BACKGROUND
WATER - WASTE WATER  GREYSTONES
On 29/10/2009, the ECJ ruled that Irish legislation and practice was not compliant with Article 4 and 8 of the Waste Directive,
75/442/EEC, now codified in Dir. 2006/12/EC. More specifically, it ruled that:
"by failing to adopt, save in County Cavan, all the laws, regulations and administrative provisions necessary to comply with
Bases juridiques : Directive:31975L0442; Directive:31985L0337; Directive:31991L0271; Directive:31997L0011;
Articles 4 and 8 of Council Directive 75/442/EEC of 15 July 1975 on waste, as amended by Council Directive 91/156/EEC of
Directive:32003L0035; Directive:32006L0012
18 March 1991, as regards domestic waste waters disposed of in the countryside through septic tanks and other individual
waste water treatment systems, Ireland has failed to fulfil its obligations under that directive."
Stade : Mauvaise application - Directives
Financement communautaire : O
Procédures en relation : dossier père -> ; dossiers fils -> 20054478; 20025422; 20025292; 20044678;
The case arose out of a complaint that a major Community co-financed urban waste water treatment project at Greystones
built in the mid-1990s would involve enclosure of all areas likely to give rise to foul odours. However, according to the
complainant, storm tanks were never enclosed, and there have been severe odour problems. The Commission services
Fait Incriminé :
identified lack of Community and domestic legislation justifying the non-application of Dir 75/442/EEC to the control of
odours from waste-water treatment plants.
Failure of Community co-financed urban waste water treatment plant to comply with environmental safeguards proposed in
the environmental impact assessment for the project
RELEVANT LEGISLATION
Art.4 of Dir. requires MS to take the necessary measures to ensure that waste is recovered or disposed of without endangering
human health and without using processes or methods which could harm the environment.
Art.8 of Dir requires MS to take the necessary measures to ensure that any holder of waste has it handled by a private or
public waste collector or by an undertaking which carries out the operations of disposal or recovery listed in Annexes IIA and
IIB, or recovers of it himself in accordance with the provisions thereof.
Mise en demeure 258 (ex226) :
Mise en demeure 260 (ex228) :
ANALYSIS AND FOLLOW-UP
Décision : 16/10/2002:PV(2002)1585
Décision : 24/11/2010:E/2010/8176;C(2010)7997
Envoi : 18/10/2002:SG(2002)D/220747
Envoi :
A pre260 letter was sent to Ireland on 23 November 2009 (ARES(2010)336534). Ireland responded on 22 December 2009
Réponse :
Réponse :
(ARES(2010)397657). Ireland provided an outline of proposed measures and a timeframe for their adoption. The proposed
measures aim to introduce duties and responsibilities on householders to comply with national standards and local authorities
Mise en demeure complémentaire 258 (ex226) :
Mise en demeure complémentaire 260 (ex228) :
with regard to planning, assessment and inspection of the on-site waste-water treatment systems. No draft measures were
Décision : 16/12/2003:PV(2003)1639
Décision :
provided. A meeting between the Irish authorities and the Commission took place on 4 March 2010. In that meeting Irish
Envoi : 19/12/2003:SG(2003)D/233715
Envoi :
authorities elaborated on the proposed measures. Ireland sent a further letter on 19 March 2010 (ARES(2010)149044)
Réponse :
Réponse :
providing a copy of Circular PSSP 1/10 mentioned in the meeting. No draft measures were provided.
Avis motivé 258 (ex226) :
Avis motivé ex228 :
Since then, the Commission has not received any draft legislation from the Irish authorities and no additional information has
Décision : 09/07/2003:PV(2003)1620
Décision :
been provided on how the envisaged drafting and consultation is proceeding. On 26 October 2010 the national authorites
Envoi : 11/07/2003:SG(2003)D/220418
Envoi :
informally informed the Commission that a stakeholder consultation process had been launched on 19 October 2010. The
Réponse :
Réponse :
Commission services conclude that Ireland has still not taken all of the measures it was required to take to comply with the
judgment of the Court of Justice and therefore propose LFN 260 for M11/2010.
Avis motivé complémentaire 258 (ex226) :
Saisine 260 (ex228) :
Décision : 14/12/2004:PV(2004)1683
Décision :
CONSLUSION
Envoi : 22/12/2004:SG(2004)D/206148
Dépot décision :
260 Letter of Formal Notice for M11/2010.
Réponse : 23/12/2009:Ares(2009)397657
Réf.Aff. :
D.Arrêt :
Saisine 258 (ex226) :
Décision : 16/03/2005:PV(2005)1694
Dépot décision : 06/05/2008:JURM (2008) 8191
Réf.Aff. : C-2008/188
D.Arrêt : 29/10/2009:COMMISSION
Origine plainte (2 dern.):
Correspondance avec l'état membre (2 dern. évén.):
07/03/2000:Plainte - Accusé de réception:SG(2000)D/20592
10/08/2001:EM - Envoi lettre rappel:
22/01/2000:Plainte - Réception:SG(2000)A/02290
11/04/2001:EM - Envoi lettre
Historique des décisions (6 dernières décisions) :
24/11/2010:E/2010/8176;C(2010)7997:Mise en demeure 260(ex228):
27/06/2007:PV(2007)1794:Saisine 258(ex226) - Exécution sans délai:
12/12/2006:PV(2006)1769:Saisine 258(ex226) - Fin sursis + Exécution sans délai:
28/06/2006:PV(2006)1751:Saisine ex226 - Continuer sursis:
04/04/2006:PV(2006)1740:Saisine 258(ex226) - Sursis:
13/12/2005:PV(2005)1726:Saisine 258(ex226) - Exécution sans délai (aut. de contact) :
Etat des consultations :
Prop. du service responsable :
MD258(ex226)
MDC258(ex226)
AM258(ex226)
AMC258(ex226)
MD260(ex228)
MDC260(ex228) Prop. des chefs de cabinet :
DG -> SJ
Prop. décision de la Commission :
SJ -> DG
03/09/2002
27/11/2003
Position du service juridique :
DG -> SG
Document généré par Veronique PINTE le 24/11/2010 11:38 cette information est enregistré dans un fichier d'audit
- 1 -