detailed information on possible duration of the later plant commissioning stages.
Nevertheless, to estimate the durations of the individual commissioning activities, the real dates
of major commissioning milestones of other recently completed VVER NPPs have been
compared to the planned dates for BelNPP in the Table 2. The relatively short intervals
between the first criticality and the first grid connection at Tianwan 2, Kalinin 4 and Rostov 3
may indicate either a reduced scope of start-up test usual at the VVER-reactors or a quick
power increase to a level eligible for a grid connection and subsequent return to zero power
level tests.
As an example of actual VVER plant commissioning activities, a detailed list of tests as
performed in the zero-power and power-ascension stage of the
- commissioning has been provided in the Annex 4. It should be noted that most
stages of the power ascension test period included periods of reactor hot or cold shutdowns
Art. 4(2) first indent
{into modes 3-6) to perform plant s stem inspections, revisions or eliminate problems.
In any case, the actual duration of the commissioning period at the BelNPP will depend on the
actual composition of the commissioning programme and number of parameters tested. In
general, the commissioning phase can be expected to be longer at the BelNPP 1 being kind of
a pilot one.
A direct comparison of the commissioning milestones has been performed in the Table 2 below:
Table 2
Plant
Fuel
First
Connection to the Commercial
loaded
criticality
grid
Operation
Be/NPP 1
April 2018
May 2018 (+1 m)
Dec 2018 (+ 8 m)
Novovoronezh 11/1
04/04/2016 20/05/2016
June 2016
(+1
m)[26)
Leningrad 1111
End
of May2017
January 2018
2016")
Art.4(2) first indent
Tianwan-1
Dec 2005
May 2006 (+ 5 m)
May 2007 {+ 17 m)
Tainwan-2
May 2007
May 2007 {+ 2 Aug 2007 (+ 3 m)
weeks)
Kalinin-4
Nov 2011
Nov 2011 (+ 2 Dec 2012 (+ 14 m)
weeks)
Kudankulam-1
July 2013
Oct 2013 (+ 3 m)
Dec 2014 (+ 17 m)
Rostov
Dec 2014
Dec 2014 (+ 3 Sept 2015 (+ 10
(Volgodonsk)-3
weeks)
m)
planned dates
Page 8 of 17
MGR equipment installation started
15.1.2016
LNNP 11/1 will start commercial operation In January 2018 29.1.12016
because of lower power demand
Main condensers mounted to the LP turbines
4.3.2016
Reactor building construction finishes
14.3.2016
Dieselgenerators (made in Finland) delivered on-site
18.3.2016
Refuelling machine installed in the containment
20.3.2016
Construction workers on LNPP II site worried about low 23.3.2016
wages and refuse to work
Flushing of the main steam line started
15.4.2016
Filters of continuous primary coolant treatment system installed
18.4.2016
Installation of the containment pre-stressing system
27.4.2016
Cementing of the external containment dome finished
18.5.2016