8. ANNEX B: DETAILED MODEL CONTRACT FOR THE THIRD PARTY DATA
Commented 
Clauses to be added : IP ; Business 
Continuity Plan ; Liability exemption for the Contractor in case of 
STORAGE
illicit data ; Access to Data (with corresponding duties for persons 
accessing to Data). 
8.1. General Terms and Services 
Commented 
Please add a table of content 
Agreement 
in  the  person  of  its  legal 
Commented 
The structure of the Contract should be 
representative pro tempore, 
reviewed.  I do not see any added value to the distinction between 
between 
GTC (+ annex) and STSs (also with annexes) except if the provisions 

and
and the rules are different (depending on the object of the STS).  

the
company 
There is also a risk of inconsistency between the contractual 
This Agreement is signed between 
________________________ 
documents, with a higher level of complexity.   
Recommended structure :  
the company ______________________ 
VAT 
number 
- Work Order (with limited derogation to GTC – on duration ; 
with 
VAT 
number 
________________________, 
liability CAP, etc.). 
_____________________, 
based 
in 
based 
in 
- GTC
- Annex 1 (technical + SLA)
________________________ 
________________________ 
- Annex 2 (price)
(hereinafter  the:  “Contractor”)  in  the 
(hereinafter 
referred 
to 
as 
Commented [LM4]: Wouldn't it be possible to have a more 
person  of  its  legal  representative  pro 
Manufacturer/Importer”). 
simple model SLA, rather than General Terms of Service 
tempore  undertakes  to  perform  with 

The
Contractor 
and 
the 
(hereinafter: “GTS”), which include the Technical Requirements 
respect to 
Manufacturer/Importer 
will 
(hereinafter: “TR”, Annex 1 to the GTS) together with the Special 
hereinafter  be  referred  to  jointly 
Terms of Service (hereinafter: “STS”), which include the Service 
the 
company 
as the “Parties” or individually as 
Level Agreement (hereinafter: “SLA”, Annex A to the STS) and the 
Price Conditions (hereinafter: “PC”, Annex B to the STS)? 
________________________  with  VAT 
a “Party”. The GTS, the STS and 
number  ________________________, 
the  Annexes  will  be  jointly 
Commented [ET5R4]: We have reviewed this matter with our 
based  in  ______________  (hereinafter 
referred 
to 
below 
as 
the 
external legal advisors and this is the most common and accepted 
standard for cloud storing agreements. In comparison with other 
referred 
to 
as 
“Agreement”. 
model contracts of this nature, this is the most simple that it can 
Manufacturer/Importer”)  who  make 
 
already get. 
a  request  according  to  the  terms  and 
modalities described herein.  
WHEREAS 
We suggest to keep this structure and discuss it with the external 
expert(s) during the review.  
The 
Contractor 
and 
the 
1. Introduction and definitions 
Commented 
It should start with this part. 
Manufacturer/Importer will hereinafter be 
1. Directive  2014/40/EU  on  tobacco
Formatted: Justified
referred  to  jointly  as  the  “Parties”  or 
products  (hereinafter  “Directive”)  aims
Commented 
To be defined 
individually as a “Party”. 
to improve the functioning of the internal
Commented 
1.1.to 1.4. should be included in the 
1.5.This Agreementese General Terms of 
market for tobacco and related products,
“whereas” of the Agreement, together with a short presentation of 
the Parties. 
Service 
(hereinafter: 
“the 
while  ensuring  a  high  level  of  health
AgreementGTS”), which includes: 
protection  for  European  citizens.  The
Directive  entered  into  force  on  19  May

Annex
1: 
the 
Technical 
2014  and  became  applicable  in  the  EU
Requirements (hereinafter: “TR”, 
Member States on 20 May 2016.
Annex 1 to the GTS) together with 
the  Special  Terms  of  Service 
2. Article 15 of the Directive requires that
(hereinafter: 
STS”), 
which 
all  economic  operators  involved  in  the
include 
the 
Service 
Level 
trade  of  tobacco  products,  from  the
Agreement  (hereinafter:  “SLA”, 
manufacturer  to  the  last  economic
Annex A to the STS) and  
operator  before  the  first  retail  outlet,

Annex  2:  the  Price  Conditions
record  the  entry  of  all  unit  packets  into
(hereinafter:  “PC”,  Annex  2B  to
their  possession,  as  well  as  all
the GSTS),
intermediate  movements  and  the  final

Annex  3:  Definitions.Anne  3:
exit  of  the  unit  packets  from  their
Definitions.  govern the provision 
possession.
of  Service  that  the  company 
3. For  the  purpose  of  hosting  the  data
________________________ 
storage  facility  for  all  relevant  data
VAT 
number 
generated  by  the  abovementioned
________________________, 
obligation,  the  Directive  requires  that
based 
in 
Member 
States 
ensure 
that
________________________ 
manufacturers  and  importers  of  tobacco
(hereinafter  the:  “Contractor”) 
products conclude data storage contracts
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
with an independent third party. The data 
(hereinafter 
referred 
to 
as 
storage facility shall be physically located 
Manufacturer/Importer”). 
on the territory of the European Union. 
The 
Contractor 
and 
the 
4. The  resulting  data  storage  of  the
Manufacturer/Importer will hereinafter be 
Tracking and Tracing System is based on:
referred  to  jointly  as  the  “Parties”  or 
individually  as  a  “Party”.  The  GTS,  the 
i) a  group  of  independent  Primary  Data
STS  and  the  Annexes  will  be  jointly 
Commented 
The relationship (and the difference) 
Storage  solutions,  where  each  Primary
referred to below as the “Agreement”. 
between Primary Data Storage solutions and Surveillance Data 
Data  Storage  solution  hosts  data 
Storage Solution remains unclear.  I also understand that both kinds 
exclusively 
related 
to 

specific 
56. Pursuant  to  Article  15(8)  of  the
of services could be provided by distinct providers.  Should it be the 
case, the duties of each of them must be very clear (as well as the 
manufacturer/importer  or  a  group  of 
Directive,  the  European  Commission
liability in case of breach).  
distinct manufacturer(s)/importer(s);  
approves the suitability of the Agreement
Commented [everis10R9]: Indeed, both kinds of services 
as  a  model  contract  to  comply  with  the
could be provided by distinct providers. However, we are putting 
ii) a  central  Surveillance  Data  Storage
Directive  and  to  assure  the  Contractor’s
focus now on developing the contract between the 
solution which hosts a global copy of the
independence and technical capacities.
manufacturers/importers and the provider(s) of primary data 
distributed  data.  On  this  basis,  the
storages.  
Surveillance Data Storage solution is able
67. The present Agreement regulates the
Commented 
To be defined 
to  offer  a  comprehensive  logical  view  of
relationship between the Parties and also
Commented 
To be included in the whereas. 
all relevant data based on its local data,
enables  the  European  Commission  and
which  could  be  further  exploited  for  the
the  competent  authorities  to  effectively
enforcement  required  by  the  Directive.
exercise their rights pursuant to Article 15
Also,  the  Surveillance  Data  Storage
of the Directive.
solution  provides  a  secure  Repository
Router component (as defined in Annex 1
78. Unless  specifically  provided  in  the
“Technical  Requirements”)  to  facilitate
Agreement, all terms shall have the same 
that  the  distributors  and  wholesalers
meaning  as  defined  in  Article  2  of  the 
Commented 
For clarity purposes, I recommend to 
transmitting  their  reports  seamlessly
Directive. 
include such definitions in the Agreement and to define also the 
through a single point.
other terms (in annex or in the first provision). 
The Parties have agreed as follows: 
Commented [everis17R16]: To be included as an Annex 
Agreement 
1. General Scope and structure of the 
Commented 
Article 1 and 2 (or 3) should be reviewed in 
order to ensure that there are no redundancies, and that the scope 
between 
Agreement General Terms of Service 
and main duties are clearly explained and presented. 
(GTS)  and  Special  Terms  of  Service 
Commented [LM11]: 
1.5.These  General  Terms  of  Service 
(STS) 
Wouldn't it be possible to have a more 
simple model SLA, rather than General Terms of Service 
(hereinafter:  “GTS”),  which  include  the 
(hereinafter: “GTS”), which include the Technical Requirements 
Technical  Requirements  (hereinafter: 
1.1.  The  GTS  describes  the  general 
(hereinafter: “TR”, Annex 1 to the GTS) together with the Special 
TR”, Annex 1 to the GTS) together with 
content  of  the  commitments  that  the 
Terms of Service (hereinafter: “STS”), which include the Service 
the Special Terms of Service (hereinafter: 
Parties assume with regard to the supply 
Level Agreement (hereinafter: “SLA”, Annex A to the STS) and the 
Price Conditions (hereinafter: “PC”, Annex B to the STS)? 
STS”),  which  include  the  Service  Level 
of  Service  identified  in  the  relative  STS 
Agreement (hereinafter: “SLA”, Annex A 
provided.  by  the  Contractor  and  further 
Commented [ET12R11]: We have reviewed this matter with 
to  the  STS)  and  the  Price  Conditions 
details  the  specific  content  of  the 
our external legal advisors and this is the most common and 
accepted standard for cloud storing agreements. In comparison with 
(hereinafter: “PC”, Annex B to the STS), 
commitments 
that 
the 
Parties 
other model contracts of this nature, this is the most simple that it 
govern  the  provision  of  Service  that  the 
respectively assume. 
can already get. 
company  ________________________ 
VAT 
number 
2.2.  The  STS  describes  the  service 
We suggest to keep this structure and discuss it with the external 
expert(s) during the review.  
________________________,  based  in 
provided  by  the  Contractor  and  further 
________________________ 
details  the  specific  content  of  the 
Commented 
Please explain also the structure of the 
Agreement here :  
(hereinafter  the:  “Contractor”)  in  the 
commitments 
that 
the 
Parties 
-The GTS
person  of  its  legal  representative  pro 
respectively assume. 
-The Annexes to the GTS 
tempore, 
-WO?
1.2.  The  GTS  together  with  the  relative 
Commented 
It should start with this part. 
and 
STS and Annexes govern the relationship 
between the Parties. 
Commented 
Structure to be reviewed 
 the 
company 
Commented 
Please explain what is covered by the 
________________________ 
VAT 
2.4. In case of conflict, the provisions of 
“Services” (data storage, access, maintenance and support). 
number  ________________________, 
the STS prevail over the provisions of the 
Commented 

based  in  ________________________ 
GTS. 
And in case of conflict between the STS or 
between terms of STS and Annex? Structure : to be moved in the 
final provisions of the agreement. 
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
1.3  The  Service  provided  by  the 
the 
Agreement. 
The 
Commented 
To be defined.  Object and scope of the 
Contractor to the Manufacturer/Importer 
Manufacturer/Importer  may  terminate 
service should also be detailed (in a provision of the agreement) : 
is  described  in  detail  in  the  related 
the  contract,  under  approval  of  the 
- Primary Data Storage 
Technical RequirementsSTS (hereinafter: 
European Commission, if those conditions 
- Surveillance Data Storage 
- And for both : (i) access to Data (by whom and under which 
Service”). 
are no longer maintainedfulfilled. 
requirements) ; (ii) Support and maintenance. 
Unless  specifically  provided  in  the 
3.4.  The  expertise  and  independence 
Commented 
For clarity purposes, I recommend to 
include such definitions in the Agreement and to define also the 
Agreement,  allcapitalised  terms  or 
required to the Contractor are set in the 
other terms (in annex or in the first provision). 
expressions  terms  shall  have  the  same 
Delegated Acts adopted by the European 
Commented [everis24R23]: 
meaning  as  definedindicated  in  Annex 
Commission  in  accordance  with  article 
To be included as an Annex 
3rticle 2 of the .  Directive.
Commented [everis26R25]: The full description of the 
  
15.12 of the Directive. 
technicalities of both Data Storages is to be included in the Technical 
2.
Subject
matter 
for 
this 
3.54.  The  Contractor  undertakes  agrees 
Requirements (currently under preparation) 
AgreementMain 
duties 
and 
to  provide  the  Manufacturer/Importer 
Commented 
Add provision on duty referred to in Article 
warranties of the Contractor 
with  information  on  updates  (as  defined 
15 (9) 
in Annex 1 “Technical Requirements”) and 
Commented 
Updates = maintenance? 
2.1.  The  Contractor  will  provide  the 
to  implement  updates  during  the 
Commented 
To be defined 
Sservices  as  described  in  Annex  1 
execution  of  the  Agreement  pursuant  to 
“Technical Requirements”. The Contractor 
Commented [everis38R37]: 
Annex 1 “Technical Requirements”).  
To be defined in the Technical 
and  Manufacturer/Importer  may  also 
Requirements document, currently under preparation. 
agree on  Contractor providing additional 
3.65. The Contractor makes available to 
Commented 
Support is not only hotline.  Must be much 
services and new services.  
the 
Manufacturer/Importer 
supporta 
more detailed in the SLA. 
telephone  and/or  e-mail  hotline  services 
Commented 
To be moved to a specific provision named 
2.2.  The  Contractor  shall  develop  a 
for  providing  support,  pursuant  to  the 
“Business continuity plan”.  Main duties should be included in the 
business  continuity  plan  prior  to  the 
specifications  set  forth  in  Annex  A  1 
agreement. 
commencement date. 
“SLLA”. to the STS.  
Commented 
Articles 3 and 4 should be put together.  
The Contractor should warrant that the contractual and legal rules 
3.
Obligations
of 
Contractor, 
4. Availability  and  performance  of
are respected.  A difference could also be made, when applicable, 
procedures  for  the  implementation, 
between obligations of result and obligations of means.  
Service 
maintenance  and  support  of  the 
Commented 
Structure : should be included under 3 
Service. 
3.74.1.  The  Contractor  maintains  the 
(Obligations) 
operability,  availability  and  performance 
Commented [LM30]: The first thing to do is to define the 
3.1. The Contractor warrants that the The 
of  the  Service  for  the  duration  of  this 
service covered by this contract 
Service  ishall  bes    offered  provided  in 
Agreement  in  accordance  with  the 
Commented [ET31R30]: We rather prefer to describe it in the 
compliance  with  the  present  Agreement 
requirements  set  forth  in  Annex  1 
Special Terms of Service, mainly because the service to be provided 
and  the  relevant  annexes,  in  particular 
“Technical  Requirements”  and  Annex  A 
in the surveillance data storage is not the same service to be 
the technical specifications (as defined in 
provided in the primary data storage. The scope and responsibilities 
“SLA” to the STS. 
of the service are different, and therefore specified in the STS.  
Annex  1  “Technical  Requirements”).    It 
also  warrants  that  it  and  will  be 
3.84.2.  The  Contractor  informs  the 
Commented [LM41]: Isn't this a repetition of par. 3.1? 
implemented  at  latest  by  the  date 
Manufacturer/Importer about the service 
Commented [ET42R41]: No, this paragraph specifies that that 
specified  in  the  STSthis  Agreement., 
maintenance.  
contractor shall not only provide the service, but also ensure its 
subject to acceptance tests if so provided 
operability, availability and performance of the Service.  
therein. 
4.323.9. The Service may be interrupted 
Commented 
Does it mean that there should be an 
for  the  performance  updates  and 
acceptance procedure?  If so, the criterions of acceptance must be ...
3.2. The Contractor warrants that, when 
Ordinary Maintenance” (the scheduled 
Commented 
Additional rules must be prescribed with 
providing the Service, it shall undertakes 
maintenance  by  the  Contractor)  or 
regard to maintenance (corrective maintenance? Evolutive 
...
to complycomply with the applicable law 
Extraordinary 
Maintenance” 
Commented [everis44R43]: Developed in the SLA annex. 
and the Implementing and Delegated Acts 
(unplanned 
maintenance 
of 
the 
Commented 

adopted  by  the  European  Commission 
Contractor  due  to  events  beyond  the 
The maintenance must be a duty 
(otherwise, for security reasons, the risks will be inacceptable). 
pursuant to the Directive. 
reasonable control of the Contractor), as 
described  in  Annex  1  ‘SLA’.  The 
Commented [LM46]: Will the contractor have the right or the 
3.3. The Contractor assures warrants its 
obligation to carry on the maintenance? 
Contractor will havehas the obright (and 
independence  from  the  tobacco  industry 
obligation  when  required)  to  carry  out 
Commented [ET47R46]: Updated 
and its technical capacities with respect to 
updates,  patches,  fix  bugs,  or  perform 
Commented 
To be defined.  This point is very 
the 
performance 
of 
the 
Service. 
other  maintenance  on  the  Service  in 
important.  It means indeed that the Contractor is like a trust service 
...
Independence and technical capacities of 
compliance  with  the  Annex  1  “Technical 
Commented [everis34R33]: The expertise and independence 
the  Contractor  is  toshall  be  assessed  by 
Requirements” and Annex A “SLA”. to the 
requirements are to be defined by the EC in the delegated acts to be 
...
the 
European 
Commission, 
and 
STS. It is understood that the Contractor 
Commented 
It should be a warranty.  What will occur, 
maintained during the whole duration of 
shouldn’t it be the case in the future?  What are the criterions taken 
...
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
will 
promptly 
notify 
the 
Contractor  will  document  such  change 
Manufacturer/Importer 
of 
scheduled 
using the Change Request Form attached 
Ordinary  Maintenance.  The  Contractor 
in Exhibit XX (Change Request Form) that 
will take all reasonable efforts to forewarn 
sets for the a description of the change, 
the 
Manufacturer/Importer 
of 
the rational for the change and the impact 
Extraordinary 
Maintenance 
and 
to 
the  change  will  have  on  the  price  and 
minimise  the  inconvenience  resulting 
timeline  for  completion  of  the  affected 
from such interventions. 
Service. The Manufacturer/Importer shall 
4.
Improvement
of 
the 
not be obliged to pay for any change that 
ServiceChange control procedure 
has not been approved in  writing and in 
Commented 

advance  in  accordance  with  this 
Perhaps are there too many details.  How 
is it articulated with the duty to submit to the Commission for 
4.1. The  Manufacturer/Importer  may,  at 
Agreement.  In  no  event  will  changes  be 
approval? 
any  time,  suggest  or  request  changes, 
requested 
that 
require 
modifications, or additions to the scope of 
manufacturer/importer to bear the cost of 
the  Service.  The  Contractor  may  also 
delays, failures or rework attributable to 
propose changes. Such requests shall be 
the  Contractor’s  failure  to  perform  in 
conducted in accordance with the Change 
accordance  with  this  Agreement  or  that 
Control procedures set forth in this article 
arise  from  the  Contractor’s  delivery  of 
34. The  Contractor  shall  not  take  any
defective or unacceptable Services. 
action  or  implement  any  decision  which 
may  have  a  material  effect  on  the 
have 
the 
right 
to 
request 
the 
Manufacturer/Importer 
or 
which 
improvement of the Service through the 
adversely  affects  the  function  or 
submission  to  the  Contractor  of  a  new 
performance  of,  or  decreases  the 
STS, that has to be agreed and accepted 
Commented [LM49]: Should the STS be signed by both Parties 
resource efficiency below the agreed SLA, 
upon the Parties. 
as part of the contract? In that case it can't be unilaterally modified. 
without 
first 
obtaining 
Commented [ET50R49]: Updated 
5. Duration of the Service 
Manufacturer/Importer’s approval, which 
Commented 
A change request procedure must be 
the Manufacturer/Importer may withhold 
5.1. The Service is provided for the period 
included, in case of modification of the service, at the request of the 
at its sole discretion. 
M/I or following the suggestion of the Contractor.   
determined in the STS. 
Commented [everis52R51]: Change Control procedure 
4.2.  No  purported  amendment  or 
6.2. The duration and validity of the GTS 
included 
variation  of  this  Agreement,  or  any 
and  STS  are  decided  by  the  European 
Commented 
 Indefinite or definite duration? If 
provision  of  this  Agreement,  shall  be 
Commission  pursuant  to  Section  20 
indefinite, it is normally possible to terminated it with a reasonable 
effective unless it is in  writing in a form 
“Amendments  to  GTS  and  STS”.  This 
notice period.  In the present case, definite duration is probably 
specified  by  the  Manufacturer/Importer 
better, in order to ensure that a minimal duration will be respected. 
Agreement  shall  take  effect  on  the 
as  set  out  in  Exhibit  XXX  (Request  for 
effective  date  and  shall  continue  and 
Change Form) and duly executed by or on 
remain in full force for a period of five (5) 
Commented 
As it is a “model contract”, I suggest to 
behalf of each of the Parties (a “Change 
years (the “Term”) unless and until earlier 
mention a minimal duration (and parties are free to agree on a 
Order”). A Change Order can never result 
terminated  in  accordance  with  this 
longer period). 
in  a  non-compliance  with  the  Technical 
Agreement. 
Requirements of Annex 1. 
5.2.  Manufacturer/Importer  shall  have 
4.3.  The  scope  of  the  Service  may  be 
the right to extend the Term for up to 2 
subject to additions, deletions or revisions 
renewal periods of 1 year each by giving 
Commented 
Why is it limited? 
agreed  upon  by  the  Parties.  Additions, 
the  Contractor  written  notice  of  its 
deletions or revisions that may impact the 
intention to do so at least six (6) months 
price  or  timeline  for  completion  of  the 
before  the  end  of  the  Term  of  extended 
Service must be approved in advance and 
term (as the case may be). All extensions 
in writing by the Manufacturer/Importer. 
to the Term shall be on the same terms 
If and to the extent that any change does 
and conditions (including charges) as set 
not  materially  increase  the  costs  or 
out in this Agreement. 
resources requirements of the Contractor, 
such change will not increase the price or 
6.
Confidentiality
and 
timeline  for  completions  of  the  affected 
announcements
Service.  If  a  change  will  materially 
increase  the  price  or  timeline  for 
completion  of  the  affected  Service,  the 
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
6.1.  The  Recipient  Party  shall  hold  all 
pertaining to such and provide an affidavit 
confidential 
information 
in 
strict 
to such effect. 
confidence, and specifically, shall: 
6.2.  Unless  expressly  agreed  otherwise, 
(i) Use  confidential  information  only  for
all  rights,  title  and  interest  to  and  in 
the  purposes  of  the  performance  of  its 
confidential  information  shall  vest  and 
obligations under this Agreement; 
remain in the Disclosing Party; 
(ii) Restrict  disclosure  of  or  access  to
6.3.  Should  the  Recipient  Party  be 
confidential 
information 
to 
its 
required 
to 
disclose 
confidential 
representatives, 
advisors, 
auditors, 
information  pursuant  to  a  statute,  a 
members  and  users  who  need  to  know 
regulation  or  the  order  of  a  court  of 
such for the purposes of the performance 
competent  jurisdiction  or  a  public 
of  the  Agreement,  and  not  divulge 
authority,  the  Recipient  Party  shall  (a) 
confidential information to any other third 
immediately  after  gaining  knowledge  or 
parties  or  give  any  other  third  party 
receiving  notice  of  such  legislative, 
access to confidential Information without 
administrative  or  judicial  action,  notify 
the  Disclosing  Party’s  prior  written 
the Disclosing Party thereof in writing and 
consent; 
give the Disclosing Party the opportunity 
to  seek  any  legal  remedies  so  as  to 
(iii) Subject any person having access to
maintain such confidential information in 
confidential information for the purpose of 
confidence,  (b)  only  supply  confidential 
performing 
this 
Agreement 
to 
information  that  it  is  legally  required  to 
confidentiality and non-use obligations at 
disclose,  and  (c)  take  all  possible 
least as restrictive as the ones set out in 
measure to maintain the confidentiality of 
this Agreement, and make such person is 
confidential information. 
Commented 
Check consistency with rules applicable to 
aware, prior to any disclosure or access, 
access to data. 
of  the  confidential  nature  of  this 
6.4. Neither Party shall issue any media 
information. Upon request, the Recipient 
release,  public  announcement  or  other 
Party  shall  provide  the  Disclosing  Party 
disclosure  relating  to  the  existence,  the 
with  the  names  of  the  persons  having 
purpose  and  the  content  of  the 
access to confidential information; 
Agreement  or  use  the  name,  trademark 
or logo of the other Party without the prior 
(iv) Only make such copies of confidential
written  agreement  of  the  other  Party 
information  as  are  strictly  necessary  for 
including, 
without 
limitation, 
in 
the  performance  of  its obligations  under 
promotional  or  marketing  material, 
the  Agreement,  and  not  alter,  modify, 
provided that nothing in this article shall 
dissemble, reverse engineer or decompile 
restrict  any  disclosure  to  the  extent 
any Confidential Information; 
required  by  a  legislative,  administrative 
or  judicial  action  as  mentioned  under 
(v)
Notify
the 
Disclosing 
Party 
article above. 
immediately 
upon 
suspecting 
or 
becoming  aware  if  any  unauthorised 
6.5.  Confidential  information  shall  not 
disclosure,  access  or  use  of  confidential 
include  information  that  the  Recipient 
information  and  take  all  measures 
Party can prove: 
necessary  to  prevent  any  (further) 
unauthorised  disclosed,  access  or  use 
(i) is  at  the  time  of  disclosure,  or
thereof; 
thereafter becomes, in the public domain 
without violation of this Agreement, 
(vi) Upon the Disclosing Party’s request at
any time and in any event upon expiration 
(ii) is lawfully obtained from a third party
or  termination  of  the  Agreement,  at  the 
that 
has 
lawfully 
obtained 
such 
Disclosing  Party’s  option,  promptly 
information; or 
destroy or return the disclosing Party its 
confidential  information,  including  any 
(iii) was already known by and on record
copies,  notes,  recordings,  memoranda 
at the Recipient Party prior to disclosure 
and  other  documents  and  supports 
by the Disclosing Party or prior to access 
Commented 
Please check conformity with prohibition 
by the Recipient Party; or 
to modify or delete recorded data. 
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
(iv) is  developed  by  the  Recipient  Party
Manufacturer/Importer’s 
instructions, 
completely 
independently 
of 
any 
except for an obligation imposed by law. 
disclosure  by  the  Disclosing  Party  or  of 
any access by the Recipient Party. 
(ii)
unless  otherwise  requested  by
Manufacturer/Importer, process personal 
6.6.  The  obligations  and  restrictions  set 
data  only  to  the  extent  and  in  such 
forth in this article shall be in force for the 
manner, as is necessary for the provision 
term of the Agreement and shall remain 
of  the  Services;  and  for  no  other 
in  effect  twenty  (20)  years  after 
purposed; 
expiration  or  termination  or  termination 
of  the  Agreement  for  any  reason 
(iii)
ensure  that  all  necessary  or
whatsoever. 
appropriate  technical  and  organisational 
measures 
shall 
be 
taken 
and 
implemented  to  (a)  protect  the  security 
and  confidentiality  of  personal  data 
7. Data protection and access rights 
processed by it in providing the Services, 
Commented 
Are there any personal data in the 
and  (b)  protect  personal  data  against 
meaning of GDPR? 
7.1.  In  this  article,  “process”,  “data 
unauthorised  or  unlawful  processing  of 
Commented 
Clear distinction shall be made between 
processor”, “data subject” and “personal 
personal data and against accidental loss 
confidentiality and data protection. 
data” shall have the meaning given in the 
or destruction of, or damage to, personal 
Commented
 
EU  Data  Protection  Directive  95/46/EC 
Not yet compliant with Article 28 of the 
data; and notably implement the security 
GDPR. 
and,  from  25  May  2018  in  compliance 
measures  imposed  under  applicable  law 
with  Regulation  UE  679/2016;  and 
or adopted by competent regulatory from 
implementing national laws in EU Member 
time to time; 
States, and all applicable data protection 
and  privacy  laws  and  regulations 
(iv) not  disclose  personal  data  to  any
(hereinafter, “Data Protection Laws”). 
employee,  director,  agent  or  affiliate  of 
the Contractor or any third party except 
7.2. The Contractor agrees to perform all 
as necessary for the performance of the 
Services under this Agreement, including, 
Service. 
without  limitation,  the  collection,  use, 
processing, storage, and maintenance of 
(v) take  reasonable  steps  to  ensure  the
personal  data,  in  accordance  with  the 
reliability  and  integrity  of  any  Staff  who 
Data  Protection  Laws  and  the  terms  of 
have access to the personal  data and, if 
this article.  
sensitive  personal  data  are  processed, 
draft  a  list  of  the  categories  of  persons 
7.3. To the extent that any personal data 
having  access  to  such  data  with  a 
is  processed  under  the  Agreement,  or  if 
description of their function, ensure that 
the Contractor receives or has access to 
they  are  kept  by  a  statutory  or 
any personal data under or in relation to 
contractual  obligation  to  maintain  the 
this  Agreement,  then  the  provisions  of 
confidentiality  of  such  data,  and  keep  a 
this article shall apply. To the extent the 
list 
of 
such 
persons 
at 
Contractor  receives  and/or  processes 
Manufacturers/Importer’s  or  competent 
personal data under or in relation to this 
regulators’ disposal; 
Agreement 
on 
behalf 
of 
the 
Manufacturer/Importer, 
as 
data 
(vi) not cause or permit personal data to
processor, the Contractor shall in respect 
be  transferred  outside  the  European 
of such personal data: 
Economic 
Area 
without 
Manufacturer/Importer’s  prior  written 
(i) act only on instructions and directions
consent; 
Commented 

from Manufacturer/Importer, which is the 
This could be an issue with regard to the 
obligation to locate data within the UE Territory.  It should not be 
data controller, and comply promptly with 
(vii) provide at no charge such assistance
allowed, including with prior written consent. 
all  such  instructions  and  directions 
as 
Manufacturer/Importer 
may  
received 
from 
the 
reasonably  require  in  order  to  the 
Manufacturer/Importer,  and  ensure  that 
Manufacturer/Importer  to  deal  with  any 
any  person  acting  under  its  authority 
request for data subject access under the 
having access to personal data may only 
applicable  Data  protection  Laws,  or  any 
process 
them 
upon 
request, inquiry or investigation initiated 
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
by  any  relevant  regulatory  authority  in 
had  such  conditions  imposed.  The 
Commented [LM71]: This is a repetition of section 7.1, I would 
respect of personal data; 
Contractor  regularly  monitors  that  such 
suggest to delete it. 
obligations  are  not  breached  by  its 
Commented [ET72R71]: This sections binds the employees 
(viii) comply  with  all  relevant  provisions
personnel or other persons it retains for 
and any other person related to the Contractor, we believe it is 
of applicable Data Protection Laws. 
the  performance  of  activities  under  this 
important to keep it due to the criticality of the data managed by 
Agreement. 
the data storage(s).  
7.4. 
The  Contractor  keeps  in  strict 
confidence  and  does  not  disclose  to  any 
7.4.  If  personal  data  are  handled  under 
Commented 
Provision on “Confidentiality” must be 
third party any data which it receives or 
the  present  Agreement,  the  Contractor 
completed (what is confidential information? Are there exceptions? 
which comes to its knowledge as a result 
undertakes  to  process  them  only  to  the 
Who can access? Penalty in case of infringement, etc.).  
of  the  performance  of  its  obligations 
extent  strictly  necessary  to  provide  the 
under this Agreement. Only the European 
Service and in compliance with Directive 
Commission,  the  competent  authorities 
95/46/EC as implemented in the relevant 
and  the  approved  external  auditor 
national  law  and,  from  25  May  2018  in 
Commented 
 How and when? 
(pursuant to Section 11 “Right of audit”) 
compliance with Regulation UE 679/2016; 
Commented 
Not sufficient to comply with GDPR 
have  full  access  to  the  Contractor’s 
(Contractor is acting as a processor and therefore the requirements 
facilities  and  data  stored  in  the 
7.5.  The  Manufacturer/Importer  retains 
of Article 26 must be respected).  Who is the controller? The 
performance  of  the  Service.  In  duly 
the  exclusive  responsibility  for  damages 
processor? Purpose of processing? International transfer… 
justified cases the European Commission 
caused  by  failure  of  the  preservation  of 
Commented [LM64]: I would suggest to have a paragraph on 
or  the  Member  States  may  grant  the 
the  confidentiality  of  authentication 
access rights, keeping in mind that the entities that will have access 
Manufacturer/Importer access to the data 
credentials,  including  the  password 
to the data storage won't be party of the contract.  
stored in the performance of the Service, 
needed to use the Service. The Contractor 
Commented [ET65R64]: Adapted  
provided  that  commercially  sensitive 
is not responsible for any damage that the 
information 
remains 
adequately 
Customer  may  incur  for  the  use  of 
Commented 
To be defined. 
protected in conformity with the relevant 
passwords,  authentication  credentials 
Commented [everis67R66]: By the EC in its delegated acts 
European Union and national law. 
and  accounts  by  third  parties,  of  which 
the  Manufacturer/Importer  is  or  is  not 
Commented [LM68]: This is already defined in the TPD, no need 
7.2 The Contractor strictly observes any 
aware,  nor  for  misuse,  unauthorised  or 
to repeat it. Please consider that this is a contract between industry 
specific  confidentiality  and/or  security 
and data storage provider, therefore you should always keep in 
illegal use of the account, password and 
mind that it binds only the contracting parties. 
obligations  (as  defined  in  Annex  1 
credentials 
attributable 
to 
the 
“Technical 
Requirements”). 
The 
Commented [ET69R68]: Even if it is already defined in the 
Manufacturer/Importer or others. 
TPD, we believe it is important to keep it here in order  to provide 
Contractor warrants that its technical and 
the full picture of the access rights and the use of data. 
organisational  security  measures  are 
8. Price, billing and payments
appropriate  to  protect  data  received  or 
We are aware that the agreement binds only the contracting parties 
which comes to its knowledge under this 
8.1.  ITn  consideration  for  Contractor 
(manufacturers/importers and providers of data storage(s) services), 
but it is also true that the TPD provides a strong legal frameworks 
Agreement  from  accidental  or  unlawful 
carrying 
out 
the 
Services, 
which needs to be referenced in the Agreement.   
destruction or accidental loss, alteration, 
Manufacturer/Importer  shall  pay  to  the 
Commented 

unauthorised  disclosure  or  access,  in 
Contractor  the  Charges  as  set  out  in 
Access right should be much more 
detailed.  “Parties agree that access to [please mention DATA] shall 
particular where such data is transmitted 
Annex 2 and on receipt of a valid invoice 
be given to the EU Commission and [please mention recipient] in 
over a network. 
in respect of such charges. 
accordance with [please mention legal provision], for the purpose of 
[please mention purpose]”.  In case of personal data, it must be 
7.3  To  ensure  that  confidentiality  and 
8.2.  Payment  for  Services  will  be 
compliant with the controller/processor relationship.  It could serve 
security  is  observed  at  all  times,  the 
dependent  on  the  acceptance  by 
as model, for consistency reasons, for the access to data that are not 
personal data.  It is recommended to add a specific provision on 
Contractor  similarly  binds  each  of  its 
Manufacturer/Importer of the services. 
access.  Access is requested to Contractor or to the M/I? 
employees and any other person it retains 
Commented [LM74]: How could the manufacture responsible 
for  the  performance  of  its  obligations 
8.3. Except for VAT, the Contractor shall 
for the credential and the authentication if under the Directive they 
under  this  Agreement  to  observe  the 
be  responsible  for  all  tax  liabilities  in 
shall not access the data storage? 
confidentiality  and  security  obligations 
respect  of  any  amounts  payable 
Commented [ET75R74]: Article 15.8 TPD: “n duly justified 
laid  down  in  this  Agreement.  The 
hereunder  and  hereby  agrees  to 
cases the Commission or the Member States may grant manufacturers 
Contractor shall impose on such persons 
indemnify 
manufacturer/importer 
in 
or importers access to the stored data, provided that commercially 
conditions  at  least  as  stringent  as  those 
respect  of  any  claims  with  ay  be  made 
sensitive information remains adequately protected in conformity 
with the relevant Union and national law.” 
laid  down  in  this  Agreement.  When 
against  Manufacturer/Importer  by  the 
deemed 
necessary 
by 
the 
relevant  authorities  in  respect  of  tax  or 
Commented 
Not applicable here (except at the 
beginning of the provision of the service, but I understand that the 
Manufacturer/Importer 
(and 
the 
similar  charges,  and  any  costs,  interest 
acceptance procedure was deleted). 
European 
Commission 
and/or 
the 
and penalties which may be found due in 
competent  authorities,  the  Contractor 
respect of such amounts. 
provides evidence that its personnel and 
the personnel of any subcontractors have 
2017 

Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
8.4. All sums due to the Contractor under 
Contractor  ensures  that  the  facilities 
this  Agreement  shall  be  payable  by 
providing  the  Service  remain  on  or  are 
Manufacturer/Importer 
by 
electronic 
relocated to the territory of the European 
bank  transfer  after  receipt  of  a  correct, 
Union. 
undisputed  and  properly  due  invoice 
which shall state, as a minimum: 
9.2.  Changes  in  the  physical  location  of 
the Contractor’s facilities during the term 
(i) a  short  description  of  the  relevant
of  the  Agreement  may  take  place  only 
Services; 
after  the  written  approval  of  the 
Manufacturer/Importer. 
(ii) the  period  to  which  the  invoice
relates; 
9.3. The Contractor may not subcontract 
Commented 
Why not? Also under its responsibility, and 
part of the Service to third parties. 
with prior written agreement of the M/I.  Are there providers on the 
(iii)
Contractor’s  bank  account  for
market that do not have any subcontractor? 
payment; and 
Commented [everis85R84]: Requested by DG SANTE 
(iv) all charges and applicable taxes.
9.3. In case of breach of the contract the 
Commented [LM86]: I don't think it is beneficial to allow for a 
Manufacturer/Importer  may  terminate 
subcontract of any of the activities which are part of the service. In 
addition the Directive doesn't allow the Commission to approve the 
8.5. If Manufacturer/Importer has a bona 
the Agreement. 
subcontractor. 
fide dispute in relation to the whole or any 
Commented [ET87R86]: 
parts  of  an  invoice  submitted  by  the 
10. Ownership of data
Updated.  
Contractor,  Manufacturer/Importer  may 
Commented
 To be included in Article 17 : Termination 
withhold  payment  of  the  amount  in 
10.1.  The  Contractor  processes  data 
Commented 
Ownership of data is a very complex and 
dispute. 
supplied  by  the  Manufacturer/Importer 
controversial question and this model contract is not the place to 
only  for  the  purposes  of  this  Agreement 
solve it.  Actually, it depends upon the legal framework used to 
8.6. Contractor shall continue to perform 
pursuant  to  the  Directive  and  the 
protect data (IP rules with data base or data protection rules).  In 
its obligations under this Agreement and 
Implementing 
and 
Delegated 
Acts 
this case, data shall not be modified or deleted by the M/I so that it 
is paradoxical to state that it is the owner of data.  I recommend not 
shall  not  suspend  the  provision  of  any 
adopted by the European Commission to 
to refer to the ownership of data and only regulate the access and 
Service  or  other  obligations  under  this 
determine the technical standards for the 
the prohibition to modify or delete them.  It could be included in the 
Agreement. 
recording,  transmitting,  processing  and 
provision on confidentiality and data protection. 
storing of data and access to stored data. 
Commented [everis90R89]: Support to draft this regulation 
8.7.  If  any  amount,  in  the  absence  of  a 
on access an prohibition to modify data would be much appreciated. 
dispute, is not paid on the due date, and 
10.2. The Manufacturer/Importer has the 
Commented 
In which case ? related to 8.5.? 
remains  unpaid  for  a  period  of  15  days 
ownership  of  provided  data  and  the 
after receipt by Manufacturer/Importer of 
results of any processing of that data. The 
a  written  reminder  from  the  Contractor 
Manufacturer/Importer  shall  not  be 
sent 
by 
registered 
mail, 
entitled to modify or delete the recorded 
Manufacturer/Importer shall pay interest 
data. 
Commented [LM91]: This is more related to the access rights, I 
at a rate of 3% per annum calculated on 
would move it to the section where this issue is addressed. 
a daily basis as from the due date. 
10.3. The  Contractor  does not retain in 
Commented [ET92R91]: See comment above.  
any  way  any  data  or  copies  of  provided 
8.8.  Contractor  acknowledges  that 
data  longer  than  necessary  for  the 
Commented [CG78]: An article about suspension of the 
payment  by  Manufacturer/Importer  of 
performance  of  the  Agreement.  Upon 
contract (not termination) is to be added. 
any  invoice  due  will  not  be  deemed  to 
request  by  the  Manufacturer/Importer, 
Commented 
Please refer to the penalties of directive 
constitute acceptance of the Services and 
the  European  Commission,  or  the 
2011/07 on late payments.  Suspension of services should also be 
limited. 
is 
without 
prejudice 
to 
any 
competent  authorities,  the  Contractor 
representations  or  warranties  made  by 
shall  delivers  a  certificate  executed  by 
the Contractor.  he prices, the procedures 
one  of  its  duly  authorised  officers, 
Commented 
Not necessary here. 
for  billing  and  payment  with  respect  to 
confirming 
compliance 
with 
the 
Commented 
General rule should be included here, 
the  Service  are  indicated  in  Annex  B  to 
destruction obligations. 
including payment term, possible penalty in case of late payment (cf. 
the STS “PC”. 
directive 2011/7).  Is it allowed to suspend the service in case of late 
10.4. The above provisions apply without 
payment (this point should be regulated) ? 
9. Location and subcontracting 
prejudice  to  any  of  the  Contractor´s 
Commented
 Location in the EU territory should be 
obligations in connection with termination 
mentioned.  Should it also be a UE provider? 
9.1.  The  Contractor’s  facilities  providing 
following Section 16 “Data portability”. 
the Service are located on the territory of 
the European Union. In the case that the 
11. Intellectual Property Rights
Commented 
Please add, for clarity purposes, that data 
borders  of  the  European  Union  change 
storage facilities are also included and must be located on the UE 
during  the  execution  of  the  Service,  the 
territory. 
2017 
10 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
11.1. Unless otherwise expressly agreed 
entire  duration  of  protection  of  the  IPR, 
elsewhere in this Agreement:  
irrevocable and worldwide license to use 
the Pre-existing IIPR of Contractor, if and 
(i) no  Intellectual  Property  Rights  are
to  the  extent  necessary  or  useful  to 
intended to be transferred as a result of 
benefit from the Service provided and to 
this  Agreement  and  nothing  in  this 
use the system, for any purpose; for the 
Agreement 
will 
result 
in 
avoidance  of  doubt,  this  shall  include  in 
Manufacturer/Importer having any right, 
particular,  without  being  limited  to,  the 
title,  licence  to  or  interest  in  any  Pre-
right  to  execute,  display,  install,  test, 
existing IPR of the Contractor in respect 
reproduce, 
distribute, 
sub-licence, 
of  which  all  rights  are  hereby  expressly 
modify, maintain, enhance, commercially 
reserved, and 
exploit and create derivative works of, to 
grant sublicenses to third parties and to 
(ii) all right, title and interest in relation
further develop the Pre-existing IPR (and 
to  the  Newly  Developed  IPR  shall 
any  third  party  IPR  incorporated  or 
Commented 
Is it going to occur? 
automatically 
be 
assigned 
to 
delivered by Contractor: 
Manufacturer/Importer on payment of the 
applicable charges in respect of the same 
- contained in the system;
with  the  Contractor  executing  such 
documents as are necessary to give effect 
-
otherwise
delivered 
to 
to such assignment. The assignment will 
Manufacturer/Importer by the Contractor 
be  valid  for  the  whole  duration  of  the 
or  required  to  use,  maintain  or  develop 
protection  and  for  the  territory  of 
the system; and 
[country of Manufacturer/Importer].  
-
to
permit 
such 
use 
by 
11.2.  Licence  of  Pre-existing  IPR: 
Manufacturer/Importer. 
Manufacturer/Importer  grants  to  the 
Contractor,  as  of  the  effective  date,  a 
12. Auditing
Commented 
To be completed : When? Who? Object of 
non-exclusive, 
royalty-free, 
sub-
the audit? What will occur in the case of non-compliance? Could it 
licensable, 
non-transferrable 
and 
12.1.  The  Contractor  shall  grant  to  the 
be asked by the Commission? 
worldwide licence to use the Pre-existing 
European  Commission,  the  competent 
IPR  of  Manufacturer/Importer  for  the 
authorities of the Member States and any 
duration  and  exclusive  purpose  of  its 
external  auditor  appointed  by  the 
performance  under  this  Agreement. 
Commission  access  to  the  Contractor 
Contractor may user the Pre-existing IPR 
facilities  and  all  locations  that  are 
of  Manufacturer/Importer  as  provided 
otherwise relevant to this Agreement and 
herein, but has no obligation to do so. If 
will  provide  reasonable  support  as 
Contractor  uses  Pre-existing  IPR  of 
required  during  the  Term  of  this 
Manufacturer/Importer,  the  Contractor 
Agreement  in  order  to  undertake  the 
shall  be  responsible  for  verifying  and 
following  actions  in  relation  to  the 
ensuring that: 
Services  and  Contractor’s  obligations 
under this Agreement: 
(i) such Pre-existing IPR is fit for purpose,
and 
(i)
access  to  the  build  and  test
environments of the Contractor to verify 
(ii) none  of  the  license  types  or  terms
compliance  with  Contractor’s  obligations 
applicable  to  such  Pre-existing  IPR  (if 
under this Agreement; 
any),  as  provided  to  Contractor,  restrict 
Contractor’s ability to transfer ownership 
(ii) verification  of  Contractor  compliance
and/or grant the licenses to Pre-existing 
with legal and regulatory requirements; 
IPR  and  Newly  Developed  IPR  (as  the 
(iii) verification  of  the  accuracy  of  the
case  may  be)  as  provided  in  this 
charges in connection with the Services, 
Agreement.  
and  any  other  amounts  payable  or 
11.3.  Contractor  hereby  grants  to 
receivable  by  manufacturer/importer 
Manufacturer/Importer, 
as 
of 
the 
under this Agreement; 
effective  date,  a  non-exclusive,  royalty-
(iv) verification  that  the  Contractor’s
free, sub licensable, transferrable, for the 
systems protect the integrity, operational 
2017 
11 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
availability  and  security  of  data  and 
14.2. 
Indirect 
damages: 
without 
Commented 
No limitation of liability in case of wilful 
Confidential Information; and 
prejudice to the article of this Agreement, 
misconduct or gross negligence. 
neither Party shall be liable for all claims, 
(v) verification that the Services are being
proceedings,  damages,  expenses,  costs 
provided, and Contractor’s obligations are 
and  losses  that  are  indirect  or 
being  met,  in  accordance  with  this 
consequential, 
including 
without 
Agreement.  
limitation  loss  of  profit,  loss  of 
opportunity,  loss  of  nosiness,  loss  of 
12.2.  If  a  material  non-compliance  is 
reputations,  loss  of  savings,  loss  of 
found  in  relation  to  any  of  the  matters 
clientele,  loss  of  data  relating  to  the 
which  were  audited  in  accordance  with 
Contractor,  and loss  of  goodwill,  as well 
this article, the Contractor shall bear the 
as  third  parties’  claims  (“Indirect 
full 
costs 
incurred 
by 
Damages”),  whether  based  on  a 
Manufacturer/Importer  for  the  audit, 
contractual 
breach, 
tort 
(include 
inspecting  and/or  monitoring  where  the 
negligence),  breach  of  statutory  duty, 
error or non-compliance was found. 
hidden  or  latent  defect,  or  otherwise, 
Commented 
Check conformity with 15(8), al.2, stating 
that external auditor is paid by the tobacco manufacturers. 
The  compliance  of  the  Service  with  this 
regardless of whether the damages were 
Agreement and the Directive is monitored 
foreseeable, arising out of, in connection 
by an external auditor proposed and paid 
with  its  participation  in  the  Services 
by  the  Manufacturer/Importer  and 
and/or  performance  of  its  obligations 
approved by the European Commission. 
under this Agreement. 
11.2.  The  external  auditor  submits  an 
It is expressly agreed that the limitation 
annual 
report 
to 
the 
competent 
of liability for Indirect Damages stipulated 
authorities 
and 
to 
the 
European 
under this article does not cover a loss of, 
Commission,  assessing  in  particular  any 
damage  to,  or  any  third  party  claims 
irregularities in relation to access to data 
arising 
out 
of, 
or 
relating 
to, 
stored in the performance of the Service. 
manufacturer/importer data. 
Commented 
Too broad.  Will never be accepted by 
the market.  Reference could be made to article 6 or 7 for instance. 
13.
Obligations
of 
the 
14.3.  Liability  cap:  Contractor’s  liability 
Commented 
To be completed.  Data to be provided? 
Manufacturer/Importer
arising  out  of,  in  connection  with  its 
When? Etc. + Structure : just after the provision related to the 
participation  in  the  Services  and/or 
obligation of the Contractor 
13.1. 
The 
Manufacturer/Importer 
performance of its obligations under this 
provides  all  the  contributions  regarding 
Agreement shall be limited to an amount 
the provision, implementation and testing 
equal to one hundred and twenty five per 
of the Service as expressly defined in the 
cent (125%) of the total charges that are 
Annex 1 “Technical Requirements”. 
due to the Contractor in one calendar year 
Commented 
Not clear.  To be completed or deleted. 
under this Agreement. 
13. Delays and penalties
Without 
prejudice 
to 
13.1.  The  Contractor  shall  notify  the 
Manufacturer/Importer’s  obligation  to 
Manufacturer/Importer any delays in the 
pay  charges  properly  due,  the  total 
provision of the service. 
aggregate 
liability 
of 
Commented 
To be included in main duties 
Manufacturer/Importer arising out of or in 
14. Liability
connection with this Agreement, whether 
Commented 
To be reviewed and completed.  What are 
in contract, tort (including negligence) or 
the limitations of liability (indirect damages? CAP?).  Some damages 
14.1.  Direct  damages:  the  Contractor 
breach  of  statutory  duty  or  otherwise, 
could be excluded from the limitation (breach of confidentiality or 
shall be liable for and shall hold harmless, 
howsoever arising, shall be limited to one 
data protection rules, for instance). 
defend 
and 
indemnify 
hundred thousand Euros (100.000 EUR). 
Commented 
Cap must be determined on a case by 
Manufacturer/Importer from  and  against 
case basis.  Realistic to include it in a model contract? 
any  direct  damages  arising  out  of  or 
The Contractor is liable to compensate the 
relating  to  its  performance  under  this 
Manufacturer/Importer for all damage or 
Agreement whether based on an action or 
expenses it incurs as a result of a culpable 
claim,  in  contract,  equity,  negligence, 
breach  of  the  Agreement  by  the 
Commented 
What does it mean? Recommended to 
tort, or otherwise, for all events, acts or 
Contractor. 
refer to material breach. 
omissions.  
14.2.  Save  Section  13  “Delays  and 
penalties”,  the  amount  due  by  the 
2017 
12 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
Contractor for default of the Agreement is 
Majeure Event, the non-performing Party 
defined in the relevant STS. 
shall be excused from the performance of 
its obligations pursuant to this Agreement 
14.3.  The  Contractor  is  not  responsible 
affected  by  the  Force  Majeure  Event  for 
for loss of profits, loss of earnings or for 
as long as (1) such Force Majeure Event 
any  other  form  of  loss  of  profit  or 
continues and (2) such Party continues to 
damage, delays or malfunctions however 
use  its  best  efforts  to  recommence 
derived from the provision of the Service 
performance  whenever  and  to  whatever 
which  depend  on  events  beyond  the 
extent possible without delay. 
reasonable control of the Contractor such 
as, for example: 
15.3.  The  Party  delayed  by  a  Force 
Majeure  Event  shall  immediately  notify 
a) force majeure events;
the other Party by telephone or any other 
Commented 
To be defined. 
pre-agreed warning (to be confirmed in a 
b) events dependent on the acts of third
notice  within  1  day  of  the  inception  of 
parties  such  as,  but  not  limited  to,  the 
such delay) of the occurrence of a Force 
interruption 
or 
malfunction 
of 
Majeure Event and describe in reasonable 
telecommunication  lines  and/or  electric 
detail  the  nature  of  the  Force  Majeure 
power networks; 
Event. 
c) malfunction  of  the  terminals  or  other
15.4.  Manufacturer/Importer  will  be 
communications  systems  used  by  the 
entitled  to  cease  payment  of  the  price 
Manufacturer/Importer  or  improper  use 
and/or to recover from the Contractor any 
of  the  same  and/or  the  procedures  for 
of the charges already paid in connection 
access 
to 
the 
service 
by 
the 
with  the  defaulting  services  until  the 
Manufacturer/Importer or third parties. 
recovery  of  from  such  Force  Majeure 
15. Force Majeure
Event has been completed and in so doing 
may 
perform 
any 
act 
that 
Commented 
Probably too many details. 
15.1.  “Force  Majeure  Event”  means  an 
Manufacturer/Importer 
deems 
Commented 
I suggest not to define the concept but 
occurrence  or  circumstance,  other  than 
reasonably necessary in order to restore 
refer, in this model contract, to the meaning in accordance with the 
financial, beyond a Party’s control, which 
the Services or procure the Services from 
applicable law.  
was  unforeseeable  on  the  effective  date 
an alternate source. 
and  which  such  Party  cannot  avoid, 
including but not limited to an act of God, 
15.5. If such Force Majeure Event causes 
fire,  flood,  storm,  revolution,  act  of 
delay in performance for more than thirty 
terrorism,  riot,  war  or  civil  commotion 
(30) days,  then  the  Party  not  suffering
(but  excluding  strikes  and  industrial 
the  Force  Majeure  Event  may  terminate 
disputes  of  the  affected  Party),  any 
this 
Agreement, 
without 
cost, 
failures of power or other utilities, surplus 
compensation  or  indemnity,  effective 
or shortage of, or any delay in or inability 
upon written notice to the other Party. 
to  procure  or  remove,  any  labour, 
15.6. The occurrence of a Force Majeure 
materials, equipment or supplies. 
Event  does  not  limit  or  otherwise  affect 
Commented 
Not clear 
15.2.  Any  failure  or  delay  by  the 
Contractor’s  obligation  to  provide  either 
Manufacturer/Importer or the Contractor 
normal business continuation procedures 
in  the  performance  of  their  obligations 
and/or to ensure full compliance with the 
pursuant to this Agreement due to a Force 
Business 
Continuity 
Plan 
for 
the 
Majeure  Event  shall  not  be  deemed  a 
continuation of business. 
breach of this Agreement of a ground for 
15.7.  Forthwith  upon  the  Force  Majeure 
termination 
hereunder 
(expect 
as 
Event ceasing to exist, the Party  relying 
provided  hereunder)  provided  that  such 
upon the Force Majeure Event shall give 
failure  or  delay  could  not  have  been 
written  advice  to  the  other  Party  of  this 
possibly  prevented  and  cannot  possible 
fact  and  resume  performance  of  the 
be  circumvented  by  the  non-performing 
affected obligations. 
Party  through  the  use  of  alternate 
sources,  workaround  plans,  or  other 
16Insurance and guarantee
means.  Upon  the  occurrence  of  a  Force 
Commented
 I suggest to delete because issues could 
occur when articulating this rule with the definition. 
2017 
13 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
16.1. The Contractor provides evidence of 
165.2. The Contractor shall have no right 
an  insurance  to  Manufacturer/Importer 
of  retention  with  respect  to  any  data, 
against all insurable risks of damage, loss 
information  and/or  other  necessary 
or injury caused by the Contractor in the 
material  to  be  delivered  to  the  next 
execution of the Agreement including any 
Contractor and allow full data portability 
act  by  its  personnel  or  by  any  person 
in accordance with this Section 16 “Data 
acting on the Contractor's behalf for the 
portability”. 
performance of the Agreement.  
17. Termination
Commented
 Not clear.  Distinction must be made 
16.2 The insurance is the type customary 
between termination for cause and termination for convenience 
for  the  industry  sector  in  which  the 
17.1.  Termination  for  cause  by  the 
(and we recommend not to allow termination for convenience in the 
Contractor  operates  and  shall  include 
Manufacturer/Importer: 
without 
present case).  Reference should be made to material breach (and 
not to serious cause).  Insolvency should also be mentioned, being 
insurance  cover  for  professional  and 
prejudice  to  any  right  or  remedy 
agreed that it is not a breach as such.  Duties after termination must 
corporate liability, providing  cover for at 
Manufacturer/Importer may have against 
be mentioned (ref. to exit plan). 
least  the  amount  defined  in  the  STS.  In 
the  Contractor  for  breach  or  non-
Commented 
What about termination for cause by the 
any  case,  the  minimum  amounts 
performance 
of 
this 
Agreement, 
Contractor? Suggestion to add another clause or to apply this 
stipulated 
shall 
not 
prevent 
the 
Manufacturer/Importer  may  terminate 
provision to both Parties. 
Contractor  from  complying  with  the 
this  Agreement  for  cause,  without  prior 
obligation  to  insure  itself  for  higher 
intervention  of  a  court  or  arbitral  body 
amounts, where such would be the case, 
and  without  any  financial  liability  to  the 
as  provided  in  statutory  provisions. 
Contractor at any time on notice in writing 
Furthermore,  the  amounts  of  insurance 
to  the  Contractor  immediately  or 
stipulated shall in no way limit or diminish 
forthwith following such notice period as 
the  obligation  of  the  Contractor  to 
described below if: 
compensate  the  Manufacturer/Importer 
for damage incurred.  
(i) Contractor commits a material breach
of any of its obligations or the terms and 
15.3. The Contractor provides at his own 
conditions  set  out  in  this  Agreement, 
expense, as security for due performance 
provided  that  where  such  breach  is 
of the Agreement, including the obligation 
capable  of  remedy,  Contractor  has  been 
to pay a contractual penalty, a guarantee 
notified in writing of the breach and has 
for the amount to be secured, issued by 
not remedied it within thirty (30) days of 
an  established  credit  institute  of  good 
receipt of such notice; 
standing registered the European Union. 
The  guarantee  must  in  all  cases  be 
(ii) any of the representations, warranties
directly 
enforceable, 
unconditional, 
and undertakings given by the Contractor 
irrevocable and issued for the duration of 
have become materially inaccurate during 
obligations set forth in the Agreement and 
the term of the Agreement; 
according to the applicable law. 
(iii) following an independent review by a
16.4.  At  the  Contractor's  request,  the 
qualified external party that Contractor is 
Manufacturer/Importer  returns  to  the 
not, or will not be, able to complete the 
former  or  the  guarantor  any  guarantee 
Services 
within 
the 
timescale 
deeds  provided  to  it  as  soon  as  it  is 
contemplated in this Agreement, 
established 
that 
the 
(iv) Contractor is in material breach and
Manufacturer/Importer  can  no  longer 
fails to remedy the material breach within 
invoke  any  of  the  rights  secured  by  the 
thirty (30) days. 
guarantee. 
(v) Contractor  is  in  breach  of  its
165. Data portability
obligations  relating  to  confidentiality, 
Commented 
To be reviewed and completed.  An 
“exit” plan must be established (information duties before to 
165.1. The Contractor delivers to the next 
security and/or Data Protection 
terminate ; format ; price, collaboration duty, timeline, choice of the 
Contractor with an up to  date backup of 
next Contractor, etc.).    
(vi) Contractor or any staff are in breach
the data stored in the performance of the 
of any anti-corruption laws; 
Service.  Any  updates  to  data  after  this 
delivery and any additional data received 
(vii) Manufacturer/Importer exercises its
or created shall be migrated to the next 
right  to  terminate  all  or  part  of  the 
Contractor without undue delay. 
2017 
14 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
Agreement under article X (“Price, billing 
18. Termination Assistance, Data and
and payments”); and/or; 
knowledge transfer 
Commented [CG112]: Not aligned with Art. 7 Pricing: there is 
no longer a reason for terminating the contract due to non-
(viii) as a result of a fault or negligence
18.1.  Following  notice  of  termination  of 
payment.  I would remove this paragraph. 
on  behalf  of  Contractor,  Contractor  is 
this  Agreement  for  any  reason,  the 
refused  or  has  revoked  any  official  or 
Contractor  shall  provide  termination 
regulatory  licence,  authorisation  or 
assistance  as  is  reasonably  required  for 
permission necessary for the performance 
such  period  of  time  as  is  reasonable  in 
of  its  obligations  hereunder  and  such 
order  to  provide  for  an  orderly 
breach is not cured within one (1) month 
disengagement  and  (where  applicable) 
notice. 
seamless 
transition 
to 
the 
next 
Commented 
Is it applicable here? 
Contractor. 
17.2.  Termination  by  Contractor:  if 
Manufacturer/Importer  fails  to  pay  any 
18.2.  Contractor  shall  perform  the 
undisputed  charges  exceeding  three  (3) 
termination assistance services described 
months  of  all  charges  under  the 
in  this  Agreement.  In  particular,  the 
Agreement  within  the  time  provided  for 
Contractor shall: 
by  this  Agreement,  Contractor  may  give 
Manufacturer/Importer  notice  of  its 
(i) transfer  the  services,  the  system
intention  to  terminate  this  Agreement  if 
and/or  work  products  to  the  next 
payment is not received within thirty (30) 
Contractor in a reasonable time frame; 
days of that notice.  
(ii)
assist
with  the  handover  of 
The Parties may terminate the Agreement 
operational  responsibility  to  the  next 
following the instructions provided in the 
Contractor. 
relevant STS. 
Commented 

18.3.  The  Contractor  will  provide  an 
To be regulated in the GTC. 
17.2.  If  the  Manufacturer/Importer  has 
interim and a final Termination Assistance 
serious  cause,  it  may  terminate  the 
Plan  following  the  guidelines  of  this 
Commented 
 Not clear.  Distinction must be made 
Agreement  in  writing  without  advance 
Agreement. Within sixty (60) days of the 
between termination for cause and termination for convenience 
notice.  There  is  serious  cause,  in 
notice  of  termination  of  the  Agreement, 
(and we recommend not to allow termination for convenience in the 
particular, where: 
the  Contractor  will  deliver  an  initial 
present case).  Reference should be made to material breach (and 
Termination  Assistance  Plan  to  the 
not to serious cause).  Insolvency should also be mentioned, being 
agreed that it is not a breach as such.  Duties after termination must 
(a)
the
Contractor's 
financial 
European Commission for its review and 
be mentioned (ref. to exit plan). 
circumstances  deteriorate  to  such  an 
feedback. 
Commented [LM116]: This provision is too unclear, allowing for 
extent  that  due  performance  of  the 
the possibility to terminate the contract in case of "serious causes" is 
Agreement can no longer be expected; 
18.4. Providing data: on written request 
too vague.  
during the Termination Assistance Period, 
Commented [ET117R116]: 
(b)
the  Contractor  becomes,  or  is  at
the 
Contractor 
will 
provide 
data 
The cases of “serious causes” are 
described hereinafter. 
risk  of  becoming,  insolvent  or  is  over-
regarding: 
indebted; 
(i)
Consumption  and  utilisation  of
(c)
the
opening 
of 
insolvency 
resources 
proceedings  or  comparable  statutory 
proceedings 
with 
respect 
to 
the 
(ii) Business process procedures and work
Contractor's  assets  is  refused  owing  to 
flow 
lack  of  funds  or  the  Contractor  finds 
himself  in  a  comparable  situation  under 
(iii)
Business  process  volumes  and
the  laws  of  the  country  in  which  he  is 
statistics 
Commented [LM118]: For the purpose of the tracking and 
domiciled; 
tracing system, I don't think it is beneficial to allow an immediate 
(iv) Business process training modules
termination of the agreement 
17.3.  The  Manufacturer/Importer  shall 
Commented [ET119R118]: Please pay attention following 
(v) Performance histories
immediately  terminate  the  Agreement  if 
sentence. Immediate termination of the agreement by the 
notified by the European Commission that 
manufacturer/importer is allowed only “ if notified by the European 
(vi) Then  current  and  projected  work
Commission that the Contractor no longer meets the necessary 
the  Contractor  no  longer  meets  the 
volumes 
requirements with respect to independency and technical capacities 
necessary  requirements  with  respect  to 
set forth in the Directive”.  
independency and technical capacities set 
(vii) Any other data reasonably requested
forth in the Directive. 
In this situation, the Agreement would need to be terminated 
by  the  European  Commission  about  the 
immediately. As the European Commission is not a party to the 
Agreement, it has to be terminated by the manufacturer/importer.  
2017 
15 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
services  as  necessary  for  the  next 
Contractor  to  assume  responsibility  for 
continued performance of the services. 
19.
Amendments
to 
GTS 
and 
STSAgreement
18.5. Contractor will provide for a transfer 
of  knowledge  about  the  services  and 
19.1 Pursuant to Article 15(8) and (10) of 
related topics (which may be specified in 
the  Directive,  Parties  do  not  have  the 
the  Termination  Assistance  Plan)  to 
right  to  amend  the  GTS  and  STSthis 
facilitate  the  provision  of  replacement 
Agreement.  The  European  Commission 
services by the next Contractor. This will 
reserves the right to regularly monitoring 
include: 
and  evaluating  modifications  to  the  GTS 
and  STSAgreement  by  means  of 
(i) participate  in  workshops,  meetings,
delegated acts in accordance with Article 
and 
“hands-on” 
activities 
where 
27 of the Directive.  
requested by the European Commission; 
20. Applicable law and disputes
Commented 
It should be the Law and the Jurisdiction 
(ii) Provide  the  next  Contractor  with
of a Member State.  The Agreement could also include an out-of-
information  about  the  services  that  are 
21.1. The Agreement is governed by the 
court resolution process (arbitration or mediation) and an escalation 
necessary to implement the Termination 
law of ______________. 
process (first refer to project managers and then higher and then 
higher, with compulsory timeline).    
Assistance Plan; and, 
20.1. In the event of Aany dispute arising 
Commented [everis123R122]: Modified. Dispute resolution 
(iii) Provide  the  next  Contractor  with
out  of,  or  in  connection  with,  this 
procedure included SUBJECT TO the approval of the Governance 
Model by the EC.  
information  about  the  services  as 
Agreement,  each  Party  agrees,  without 
necessary  for  the  next  Contractor  to 
prejudice  to  the  right  of  each  Party  to 
assume  responsibility  for  continued 
immediately  seek  any  interim  or  final 
performance of the services in an orderly 
remedy  before  the  court  as  set  forth  in 
manner  so  as  to  minimize  disruption  to 
20.4, to attempt in good faith to resolve 
the operations; 
the  dispute  amicable  and  speedily  by 
referring such dispute by written notice: 
18.6.  The  Contractor  will  deliver  to  the 
next Contractor with an up to date backup 
i) first to the Service Delivery Committee,
of the data stored in the performance of 
who shall meet and endeavour to resolve 
the Service. Any updates to data after this 
the  dispute  between  them  within  fifteen 
delivery and any additional data received 
(15) business days of such notice,
or created shall be migrated to the next 
Contractor without undue delay. 
ii) failing resolution of the dispute, to the
Management Committee, who shall meet 
18.7. The Contractor shall have no right 
and  endeavour  to  resolve  the  dispute 
of  retention  with  respect  to  any  data, 
between  them  within  ten  (10)  business 
information  and/or  other  necessary 
days  of  such  notice.  The  joint  written 
material  to  be  delivered  to  the  next 
decision  of  the  Management  Committee 
Contractor and allow full data portability 
shall be binding on the Parties, and; 
in accordance with this Agreement. 
iii) failing  resolution  of  dispute,  to  the
18. Structure of the Agreement
Executive  Steering  Committee  who  shall 
meet  and  endeavour  to  resolve  the 
18.1 The present Agreement consists of: 
dispute between them within fifteen (15) 
business  days  of  such  notice.  The  joint 
Commented [LM120]: This is too complicated. For the purpose 
- General Terms of Service (GTS)
written decision of the Executive Steering 
of drafting a model contract you should simply the structure, ideally 
to one single document 
Committee  shall  be  binding  on  the 
- Annex  1  to  the  GTS  “Technical
Parties. 
Commented [ET121R120]: We have reviewed this matter 
Requirements” 
with our external legal advisors and this is the most common and 
accepted standard for cloud storing agreements. In comparison with 
20.2. If the Service Delivery Committee, 
- Special Terms of Service (STS)
other model contracts of this nature, this is the most simple that it 
the  Management  Committee  and  the 
can already get. 
- Annex A to the STS “SLA”
Executive Steering Committee are unable 
to  resolve  the  dispute,  the  dispute 
We suggest to keep this structure and discuss it with the external 
expert(s) during the review.  
- Annex B to the STS “PC”
resolution shall  be considered  at  an  end 
as  regards  the  dispute  at  stake,  unless 
Commented 
]: 
the Parties agree to refer the matters  in 
Parties should be able to amend this 
process in accordance with their own practice. 
2017 
16 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
dispute  to  a  non-binding  arbitration, 
in  the  light  of  its  object  and  purpose  of 
expert’s  assessment,  or  mediation,  in 
the Directive.  
which  case,  the  dispute  resolution 
procedure shall be considered at an end 
On behalf of the Contractor: 
should  the  findings  or  recommendations 
Name (written in full): 
resulting  from  such  additional  non-
Position: 
binding  procedure  are  not  acceptable  to 
Address: 
both Parties.  
Signature………………………………………. 
(stamp of organisation) 
20.3. In either party does not agree with 
On 
behalf 
of 
the 
any 
dispute 
being 
referred 
for 
Manufacturer/Importer: 
determination  in  accordance  with  sub-
Name (written in full): 
article  20.1,  then  the  dispute  shall  be 
Position: 
determined  by  the  [UE  country  of 
Address: 
Manufacturer/Importer] 
courts 
in 
Signature………………………………………. 
accordance with the following sub-article. 
(stamp of organisation) 
20.4.  The  construction,  validity  an 
performance  of  this  Agreement  and  all 
non-contractual  obligations  arising  from 
or connected with this Agreement shall be 
governed 
by, 
and 
construed 
in 
accordance with, the Laws of [UE country 
of  Manufacturer/Importer]  and  any 
dispute arising out of this Agreement shall 
be subject to the exclusive jurisdiction of 
the  courts  of  [courts  of  the  seat  of  the 
Manufacturer/Importer]  to  which  both 
Parties 
hereby 
agree 
to 
submit 
irrevocably for these purposes. 
 between  the  Parties  resulting  from  the 
interpretation  or  application  of  the 
Agreement  which  cannot  be  settled 
amicably  shall  be  brought  before  the 
courts of ______________. 
21. Miscellaneous 
Commented 
Add a clause for consistency issues 
between the documents. 
21.1  The  Agreement  constitutes  the 
entire  agreement  between  the  Parties. 
There  are  no  oral  agreements  or 
understandings.  Any  amendment  or 
addition  to  the  Agreement,  where 
possible, must be in writing. Any waiver 
of the requirement of written form  must 
likewise be in writing. 
21.2  Should a clause of the Agreement 
be  or  become  invalid,  the  remainder  of 
the  Agreement  remains  in  force.  The 
invalid clause must be replaced by a valid 
clause  coming  closest  to  achieving  the 
object and purpose of the invalid clause. 
21.3  If  the  Agreement  contains  any 
gaps or ambiguities, it is to be interpreted 
2017 
17 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 
Page 18  was entirely deleted as it falls outside the scope of the request

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
8.2. Special Terms of Services - Primary Data Storage 
Special Terms of Service (“STS”) 
- Primary Data Storage –
Commented 
To be included in the GTC or in a specific 
work order. 
Reference Number ___[…]___ 
Service 
Primary Data Storage means the independent Primary Data Storage solution, 
hosting data exclusively related to a specific Manufacturer/Importer or a group of 
distinct Manufacturer(s)/Importer(s). 
The Service shall include making available to the Manufacturer/Importer a 
development and a test environment for the Service in accordance with the 
Commented [LM127]: This is really not clear. Please define 
requirements and for the purposes described in the Annex 1 to GTS “Technical 
better what the contractor should do 
Requirements”. 
Commented [ET128R127]: The specific tasks and technical 
specifications are to be defined in the Technical Annex for each of 
Terms, renewal  The Service shall be provided for a period of X (X) years from the signature of the 
the services (primary DS and surveillance DS). This is a common 
and termination  contract. 
practice in cloud storing agreements. The technicalities and 
specifications of this kind of storages are too complex to be included 
The Initial Contract Period may be extended, at the exclusive option of the 
in the body  of the Agreement itself.  
Manufacturer/Importer, by X (X) further periods of X (X) year each ("Extension 
Period
"), upon the Manufacturer/Importer giving written notice to the Contractor 
As WP3 (“Technical Specifications”) has not been finalised yet, the 
at least X (X) months before the end of the Initial Contract Period or the 
Annex 1 to GTS “Technical Requirements” has not been drafted yet.  
subsequent Extension Period. 
Option: The Manufacturer/Importer may terminate at any time the Agreement, 
without the need to state reasons, by serving a 90 (ninety)-day written notice to 
the Contractor. 
Liability 
The Contractor’s liability according to Section 14 “Liability” of the GTS shall be 
limited to an amount of EUR XXXX (in words: XXXX Euros) per event, whereby a 
single event shall be considered present in the case of a sequence of connected 
events (occurrences), and to an amount of EUR XXXX (in words: XXXX Euros) per 
calendar year in the case of multiple events. 
Insurance 
The insurance according to Section 15 “Insurance and guarantee” of the GTS shall 
include insurance cover for professional and corporate liability and will provide 
cover for at least EUR XXXX (in words: XXXX Euros) per event, with the maximum 
annual cover of at least XXX% (XXXX) of this amount. 
Contractual 
Where performance of the Service is delayed, the Contractor is liable to pay a 
Commented 
What does it mean? In the case of data 
penalty 
contractual penalty at a rate of 0.2% per working day of such delay but subject to 
storage, it is not really a delay issue.  
a maximum of 5% of the net price of the delayed part of the Service. 
2017 
19 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 
Page 20 was entirely deleted as it falls outside the scope of the request 

Implementation analysis of a EU system for traceability and security features of tobacco products 
Interim Report III 
ANNEX A 1 – SERVICE LEVEL AGREEMENT (“SLA”) 
Commented 
To be completed. 
1. Availability and performance of the Service
1.1 
The Service must be operational and fully functional at all times. 
In the event that the Service does not meet the requirement referred to in the previous 
sentence, the Contractor shall compensate the Manufacturer/Importer.  
1.2 
Should the Contractor claim that the non-availability of the Service is caused by 
circumstances beyond the Contractor’s control, the Contractor shall not be liable to pay 
liquidated damages, provided that the Contractor provides evidence of such circumstances. 
1.3 
The  Contractor  shall  cooperate  with  any  reasonable  request  by  the 
Manufacturer/Importer to improve its performance on a structural basis such as, but not 
limited to, the Contractor applying more resources and/or revising its procedures and/or 
involving the Manufacturer/Importer more closely in problem solving operations, where it 
has been established that the Contractor does not meet on a regular basis the requirements 
and/or Service Levels set out in this Agreement. In this respect, the Contractor shall also 
cooperate  with  any  analysis  of  the  causes  of  non-compliance  requested  by  the 
Manufacturer/Importer  and  shall  allow  the  Manufacturer/Importer  to  perform  such 
analyses. 
2. Support
2.1 
The Contractor makes available to the Manufacturer/Importer a telephone and/or 
e-mail hotline service for providing support, which is available on all working days (from
___day_____to day___) in the following working hours (from ____h to ____h).
3. Data portability
3.1 
During the latest 60 (sixty) days before the expiry/termination of this Agreement 
(according to Section 3 of the STS), at no additional costs to the Manufacturer/Importer, 
the Contractor shall deliver to the next contractor indicated by the Manufacturer/Importer 
a complete and up-to-date version of the data stored. Any updates to these data after this 
delivery  and  any  additional  data  received  or  created  shall  be  migrated  to  the  next 
contractor without undue delay. 
2017 
21 
Consumers, Health, Agriculture and Food Executive Agency 
Health Programme 