Italian Power System 
Adequacy Conditions - Winter 2017-2018 


ISC – Uso Riservato 



Supply-demand balance evolution 
In recent years, the Italian Power System has faced a 
Evolution of the Thermal generation fleet 
significant  reduction  of  the  installed  conventional 
generation capacity
[GW] 
The  significant  amount  of  intermittent  (e.g.  wind  and 
 
PV)  generators  installed  does  not  provide  a 
mal
reliable contribution to the adequacy (e.g. during the 
er
h

77 
75 
72 
67 
62 
61 
T
evening, where PV infeed is absent). 
Anyhow, for the first time since 2011, there is no year-
on-year  net  reduction  in  the  available  generation 
2012 
2013 
2014 
2015 
2016 
2017 
capacity. Nevertheless, as showed in January 17, this 
capacity  is  inadequate  to  cover  demand  in  severe 
Evolution of peak load and adequacy margins  
conditions without import. 
[GW] 
peak load 
margins 
 
Adequacy  margins  remain  uncomfortable  and  in 
20 
60 
severe  weather  condition  (cold  spell/heat  wave),  Italy 
needs  to  import  to  cover  his  load  and  to  guarantee 
22 
operational reserve requirements 
10 
55 



50 
2011 
2012 
2013 
2014 
2015 
2016 
2017 

ISC – Uso Riservato 




Winter Outlook 2017- 2018 
Italy security of supply  is not expected to be at  risk under 
In case of reduced available transmission capacities due to forced 
normal conditions
outages  of  interconnection  lines  the  possibility  to  cope  with  local 
necessity  using  external  generation  capacity  could  be  severely 
 
affected; 
Under  severe  weather  conditions  (cold  wave),  margins 
may  significantly  narrow  and,  especially  in  the  northern 
There  could  be  relevant  risks  for  the  adequacy  of  the  Italian 
part  of  the  country,  there  is  the  risk  of  not  being  able  to 
power system that are expected in the case of severe conditions. 
meet demand needs; 
 
 
Northern Italy bidding zones - remaining capacity  
[GW] 

ISC – Uso Riservato 







Countermeasures 
Action 
Benefits 
Cooperation on system adequacy and security at Regional level 
has been further strengthen and improved.  
Potential risks can be detected in advance 
RSCs update on a bi-weekly basis the adequacy outlook for the 
winter  in  order  to  fill  the  gap  between  seasonal  and  weekly 
adequacy assessment that consider one week at time. 
Some  thermoelectric  plants  have  been  requested  to  came 
back online from previous mothballing condition. 
Maintenance  plans  of  generation  units  and  grid  elements,  at 
national  and  regional  level,  have  been  optimized  in  order  to 
Available resources have been increased 
minimize risks for adequacy 
Procurement of additional Demand Side Response resources 
If, as in January 2017, concrete risk materializes Terna envisages the possibility to take additional emergency measures

ISC – Uso Riservato