the Council invites the Commission to 
take the measures falling under its responsibilities and/or to present the necessary proposals.' 
• 
During Operational phase - formal decision to take action: The Commission adopts the 
measures falling under its responsibility. If needed, the Council adopts the Commission 
proposals on revision of assistance programmes. 
• 
During Operational phase - implementation: The Commission reports regularly to the 
Council on the implementation of the measures adopted and their impact on the on-going 
crisis. 
• 
During transition period: The Commission, informs the Council of the reexamination of the 
measures so far taken, the interruption or resumption of some of them, and announces the 
necessary proposals for the resumption of the assistance programmes and/or new measures or 
programmes to tackle the transition. 
_______________________________________________________________________________  
8945/2/02  
68 
ANNEX 1 
DG E 
EN 

Annex 1 
9a. SANCTIONS - GENERAL TRADE EMBARGO 
Legal basis: 
Art. 15 TEU (unanimity) for Common Position 
1. 
Art. 301 TEC for Regulation (QMV) with Commission proposal 
Financing:  
None 
Procedure: 
• It is usually decided in implementation of UN Security Council Resolution (UNSCR). 
• During Crisis build-up, PSC keeps close track of UNSC development. The Commission 
starts preparing implementation modalities. 
• During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Common Position that is finalised by Foreign Relations Counsellors and agreed at PSC 
level. To speed up the possible adoption of the Regulation, the Commission could present 
informal drafts of the Regulation for discussion by the Foreign Relations Counsellors. 
• During Operational Phase - formal decision to take action, Commission formally, adopts the 
Regulation proposal. Common Position is approved either by Council via Coreper, or by 
written procedure24. The Community Regulation is adopted  simultaneously with the 
Common Position, to ensure practical execution of embargo, i.e., avoid that ban is announced 
but not immediately implemented. 
• 
During Operational Phase - Implementation, PSC monitors effects of embargo. 
Commission informs on compliance and proposes adjustments (i.e. "holes" in the 
embargo) as appropriate. 
• Repealing Common Position and Regulation are adopted by Council when appropriate. 
Remarks: 
-  
Simultaneity of adoption of Common Position and Regulation is essential to ensure 
compliance with UNSCR. 

In case of autonomous EU sanctions, verify compatibility with international law. 

Specific article on association of Associates and EFTA/EEA countries may be 
inserted in Common Position. Standard Declaration of alignment applicable. 
 
Selected precedents: 
Iraq: Council Regulation 2465/96, L 337/27.12.96; Common Position 96/741/CE, L 
337/27.12.96 
 
                                                 
24 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for 
compliance with EU conditions 
_______________________________________________________________________________  
8945/2/02  
69 
ANNEX 1 
DG E 
EN 

Annex 1 
 
9b. 
SANCTIONS - ARMS EMBARGO 
Legal basis: 
Art. 15 TEU for Common Position (unanimity) 
  
Art. 301 TEC for embargo on repressive equipment (QMV), with Commission 
proposal 
Financing:  
None 
Procedure: 
• 
It is decided either in implementation of UNSCR or as EU autonomous measure. 
•   During Crisis build-up, PSC discusses flow of arms into crisis country as contributing to 
destabilisation or monitors UNSC's discussions on possible embargo. It discusses 
advisability of including equipment used for repressive purposes or terrorism' in possible 
embargo. 
•  During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Common Position that is finalised by Foreign Relations Counsellors and agreed at PSC 
level. If equipment for repression and terrorism25 is to be included, the Commission 
could present informal drafts of the Regulation for discussions by Foreign Relations 
Counsellors to speed up the possible adoption of the Regulation. 
• 
During Operational Phase - formal decision to take action, Commission formally adopts 
the Regulation proposal. Common Position is adopted either by Council via Coreper or 
by written procedure26. The Regulation is adopted simultaneously with the Common 
Position. . 
• 
During Operational Phase - Implementation, PSC monitors compliance. 
• 
Repealing decisions (Common Position and Regulation) are adopted by Council when 
appropriate, unless expiry is provided for in initial acts. 
 
Remarks: 

This measure can be part of a Common Position encompassing additional sanctions. 
EU definition of arms is used also in case of transposition of UN embargo. 

Specific article on association of Associates and EFTA/EEA countries may be inserted 
                                                 
25 This equipment falls under Community competence 
26 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for compliance 
with EU conditions. 
_______________________________________________________________________________  
8945/2/02  
70 
ANNEX 1 
DG E 
EN 

Annex 1 
in Common Position. Association crucial if autonomous EU embargo. Standard 
Declaration of alignment applicable. 
Selected Precedents: 
Indonesia: Common Position 99/624/CFSP, L 245/17.9.99; Regulation 2158/99, L 
265/13.10.99 
Libya: Common Position 99/261/CFSP, L 103/20.4.99 amended by Common Position 
99/611/CFSP, L 242/14.9.99 
 
_______________________________________________________________________________  
8945/2/02  
71 
ANNEX 1 
DG E 
EN 

Annex 1 
 
9c.    SANCTIONS – VISA/VISITS BAN, DIPLOMATIC STAFF REDUCTION27 
Legal basis: 
Art 15, TEU for Common Position (unanimity, except if in 
implementation of a Common Strategy) 
Financing:  
None 
Procedure: 
•  This measure is decided either in implementation of UNSCR or autonomously by EU. 
•  During Crisis build-up, PSC discusses possible impact of measures. 
•  During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Common Position that is finalised by Foreign Relations Counsellors and agreed at PSC 
level. HOMs are asked to prepare lists of persons, i.e., close to regime in crisis country, 
whose names and details (e.g. date of birth, transport No, etc.) may be included in the 
Common Position as subject to a visa ban. The list of names can be included in a 
Decision implementing the Common Position. This Decision is adopted and can be 
amended by QMV. 
•  During Operational Phase - formal decision to take action, Common Position is, approved 
either by Council via Coreper or by written procedure. 28 
•  During Operational Phase - Implementation. HOMs are asked to monitor effects of 
measures and contribute to their assessment. 
•   Amending Decisions are required frequently to take account updates/improvements to 
lists of individuals. 
•  Repealing Common Position is adopted by Council when appropriate. 
Remarks: 

This measure can be part of a wider Common Position including additional sanctions. 

Take account of technical time needed for compilation/verification of lists, persons' 
titles, acquisition of specific info, i.e., dates and places of birth. 

For reduction of diplomatic personnel, categories of diplomatic staff to be withdrawn are 
indicated, i.e., military attaches (see model). 

Specific article on association of Associates and EFTA/EEA countries may be inserted in 
Common Position. Standard Declaration of alignment applicable. 
                                                 
27 Refer to Fiches on "Dispatch Border Control Team" and "Control of Migration Flows Refugees". 
28 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for compliance 
with EU conditions. 
_______________________________________________________________________________  
8945/2/02  
72 
ANNEX 1 
DG E 
EN 

Annex 1 
Selected precedents: 
Burma: Common Position 2000/346/CFSP, L 122/24.5.2000 
FRY: Common Position 2000/56/CFSP, L 21/26.1.00; Common Position 2000/176/CFSP, L 
56/1.3.00 (repealed by Common Position 2000/454/CFSP, L 183/22.7.00) 
 
_______________________________________________________________________________  
8945/2/02  
73 
ANNEX 1 
DG E 
EN 

Annex 1 
9d.    SANCTIONS - BAN ON IMPORTS OF SPECIFIC PRODUCTS 
Legal basis: 
Art. 15 TEU (unanimity) for Common Position 
 
Art. 301 TEC for Regulation (QMV) with Commission proposal  
Financing:  
None 
Procedure: 
• 
It is usually decided in implementation of UNSCR. 
• 
During Crisis build-up, PSC discusses if ban on imports of products whose 
revenue contributes to financing targeted regime could force the latter 
towards desired solution (end of repression or aggression). Examples: oil and 
related products, diamonds. Ban is also considered to "isolate" crisis country 
and impede fuelling of repression/aggression machinery. Examples: oil and 
related products. The Commission starts assessing the feasibility of the ban. 
HOMs are alerted. 
 • 
During Pre-decisional planning/definition of action, Council Secretariat 
prepares draft Common Position that is finalised by Foreign Relations 
Counsellors and agreed at PSC level. To speed up the possible adoption of 
the Regulation, the Commission could present informal drafts of the 
Regulation for discussion by the Foreign Relations Counsellors. 
 • 
During Operational Phase - formal decision to take action, Commission 
formally, adopts the Regulation proposal. Common Position is adopted either 
by Council via Coreper, or by written procedure29. The Regulation is adopted 
simultaneously with the Common Position, to ensure practical execution of 
ban, i.e., avoid that ban is announced but not immediately implemented. 
• 
During Operational Phase - Implementation, PSC monitors effects of ban. 
HOMs are closely associated. Commission informs on compliance and 
proposes adjustments (i.e. "holes" in the ban) as appropriate, via comitology 
if provided for by Regulation. 
 
 
                                                 
29 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for compliance 
with EU conditions 
_______________________________________________________________________________  
8945/2/02  
74 
ANNEX 1 
DG E 
EN 

Annex 1 
•  
Repealing Common Position and Regulation are adopted by Council when 
appropriate. 
Remarks: 

This measure can be part of a wider Common Position including additional 
sanctions. 

Simultaneity of adoption of Common Position and implementing Regulation is 
essential to ensure credibility of measures and/or compliance with UNSCR's deadline. 

For autonomous EU sanctions, verify compatibility with international law.  

Specific article on association of Associates and EFTA/EEA countries may be 
inserted in Common Position. Standard Declaration of alignment applicable. 
Selected Precedents: 
Sierra Leone: 2000/455/CFSP, L 183/22.7.00 (diamonds) 
FRY: 99/273/CFSP, L 108/27.4.99 + Regulation 900/99, L 114/1.5.99 repealed by 2111/99, L 
258/5.10.99 (oil + oil products) 
_______________________________________________________________________________  
8945/2/02  
75 
ANNEX 1 
DG E 
EN 

Annex 1 
 
9e.   SANCTIONS - FLIGHTS BAN 
Legal basis: 
Art. 15 TEU(unanimity) for Common Position 
(a)  Art. 301 TEC for Regulation (QMV) with Commission proposal  
Financing: None 
Procedure: 
• 
It is decided either in implementation of UNSCR or as EU autonomous measure. 
• 
During Crisis build-up, PSC discusses if flights ban could force targeted regime towards 
the desired solution (end of repression or aggression). The Commission starts assessing 
the feasibility of the ban, including an assessment of airlines' bilateral agreements if ban 
is not in implementation of UNSCR. 
• 
During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Common Position that is finalised by Foreign Relations Counsellors and agreed at PSC 
level. To speed up the possible adoption of the Regulation, the Commission could 
present informal drafts of the Regulation for discussion by the Foreign Relations 
Counsellors. 
•   During Operational Phase - formal decision to take action, Commission has formally 
adopted the Regulation proposal. Common Position is approved either by Council via 
Coreper, or by written procedure30. The implementing Regulation is adopted 
simultaneously with the Common Position, to ensure practical execution of ban, i.e., 
avoid that ban is announced but not immediately implemented, with the same modalities 
as for the Common Position. 
•   During Operational Phase - implementation, PSC monitors effects of ban. Commission 
informs on compliance and difficulties in implementation on the ground. It proposes 
adjustments (i.e. "holes" in the ban) as appropriate. 
•   Repealing Common Position and Regulation are adopted by Council when appropriate. 
Remarks: 

This measure can be part of a wider Common Position including additional sanctions. 

Simultaneity of adoption of Common Position and implementing Regulation is essential to 
                                                 
30 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for compliance 
with EU conditions 
_______________________________________________________________________________  
8945/2/02  
76 
ANNEX 1 
DG E 
EN 

Annex 1 
ensure credibility of measures. 

Compliance could be monitored by military means. 

Specific article on association of Associates and EFTA/EEA countries may be inserted in 
Common Position. Standard Declaration of alignment applicable. 
 
(i) Selected 
precedents: 
Afghanistan: Common Position 1999/727/CFSP, L 294/16.11.99 and Regulation 337/00, L 
43/16.2.00 
FRY: Common Position 99/318/CFSP, L 123/13.5.99, Regulation 2151/99, L 264/12.10.99 
suspended by Regulation 607/00, L 73/22.3.00 
 
 
_______________________________________________________________________________  
8945/2/02  
77 
ANNEX 1 
DG E 
EN 

Annex 1 
 
9f. 
SANCTIONS - FREEZE OF ASSETS/FUNDS 
Legal basis: 
Art. 15 TEU (unanimity) for Common Position 
Art. 301 and, if required for capital movements, art. 60 TEC for 
Regulation (QMV) with Commission proposal 
Financing:  
     None 
Procedure: 
• 
It is decided either in implementation of UNSCR or as EU autonomous measure.  
• 
During Crisis build-up, PSC discusses if freezing assets and/or funds of State or State-
related enterprises as well as of individuals close to targeted regime could force the latter 
towards the desired solution (end of repression or aggression) The Commission starts 
assessing the feasibility of the freeze. HOMs are alerted since their input on targeted 
firms and individuals will be crucial to ensure "fairness" of freeze. 
• 
During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Common Position that is finalised by Foreign Relations Counsellors and agreed at PSC 
level. To speed up the possible adoption of the Regulation, the Commission could present 
informal drafts of the Regulation for discussion by Foreign Relations Counsellors. 
• 
During Operational Phase - formal decision to take action, Commission formally adopts 
the Regulation proposal. Common Position is approved either by Council via Coreper, or 
by written procedure31. The Regulation is adopted simultaneously with the Common 
Position, to ensure execution of freeze by public and private operators. 
•   During Operational Phase - Implementation, PSC monitors effects of freeze. HOMs 
participate closely. Commission informs on compliance and proposes adjustments 
(i.e. "holes" in the freeze) via comitology procedure if provided for in the Regulation. 
•   Repealing Common Position and Regulation are adopted by Council when 
appropriate. 
Remarks: 

This measure can be part of a wider Common Position including additional sanctions. 

Simultaneity of adoption of Common Position and implementing Regulation is 
essential to ensure credibility of measures and/or compliance with UNSCR's deadline. 
 
 
                                                 
31 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for compliance 
with EU conditions 
_______________________________________________________________________________  
8945/2/02  
78 
ANNEX 1 
DG E 
EN 

Annex 1 

Specific article on association of Associates and EFTA/EEA countries may be inserted 
in Common Position. Standard Declaration of alignment applicable. 
Selected precedents
Afghanistan: C.P. 1999/727/CFSP, L 294/16.11.99 and Reg. 337/00, L 43/16.2.00  
FRY: C.P. 99/318/CFSP, L 123/13.5.99, Reg. 1294/99, L 153/19.6.99 
Burma: C.P. 2000/346/CFSP, L 122/24.5.00 and Reg. 1081/L 122/24.5.00 
 
_______________________________________________________________________________  
8945/2/02  
79 
ANNEX 1 
DG E 
EN 

Annex 1 
 
9g.  SANCTIONS: - BAN ON INVESTMENT 
 
Legal basis:
 
Art. 15 TEU(unanimity) for Common Position 
Art. 301 and if required for capital movements, art. 60 TEC, for 
Regulation (QMV) with Commission proposal 
Financing:  
None 
Procedure: 
• 
It is decided either in implementation of UNSCR or as EU autonomous measure.  
• During 
Crisis 
build-up, PSC discusses if ban on investments (existing and/or new) of State 
or State-related enterprises as well as of firms and individuals close to targeted regime 
could force the latter towards the desired solution (end of repression or aggression). The 
Commission starts assessing the feasibility of the ban. HOMs are alerted since their input 
on targeted firms and individuals will be crucial. 
• 
During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Common Position that is finalised by Foreign Relations Counsellors and agreed at PSC 
level. To speed up the possible adoption of the Regulation, the Commission could present 
informal drafts of the Regulation for discussion by Foreign Relations Counsellors. 
•   During Operational Phase - formal decision to take action, Commission has formally 
adopted the Regulation proposal. Common Position is approved either by Council via 
Coreper, or by written procedure32. The Regulation is adopted simultaneously with the 
Common Position to ensure execution of ban by public and private operators, with the 
same modalities as for the Common Position.  
• 
During Operational Phase - Implementation, PSC monitors effects of ban. HOMs 
participate closely. Commission informs on compliance and proposes adjustments (i.e. 
"holes" in the ban) via comitology procedure if provided for in the Regulation. 
•   Repealing Common Position and Regulation are adopted by Council when appropriate. 
 
Remarks: 

This measure can be part of a wider Common Position including additional sanctions. 

Simultaneity of adoption of Common Position and implementing Regulation is essential 
to ensure credibility of measures and/or compliance with UNSCR's deadline. 

Specific article on association of Associates and EFTA/EEA countries may be inserted 
                                                 
32 If it is necessary to ensure entry into force by date either prescribed in UNSCR or by expiry of deadline given to crisis country for compliance 
with EU conditions 
_______________________________________________________________________________  
8945/2/02  
80 
ANNEX 1 
DG E 
EN 

Annex 1 
in Common Position. Standard Declaration of alignment applicable. 
Selected precedents: 
FRY: Common Position 98/374/CFSP, L 165/10.6.98, Regulation 1294/99, L 153/19.6.99 
 
_______________________________________________________________________________  
8945/2/02  
81 
ANNEX 1 
DG E 
EN 

Annex 1 
 
10.  FINANCIAL ASSISTANCE 
Legal basis: 
CFSP emergency measures - Joint Action 
Macro-financial assistance - Art. 308 (unanimity) - Council Decision 
 Use of existing programmes - Regulation establishing the programme 
Financing: 
Emergency measures - B8-014 Macro-financial assistance BO-20 or B7 
Existing programmes (several) 
Procedure: 
− 
Emergency measures 
 
• 
The decision to provide financial assistance can be adopted throughout all phases of the 
crisis. 
• 
Used for immediate and limited assistance. 
• 
PSC examines the advisability of the measures. 
• 
Council Secretariat prepares draft Joint Action, which is finalised by Foreign Relations 
Counsellors and agreed by COREPER/Council. 
 
− 
Macro-financial assistance 
 
• 
Suitable during the Routine phase or during the Transition period. 
• 
PSC examines the advisability of the measures. 
• 
The Commission consults the Economic and Financial Committee before submitting 
its proposal to the Council. 
• 
The Commission proposal is finalised by the Financial Counsellors and agreed by 
COREPER/Council (ECOFIN) after the consultation of European Parliament33 
• 
The assistance can be in the form of loans or grants. 
• 
The Commission manages the assistance in close consultation with the Economic and 
Financial Committee. 
 
− 
Use of existing programmes 
 
• 
The Commission informs the PSC on the measures taken and under consideration. 
• Comitology 
procedure. 
 
                                                 
33 In relation to the consultation of the European Parliament it should be noted that unless an urgency procedure is used, the Council might have to wait for 
the EP opinion for several months. 
_______________________________________________________________________________  
8945/2/02  
82 
ANNEX 1 
DG E 
EN 

Annex 1 
 
Remarks: 
• 
In case of macro-financial assistance, the Council generally requires that therecipient has 
agreed with the IMF on a macroeconomic programme.  
• 
Co-ordination with the Member States financial aid measures essential. 
 
(ii) Selected 
precedents 
Montenegro: Joint Action 98/301/CFSP, L 138/9.5.98 
Montenegro: Council Decision 2000/355/EC of 22.5.00/L 127/27.5.00  
Kosovo: Council Decision 2000/140/EC of 14.2.00/L 47/19.2.00 
 
 
 
 
 
_______________________________________________________________________________  
8945/2/02  
83 
ANNEX 1 
DG E 
EN 

Annex 1 
 
11. HUMANITARIAN AID 
Legal basis: 
Reg. 1257/96. Implementation by Commission (in particular ECHO) via 
comitology procedure, or 
Cotonou Agreement for ACP countries, or 
CFSP legal instruments to support convoying of humanitarian aid 
 
Financing: 
EC budget lines provided for Reg. 1257/96 
European Development Fund (EDF) in case of ACP countries  
CFSP budget lines to support convoying of humanitarian aid 
Procedure: 
• 
The need for supplying humanitarian aid can intervene in all phases of the crisis.  
• 
During crisis build-up, especially at early-warning phase, PSC asks Commission for 
information on humanitarian aid operations either planned, decided or in the course of 
implementation in crisis country. Special attention is given to coordination of international 
efforts, i.e., with UN. 
•   Commission keeps PSC informed throughout crisis, giving particular ; consideration to 
possible support needed for distribution and protection of convoys. This may require 
Council Decisions, i.e., Joint Actions, at later phases of crisis. 
•   During Pre-decisional planning/definition of action, if so required, Council Secretariat 
prepares draft Joint Action, in close association with Commission services, on supporting 
the convoying of EU/international aid (for example, for the identification, restoration and 
preservation of priority routes). The draft Joint Action is finalised by Foreign Relations 
Counsellors and agreed by PSC. The Joint Action can be financed either from CFSP 
budget lines (chapter B8) or by MS' contributions or by a combination of both. Financing 
modalities will be specified in the financial statement, to be provided by the Commission 
and attached to the draft Joint Action. 
•   During Operational Phase - formal decision to take action, Joint Action or Decision 
implementing Common Position is approved either by Council via Coreper or by written 
procedure, depending on urgency. 
• 
During Operational Phase - Implementation, PSC monitors implementation with close 
involvement by Commission. HOMs are closely associated. 
•  After end of military operation and during transitional phase,  measures are likely to 
_______________________________________________________________________________  
8945/2/02  
84 
ANNEX 1 
DG E 
EN 

Annex 1 
continue. PSC continues to monitor and HOMs continue to be closely associated. 
Remarks: 

Urgency procedure at art. 17.3 of Reg. 1257/96. 
Selected precedents: 
Convoying of humanitarian aid in Bosnia- Herzegovina  
Council Decision 93/603/CFSP, L 286/20.11.93 as amended.  
N.B.: Decision should be "Joint Action". 
_______________________________________________________________________________  
8945/2/02  
85 
ANNEX 1 
DG E 
EN 

Annex 1 
 
12. SUPPORT TO ELECTORAL PROCESS 
 
Legal basis:  Regulations 975/99 and 976/99 on laying down the requirements for the 
implementation of Community operations in relation to developing and 
consolidating democracy and the 
 

rule of law and to that of respecting human rights and fundamental freedoms 
- Comitology 
Joint Action if Community has not acted (Article 14) 
 
Financing: 
Community financing based on Regulations 975/99 and 976/99 
Procedure: 
The decision to provide support for the supervision of an electoral process is likely to be taken 
as part of EU's contribution to stability and conflict prevention and hence used during the 
Routine phase or during the Transition period after the operation has been terminated. 
 
• 
EU can act out of its own initiative or at the request of an outside body (e.g. UN, OSCE). 
• 
The Commission gives concrete indications to the PSC on the action it intends to pursue 
and keeps the PSC regularly informed. 
• 
The Commission shall adopt the measures under the comitology procedure. 
• 
If CFSP measures are envisaged, Council Secretariat prepares draft Joint Action, in close 
association with Commission services. The draft Joint Action is finalised by Foreign 
Relations Counsellors and agreed by PSC. The Joint Action can be financed either from 
CFSP budget lines (chapter B8) or by MS34 contributions or by a combination of both. 
Financing modalities will be specified in the financial statement, to be provided by the 
Commission and attached to the draft Joint Action. 
 
 
 
 
                                                 
34  If the measures are not in accordance with the opinion of the committee the Commission shall submit to the Council a proposal relating to the 
measures to be taken. The Council must act by a qualified majority before three months from the date of referral to the Council or the 
measures shall be adopted by the Commission. 
_______________________________________________________________________________  
8945/2/02  
86 
ANNEX 1 
DG E 
EN 

Annex 1 
Remarks: 

The comitology procedure is used for decisions on operations for which financing exceeds 
EUR 1 mio or any modification so such operations leading to an increase of more than 20 
% in the sum initially agreed as well as for programmes intended to provide a coherent 
framework for action where the scale and complexity of the needs identified are such that 
they seem likely to continue. 

The Commission may finance emergency measures up to a maximum of EUR 2 mio. In 
these cases the Commission shall act after consulting the Member States. 

Co-ordination with the NGOs of the MSs, the EP and national parliaments essential. 

Gradual decline in use of CFSP legal instruments after entry into force of Regulations 
975/99 and 976/99. 
P.M. 'Co-ordinating mechanism' database. 
 
 
 
 
_______________________________________________________________________________  
8945/2/02  
87 
ANNEX 1 
DG E 
EN 

Annex 1 
13. DISPATCH HUMAN RIGHTS OBSERVERS 
Legal basis: Based on regulations 975/99 and 976/99 on laying down the requirements for the 
implementation of Community operations in relation to developing and 
consolidating democracy and the rule of law and to that of respecting human rights 
and fundamental freedoms 
- Comitology 
Joint Action if Community has not acted. 
Financing 
Community financing based on Regulations 975/99 and 976/99 
Procedure: 
• 
The decision to dispatch Human Rights Observers can be taken throughout all phases of 
the crisis. 
• 
EU can act out of its own initiative or at the request of an outside body (e.g. UN, OSCE). 
• 
The Commission gives concrete indications to the PSC on the action it intends to pursue and 
keeps the PSC regularly informed. 
• 
The Commission shall adopt the measures under the comitology procedure.35 
• 
If CFSP measures are envisaged, Council Secretariat prepares draft Joint Action, in close 
association with Commission services. The draft Joint Action is finalised by Foreign Relations 
Counsellors and agreed by PSC. The Joint Action can be financed either from CFSP budget 
lines (chapter B8) or by MS' contributions or by a combination of both. Financing modalities 
will be specified in the financial statement, to be provided by the Commission and attached to 
the draft Joint Action. 
 
Remarks: 

The comitology procedure is used for decisions on operations for which financing exceeds 
EUR 1 mio or any modification so such operations leading to an increase of more than 20 
% in the sum initially agreed as well as for programmes intended to provide a coherent 
framework for action where the scale and complexity of the needs identified are such that 
they seem likely to continue. 
 
 
 
                                                 
35  If the measures are not in accordance with the opinion of the committee the Commission shall submit to the Council a proposal relating to the 
measures to be taken. The Council must act by a qualified majority before three months from the date of referral to the Council or the 
measures shall be adopted by the Commission. 
_______________________________________________________________________________  
8945/2/02  
88 
ANNEX 1 
DG E 
EN 

Annex 1 
 

The Commission may finance emergency measures up to a maximum of EUR 2 mio. In 
these cases the Commission shall act after consulting the Member States.  

Co-ordination with the NGOs of the MSs, the EP and national parliaments essential. 

Gradual decline in use of CFSP legal instruments after entry into force of 
Regulations 975/99 and 976/99. 
P.M. 'Co-ordinating mechanism' database 
 
 
 
 
 
 
 
 
_______________________________________________________________________________  
8945/2/02  
89 
ANNEX 1 
DG E 
EN 

Annex 1 
 
14. DISPATCH MISSION TO STRENGTHEN RULE OF LAW 
Legal basis: 
Based on regulations 975/99 and 976/99 on laying down the requirements 
for the implementation of Community operations in relation to developing 
and consolidating democracy and the -  rule of law and to that of 
respecting human rights and fundamental freedoms 
- Comitology 
Joint Action if Community has not acted. 
 
Financing
Community financing based on Regulations 975/99 and 976/99 
Procedure: 
• 
The decision to dispatch mission to strengthen rule of law can be taken throughout all phases 
of the crisis. 
• 
EU can act out of its own initiative or at the request of an outside body (e.g. UN, OSCE). 
• 
The Commission gives concrete indications to the PSC on the action it intends to pursue and 
keeps the PSC regularly informed. 
• 
The Commission shall adopt the measures under the comitology procedure.36 
 
Remarks: 

The comitology procedure is used for decisions on operations for which financing exceeds 
EUR 1 mio or any modification so such operations leading to an increase of more than 20 % 
in the sum initially agreed as well as for programmes intended to provide a coherent 
framework for action where the scale and complexity of the needs identified are such that 
they seem likely to continue. 

The Commission may finance emergency measures up to a maximum of EUR 2 mio. In these 
cases the Commission shall act after consulting the Member States. 

Co-ordination with the NGOs of the MSs, the EP and national parliaments essential. 

Gradual decline in use of CFSP legal instruments after entry into force of Regulations 975/99 
and 976/99. 
 
 
 
                                                 
36  If the measures are not in accordance with the opinion of the committee the Commission shall submit to the Council a proposal relating to the 
measures to be taken. The Council must act by a qualified majority before three months from the date of referral to the Council or the 
measures shall be adopted by the Commission. 
_______________________________________________________________________________  
8945/2/02  
90 
ANNEX 1 
DG E 
EN 

Annex 1 
15.  DISPATCH POLICE FORCES (to secure law and order, to train local police, to 
monitor local police) 
 
Legal basis: 
Joint Action based on Article 14 TEU (Unanimity, except if adopted in 
implementation of a Common Strategy) 
 Regulations 975/99 and 976/99 for training operations (Commission in the 
lead with a comitology procedure) 
 
Financing: 
CFSP budget lines for operations of limited importance (financial statement 
required from Commission), otherwise MS direct contribution. EC budget 
for operations undertaken under Commission responsibility (budget line 
corresponding to the legal instrument selected). 
Procedure: 
• During 
Crisis-build-up: PSC, with input from the "Co-ordinating Mechanism", JHA Working 
Groups (e.g. Police Co-operation, or Article 36 Committee) and the Committee for Civilian 
aspects of Crisis management discusses implications of such dispatch in the light of the 
police available; the Commission is fully associated to the exercise and provides information 
on possible actions it can take autonomously. 
• 
_During Pre-decisional planning/definition of action: Member States (in all likelihood within 
the Article 36 Committee) make commitments on the number of police they can provide. 
Council Secretariat prepares draft Joint Action which is finalised by Foreign Relations 
Counsellors and agreed at PSC level. Commission prepares financial statement if funding in 
through CFSP budget. The Commission informs the PSC on the measures it envisages to take 
under its responsibility.  
• 
During Operational Phase-formal decision to take action: Council, via Coreper or by written 
procedure) adopts Joint Action. It appoints, if needed, a "Head of the Operation". 
• 
During Operational Phase - implementation: Council (PSC) monitors the situation by 
receiving reports by the Head of Operation, HOMs, Commission, Joint Sitcen. 
§ During the Transition period: Need to amend or revise Joint Action in the light of evolution of 
the situation. 
 
 
 
_______________________________________________________________________________  
8945/2/02  
91 
ANNEX 1 
DG E 
EN 

Annex 1 
Remarks: 
-  Joint Action must contain detailed reporting and supervisory provisions. 
-  Need to define a precise mandate for operation. 
-  Need to agree with receiving country on status of operation and of personnel to be sent. 
-  Need for detailed information from the crisis theatre, in particular on the conditions of local 
police, and on the possible effect on the local population of the dispatch of foreign police is 
paramount. 
-  Strong co-ordination with the military element of the operation (when there is one) to secure 
law and order. 
-  Contacts with lead-agency (if EU operation is not autonomous) or in any case with 
organisations active on the ground paramount throughout the crisis. 
-  PM: Co-ordinating Mechanism Data base. 
 
Selected precedents: 
Albania (MAPE): Joint Action 99/189/CFSP, L 63/12.3.99 and Council Decision 99/190/CFSP, L 
63/12.3.99 as amended. 
N.B.: ex art. J.4.2. no longer suitable (e.g. for Council Decision above) 
_______________________________________________________________________________  
8945/2/02  
92 
ANNEX 1 
DG E 
EN 

Annex 1 
 
16.  DEMINING ASSISTANCE (via other International Organisations or by the EU 
autonomously) 
Legal basis: 
Regulations 975/99 and 976/99 or technical assistance regulations (MEDA, 
TACIS etc.) (Commission in the lead with a comitology procedure), pending the 
adoption of a general demining EC Regulation. 
  Article 14 TEU for "military" demining (unanimity). 
Financing: 
EC budget (funds allocated to the programme(s) in question) CFSP budget line 
for operations based on Article 14 TEU. 
Procedure: 
• 
Although demining assistance may be provided throughout all phases of the crisis, it is most 
likely to occur during the transition period. 
• 
The Commission informs the PSC on the measures it envisages to take under its 
responsibility and, once the measures have been taken, provides regular reports toPSC and 
Council. 
• 
Council Secretariat prepares draft Joint Action which is finalised by Foreign Relations 
Counsellors and agreed at PSC level. 
 
Remarks: 

Member States should co-ordinate in the appropriate Working Group and the CivCom 
exchange information about their bilateral assistance programmes. 

Co-ordination with other International organisations involved is paramount. 

PM. "Co-ordinating Mechanism" co-ordinates with other international agencies, and 
receives information from databases on mine action programmes (i.e. UN Mine action 
service). 

Gradual decline in use of CFSP legal instruments after entry into force of 
Regulations 975/99 and 976/99. 
_______________________________________________________________________________  
8945/2/02  
93 
ANNEX 1 
DG E 
EN 

Annex 1 
 
17.  DISPATCH BORDER CONTROL TEAM37 
Legal basis: 
- Art. 14 TEU for Joint Action, art. 15 TEU for Common Position: 
unanimity; if in implementation of Common Strategies or in case of 
Decision implementing Common  Position or Joint Action: QMV; or 
 - Regs 975/99 & 976/99, TACIS, PHARE, Obnova, MEDA, etc.: 
Implementation by Commission via comitology 
Financing:  From CFSP budget lines (chapter B8) (financial statement required from 
Commission), or under budget lines designated for above Regulations 
Procedure: 
• 
This measure aims at preventing illegal activities at borders where such activities contribute 
to escalation of potential conflict. It is likely to be used during crisis build-up, i.e., if EU 
considers that escalation of potential conflict can be avoided through appropriate border-
monitoring, or after ending military operation and during transitional phase, if EU considers 
border-monitoring as contributing to stabilisation. PSC examines merit of proposed measure 
in close association with Commission, which keeps PSC informed of its analysis, plans and 
actions under, Community programmes (Regs 975 &976/99, TACIS, PHARE, etc.). PSC 
examines suitable composition of team, in particular the appointment of its Head  and the 
presence of relevant experts, i.e., from the Commission, the Member States, military and/or 
police, involved IOs, etc. HOMs are closely associated and provide input on needs. 
• 
Council Secretariat prepares draft CFSP instrument (Joint Action or Decision implementing 
Common Position) on team's tasks, composition, financing, reporting modalities. Draft, 
including related financial statement on financing of team, is discussed by Foreign Relations 
Counsellors. SCIFA (Strategic Committee on Immigration Frontiers and Asylum), the 
Frontiers and CIREFI Working Parties are kept informed and are asked to provide technical 
expertise in identifying needs and human resources, i.e., experts from Member States. The 
draft CFSPinstrument is agreed by PSC. If there is orientation towards using 15` pillar 
instruments, Commission informs PSC of proceedings. 
• 
Joint Action or Decision implementing Common Position is submitted to Coreper/Council for 
approval, if urgent, by written procedure. In case of EC instruments, Commission ensures 
timeliness of relevant decisions via comitology, if necessary via urgency procedures provided 
for in specific Regulations. 
                                                 
37 Refer to Fiches on "Control of Migration Flows Refugees" and "Sanctions - Visa/Visits Ban, Diplomatic Staff Reduction" 
_______________________________________________________________________________  
8945/2/02  
94 
ANNEX 1 
DG E 
EN 

Annex 1 
• 
PSC receives assessments from team. HOMs continue to be closely associated. 
 
Remarks: 
 
-  EU may act autonomously or contribute to lead IO organising monitoring activity, e.g., 
UN, OSCE 
-  Strong need to co-ordinate EC and CFSP instruments at all phases 
-  Controversial financing under EC instruments other than Regs 975/99-976/99  
-  This measure may be in implementation of an all-encompassing Common Position 
 
Selected precedents: 
 
Georgia: Joint Action 2000/456/CFSP, L 183/22.7.00 
 
_______________________________________________________________________________  
8945/2/02  
95 
ANNEX 1 
DG E 
EN 

Annex 1 
 
18. CONTROL OF MIGRATION FLOWS, REFUGEES38 
Legal basis: EC (ex 
JHA):Art. 62 and 63 TEC for new Community measures (unanimity, 
Member States share the right of initiative with the Community for 5 years after 
entry into force of the Amsterdam Treaty) as well as for developing existing 
Schengen acquis. 
Art. 64.2 TEC for emergency measures (QMV with Commission ,proposal). 
N.B.: crucial instrument in case of urgent situation.  
CFSP: On items where there is no Community Competence, art. 14 for Joint 
Action art. 15 for Common Position: unanimity; if in implementation of 
Common Strategies or in case of Decision implementing Common Position or 
Joint Action: QMV 
 
Financing : 
In case of CFSP instruments, financial statement required from Commission. 
Procedure: 
• 
This measure may be needed at all phases of crisis. 
• 
PSC examines feasibility of proposed measures in close association with the Commission. It 
seeks the advice of SCIFA (Strategic Committee on Immigration, Frontiers and Asylum) and 
High level working party on Asylum and Migration, as well as subordinate bodies, such as 
Working Party on Migration and Expulsion, Frontiers Group and CIREFI,(early warning 
mechanism). HOMs are closely associated and provide input on needs. Co-ordination with 
involved IOs is crucial. 
•  If financing of measures is required, on the CFSP budget line Council Secretariat 
prepares draft CFSP instrument (Joint Action or Decision implementing Common 
Position), including related financial statement, which are discussed by Foreign 
Relations Counsellors. SCIFA and other involved JHA instances are kept informed. Joint 
Action or Decision implementing Common Position is agreed by PSC. Otherwise 
standard Community procedures apply. 
•   Joint Action or Decision implementing Common Position is submitted to 
Coreper/Council for approval, if urgent, by written procedure. 
• 
PSC/Commission monitor implementation and examine possible modifications of EU/EC 
action. HOMs continue to be closely associated. 
_______________________________________________________________________________  
8945/2/02  
96 
ANNEX 1 
DG E 
EN 

Annex 1 
 
Remarks: 

EU may act autonomously or contribute to lead IO organising control activity, e.g., UN, 
OSCE 

N.B.: EC instruments (ex JHA) which may be used: Reg.574/199939 determining third 
countries whose nationals must be in possession of visas when crossing EU external 
borders (QMV and Commission proposal); Schengen Convention, art.2 (and its 
application procedure for art. 2.2 of 20.12.1995) (possibility for individual Member 
States to reinstate checks at internal borders, e.g. for German/Austrian border in case of 
influx from Balkans); Council Resolution 11.5.1999 on early warning system for 
transmission of information on illegal immigration and facilitation networks (doc. 
7965/99) (via CIREFI and in pre-crisis stage); Council Recommendations of 28.5.1998 
and 29.4.1999 and Decision of 27.3.200040 on detection of false/falsified documents 
(during crisis build-up); Odysseus programme41 for training/exchange in fields of 
asylum, immigration and crossing of external borders (crisis build-up). 

Need for reliable assessment from crisis theatre is crucial. Possibly, need for satellite 
images (acquisition via CFSP instrument and financing). 
 
PM. Refugee Fund to be adopted shortly 
 
                                                                                                                                                                  
38 Refer to Fiches on "Dispatch Border Control team" and "Sanctions - Visa/Visits Ban, Diplomatic Staff Reduction" 
39 OJ L72 of 18.3.99 
40 Ojs C 189 of 17.6.98 and C140 of 20.5.99 and L 81 of 1.4. 2000 
41 98/244/JHA, OJ L 99, of 31.3.98 
_______________________________________________________________________________  
8945/2/02  
97 
ANNEX 1 
DG E 
EN 

Annex 1 
 
19.   EVACUATION OPERATIONS INCLUDING SEARCH & RESCUE 
Legal basis: 
art. 14 TEU for Joint Action (unanimity) 
1985-1991 Guidelines on protection of Member States nationals 
in case of political crisis or natural catastrophe 
Voluntary co-operation by Member States via lead 
nation  
N.B. Art 20 TEU and art. 20 TEC 
Financing: 
CFSP budget lines for Joint Action (except for expenditure 
arising from operations having military or defence implications) 
(financial statement required from Commission, or 
Member States (see Art. 28.3 TEU). Financial statement required 
for Joint Action 
Procedure: 
•   During Crisis build-up, PSC monitors developments in crisis spot. Continuous HOMs' 
reporting essential. 
•  During Pre-decisional planning/definition of action, Council Secretariat prepares draft 
Joint Action which is finalised by Foreign Relations Counsellors and agreed at PSC level. 
Text includes financial provisions, i.e., which parts of the evacuation operation, if any, are 
financed from CFSP budget lines and which ones are charged to Member States budgets 
(GNP scale unless Council unanimoulsy decides otherwise). Draft Joint Action includes 
mandate to "lead nation(s)", specifies evacuation criteria (i.e., humanitarian basis 
including non EU-nationals), indicates contribution(s) by military means and from civil 
protection resources for possible search and rescue operations. The "Civil Protection" 
Working Group may be called to contribute its expertise. Co-operation with Commission 
essential for civil protection part, including possibility of Community financing for parts 
of the operation. Commission provides Financial Statement related to Joint Action. HOMs' 
role essential. 
•  During Operational Phase - formal decision to take action, Joint Action is adopted either 
by Council via Coreper or by written procedure. 
•  During Operational Phase - Implementation, PSC monitors implementation via HOMs who 
are directly involved with the operation. 
 
_______________________________________________________________________________  
8945/2/02  
98 
ANNEX 1 
DG E 
EN 

Annex 1 
Remarks: 
- 
Association of Associates and EFTA/EEA countries to be assessed on a case 
by-case basis for possible participation 

Routine consular protection available to EU citizens on basis of Decision 
95/553/EC (OJ L 314 of 28.12.95, P.73) in particular under "relief and 
repatriation of distressed citizens of the Union" 

Draft Guidelines on "consular protection of EU citizens in emergency 
situations in third countries" under discussion at COCON (see Coreu 
PAR/0267/00 on "Dispositif mis en place pour sécurité des ressortissants à 
1'étranger". 
 
Selected Precedents: 
N.B.: ex art. J.4.2 no longer suitable (e.g. as in Council Decision of 27.6.96, doc. 
8386/96) 
 
 
 
 
 
 
 
 
 
 
 
_______________________________________________________________________________  
8945/2/02  
99 
ANNEX 1 
DG E 
EN 


Annex 2 
ANNEX 2: TEMPLATE CRISIS MANAGEMENT CONCEPT 
 
 
 

EU CRISIS MANAGEMENT CONCEPT – DRAFT STRUCTURE 
 
 
 

I. Executive 
SummaryThis should set down the broad options for an overall EU response to 
a crisis and highlight which option is recommended
 
II. General 
 
A.  Situation.  This should set down only those facts that are relevant to the development of 
options for an overall EU response to the crisis. This would focus on recent developments 
with regard to the positions taken towards the crisis by the local parties, neighbouring 
countries, relevant organisations – such as NATO, the UN and the OSCE - , by the ’15’ and 
the ‘6’, and by other close partners of the EU
 
B.  EU Political Context
 
(a)  Existing EU Engagement.  This should set down an outline of existing EU 
engagement in the crisis location that would include relevant factors such as 
formal agreements with the EU, the level of EU assistance and trade relations. 
 
________________________________________________________________________________ 
8945/2/02  
101 
ANNEX 2 [Council Secretariat encouraged to present an adapted version]      DG E 
EN 

Annex 2 
(b)  EU Political Interest, Political Objectives and Politico-Military Objectives.  This 
should set down, in so far as is possible at an early stage of a crisis, the how the 
EU political interest is affected by the crisis, and how the EU political interest 
might be affected by or by not contributing more actively in the resolution of the 
crisis. This EU political interest should also be translated into EU political 
objectives, again in so far as this is possible at an early stage of a crisis, which 
should then guide development of the ‘Desired Endstate’Should a military role 
be identified in one or more of the options for an overall EU response, 
politico-military objectives may start being defined on the basis of the EU 
political objectives.  
 
(c) Desired 
Endstate. The desired endstate should set down the specific objectives to 
be achieved by the overall EU response to the crisis
 
C.  AssumptionsThis should set down those assumptions that are needed to enable options for 
an overall EU response to be developed. Assumptions temporarily replace facts for issues 
where there is incomplete information, for situations that are continually changing or for 
situations in which the EU does not have exclusive control over an outcome or for when it 
cannot predict an outcome. 
 
D.  LimitationsThis should set down those practical, legal and political factors that limit what 
may be done. 
 
III. 
Description of Different Options for an Overall EU Response.  This should set down a 
brief overview of the different options and should explain the rationale for the differences 
between each option. 
 
________________________________________________________________________________ 
8945/2/02  
102 
ANNEX 2 [Council Secretariat encouraged to present an adapted version]      DG E 
EN 

Annex 2 
A.  Option 1
 
1.  Achieving the Endstate. This should explain how this option can meet the ‘Desired Endstate’. It 
should provide a rationale for the selection of the range and scale of measures and instruments 
by explaining the role to be played by each measure within the overall approach. It should also 
explain the interaction required between various measures and the possible sequence in which 
these measures should be employed within the overall scheme. It may also make an initial, early 
evaluation of the overall duration of a possible operation and may indicate how long the 
various measures should be employed for. 
 
2.  Cooperation Envisaged With Other International Organisations, The '15', The '6' And Other 
Close Partners of the EU. This should set down those elements of cooperation that is envisaged 
or required
 
3. Information Strategy. This should set down the broad outline of an information strategy tailored 
to Option 1
 
4. Financial Considerations. This should set down, in so far as is possible at an early stage of a 
crisis, relevant financial considerations for Option 1. 
 
5.  Considerations Related To A Legal Basis. This should set down, in so far as is possible at an 
early stage of a crisis, considerations related to a legal basis for actions within Option 1. 
 
________________________________________________________________________________ 
8945/2/02  
103 
ANNEX 2 [Council Secretariat encouraged to present an adapted version]      DG E 
EN 

Annex 2 
6.  Measures Envisaged In Option 1.  This should set down, possibly in a table format, the 
diplomatic, economic, humanitarian 42, other civilian measures such as rule of law, civilian 
administration and civil protection, and the police and military measures envisaged in Option 
1: these measures would include both the alteration of existing Community and Member States' 
bilateral measures and the addition of new Community and Member States' bilateral measures. 
These measures may also be separated into those envisaged in the short-term and those 
envisaged in the medium to long-term43 44 
 
B.  Option 2(additional options for an overall EU response following the same structure as for 
Option 1). 
 
C.  Option 3(additional options for an overall EU response following the same structure as for 
Option 1). 
 
                                                 
42  
In accordance with Council Regulation (EC) No 1257/96 of 20 June 1996 concerning humanitarian aid, humanitarian aid "the sole aim of 
which is to prevent or relieve human suffering, is accorded to victims without discrimination on the grounds of race, ethnic group, religion, 
sex, age, nationality or political affiliation and must not be guided by, or subject to, political considerations" (preamble), and is provided on a 
"non-discriminatory basis" (Article 1). 
 
43  
The broad options relate to planning for a possible overall EU response to a crisis and should not be seen as an obstacle to those actions, 
particularly such as humanitarian aid or as could be triggered by the Rapid Response Mechanism, which the Commission could decide to 
deploy as and when required. Furthermore, the structure as suggested in this template CMC is indicative to show that co-ordination of these 
different elements will be required for a coherent and comprehensive EU response to a crisis and should not be seen to constrain either the 
development or the deployment of Community instruments in response to a crisis. 
 
44  
Member States' bilateral measures would be included in the Crisis Management Concept after consultation with Member States. 
 
________________________________________________________________________________ 
8945/2/02  
104 
ANNEX 2 [Council Secretariat encouraged to present an adapted version]      DG E 
EN 

Annex 2 
IV.  Comparison of Options, Cost, Effectiveness, Risk and Feasibility Assessment
This should explain, in so far as is possible at an early stage in the planning process, the 
pros and cons of the options in relation to each other, and should evaluate the differences in 
cost, effectiveness and risk between the options. It should also set down a feasibility 
assessment. 
 
V. 
Recommendation to the Council.  This should set down which Option should be 
recommended by the PSC to the Council. It will also provide a rationale for this 
recommendation. ] 
 
 
 
 
 
 
 
 
 
 
 
________________________________________________________________________________ 
8945/2/02  
105 
ANNEX 2 [Council Secretariat encouraged to present an adapted version]      DG E 