Clima - rePower

Belen Balanya made this acceso a documentos request to Acción por el Clima

Automatic anti-spam measures are in place for this older request. Please let us know if a further response is expected or if you are having trouble responding.

La respuesta a esta solicitud está muy retrasada. Acción por el Clima ya debería haber respondido (detalles). Puedes apelar pidiendo una revisión interna.

To DG Clima

From: Belen Balanya, Corporate Europe Observatory
Rue d’Edimbourg 26, 1050 Brussels.
7 April 2022 RE: Access to Documents related rePower

Dear sirs,

Referring to Regulation (EC) No 1049/2001 on public access to EU documents and to the 'Aarhus Regulation', I would herewith like to ask for access to the following:

1- all correspondence (including email, SMS, private twitter and WhatsApp) since 1st February 2022 between Commissioner Timmermans, and/or his cabinet and/or officials from DG Clima with representatives from the oil and gas industry, energy industrial users, hydrogen and biomethane industry, trade groups and/or lobby/PR firms in which the EU’s response to Ukraine invasion, particularly the rePower communication was discussed.

2 - list of meetings since since since 1st February 2022 between Commissioner Timmermans, and/or his cabinet and/or officials from DG Clima with representatives from the oil and gas industry, energy industrial users, hydrogen and biomethane industry, trade groups and/or lobby/PR firms in which the EU’s response to Ukraine invasion, particularly the rePower communication was discussed.

3 - minutes of the meetings mentioned above

I would like to make clear I prefer you produce the documents on a rolling basis.
At no point should the Commission’s search for—or deliberations concerning—certain documents delay the production of others that the Commission has already retrieved and elected to produce.

To the extent possible, we prefer the documents in electronic format. Documents that cannot be sent in electronic format should be sent to Corporate Europe Observatory, Rue d’Edimbourg 26, 1050 Brussels.

Should my request be denied wholly or partially, please explain the denial or all deletions referring to specific exemptions in the regulation. Also I expect the partial release of documents, in case of partial exemption according to article 4.6.
I reserve the right to appeal.

Please confirm having received this application. I look forward to your reply within 15 business days, according to the regulation.

Thank you for your assistance.

Belen Balanya
Corporate Europe Observatory

SG ACCES DOCUMENTS, Acción por el Clima

1 Adjuntos

Link: [1]File-List
Link: [2]Edit-Time-Data
Link: [3]themeData
Link: [4]colorSchemeMapping

Dear Madam,

 

Thank you for your e-mail of 7 April 2022. We hereby acknowledge receipt
of your application for access to documents, which was registered on 11
April 2022 under reference numbers

 

-          GESTDEM 2022/2106: DG CLIMA

-          GESTDEM 2022/2108: SG

 

In accordance with Regulation (EC) No 1049/2001 regarding public access to
European Parliament, Council and Commission documents, your application
will be handled within 15 working days.

 

The time limit will expire on 5 May 2022. In case this time limit needs to
be extended, you will be informed in due course.

 

You have lodged your application via a private third-party website, which
has no link with any institution of the European Union.

Therefore, the European Commission cannot be held accountable for any
technical issues or problems linked to the use of this system.

 

Please note that the private third party running the AsktheEU.org website
is responsible and accountable for the processing of your personal data
via that website, and not the Commission.

For further information on your rights, please refer to the third party’s
privacy policy.

 

We understand that the third party running the AsktheEU.org website
usually publishes the content of applicants’ correspondence with the
Commission on that website. This includes the personal data that you may
have communicated to the Commission (e.g. your private postal address).

 

Similarly, the third party publishes on that website any reply that the
Commission will send to the email address of the applicants generated by
the AsktheEU.org website.

 

If you do not wish that your correspondence with the Commission is
published on a private third-party website such as AsktheEU.org, you can
provide us with an alternative, private e-mail address for further
correspondence. In that case, the Commission will send all future
electronic correspondence addressed to you only to that private address,
and it will use only that private address to reply to your request. You
should still remain responsible to inform the private third-party website
about this change of how you wish to communicate with, and receive a reply
from, the Commission.

 

For information on how we process your personal data visit our page
[5]Privacy statement – access to documents.

Yours faithfully,

 

 

ACCESS TO DOCUMENTS TEAM (GD)

 

[6]cid:image001.png@01D45409.F767C980

European Commission

Secretariat-General

SG C.1

[7][email address]

 

 

 

mostrar partes citadas

CLIMA ACCESS DOCUMENTS, Acción por el Clima

1 Adjuntos

Link: [1]File-List
Link: [2]Edit-Time-Data
Link: [3]themeData
Link: [4]colorSchemeMapping

[5]Your application for access to documents with ref GESTDEM 2022/2106 -
extension of deadline - Ares(2022)3365099  (Please use this link only if
you are an Ares user – Svp, utilisez ce lien exclusivement si vous êtes
un(e) utilisateur d’Ares)

Dear Ms Balanya,

 

We refer to your e-mail of  7 April 2022, in which you make a request for
access to documents, registered on 11 April 2022 under the above mentioned
reference number.

 

Your application is currently being handled. However, we will not be in a
position to complete the handling of your application within the time
limit of 15 working days, which expires on 5 May 2022.

 

An extended time limit is needed as part of the documents requested
originate from third parties, which have been consulted.

 

Therefore, we have to extend the time limit with 15 working days in
accordance with Article 7(3) of Regulation (EC) No 1049/2001 regarding
public access to documents. The new time limit expires on 31 May 2022.

 

We apologise for this delay and for any inconvenience this may cause.

 

Yours faithfully,

 

Access to Documents team

 

[6]cid:image001.png@01D5D50D.53131BB0

European Commission
Directorate-General Climate Action

 

References

Visible links
1. file:///tmp/cid:filelist.xml@01D85E16.5B0FE750
2. file:///tmp/cid:editdata.mso
3. file:///tmp/~~themedata~~
4. file:///tmp/~~colorschememapping~~
5. https://webgate.ec.testa.eu/Ares/documen...

SG UNITE D-2, Acción por el Clima

Link: [1]File-List
Link: [2]themeData
Link: [3]colorSchemeMapping

[4]Access to documents request - extension of the deadline - GESTDEM
2022/2108 - Ares(2022)3460550  (Please use this link only if you are an
Ares user – Svp, utilisez ce lien exclusivement si vous êtes un(e)
utilisateur d’Ares)

Dear Mrs Balanya

We refer to your request for access to documents registered on 11.04.2022
under the above mentioned reference number.

Your application is currently being handled.

 

However, we will not be in a position to complete the handling of your
application within the time limit of 15 working days, which expires today.

 

Therefore, we have to extend the time limit with 15 working days in
accordance with Article 7(3) of Regulation (EC) No 1049/2001 regarding
public access to documents.

 

The new time limit expires on 01.06.2022.

 

We thank you for your comprehension and apologise for this delay and for
any inconvenience this may cause.

 

Yours faithfully,

SG D2 Secretariat

 

 

References

Visible links
1. file:///tmp/cid:filelist.xml@01D86079.CF261B40
2. file:///tmp/~~themedata~~
3. file:///tmp/~~colorschememapping~~
4. https://webgate.ec.testa.eu/Ares/documen...

SG UNITE D-2, Acción por el Clima

Link: [1]File-List
Link: [2]themeData
Link: [3]colorSchemeMapping

[4]Access to documents request - reply to GESTDEM 2022/2108 - Reply under
preparation - Ares(2022)4117303  (Please use this link only if you are an
Ares user – Svp, utilisez ce lien exclusivement si vous êtes un(e)
utilisateur d’Ares)

Dear Mrs Balanya,

 

We refer to your request for access to documents registered on 11.04.2022
under the above mentioned reference number and to our extension of the
deadline email sent on 05.05.2022.

 

Your application is currently being handled.

However, we will not be in a position to complete the handling of your
application within the extended time limit.

 

Our colleagues make every effort to come back to you in the best delay
with the reply to your request.

 

We thank you for your comprehension and apologise for this delay and for
any inconvenience this may cause.

 

Yours faithfully,

SG D2 Secretariat

References

Visible links
1. file:///tmp/cid:filelist.xml@01D8769F.C6803C00
2. file:///tmp/~~themedata~~
3. file:///tmp/~~colorschememapping~~
4. https://webgate.ec.testa.eu/Ares/documen...

Dear SG UNITE D-2,

Thanks for your response. However only says "Our colleagues make every effort to come back to you in the best delay with the reply to your request."

Could you be more precise as to when will you disclose the documents?

Yours sincerely,

Belen Balanya

SG UNITE D-2, Acción por el Clima

9 Adjuntos

  • Attachment

    Reply GESTDEM 2108 rev VT.pdf

    296K Download View as HTML

  • Attachment

    1 Ares 2022 2568142 Minutes on the meeting with SustainablePublicAffairs Redacted.pdf

    412K Download View as HTML

  • Attachment

    2 Ares 2022 1853954 RE RePower EU Making the Energy Efficiency Goals a Reality Redacted.pdf

    625K Download View as HTML

  • Attachment

    3 1 Ares 2022 2209604 Heat pump manufacturers on REPowerEU Redacted.pdf

    177K Download View as HTML

  • Attachment

    3 2 Ares 2022 2209604 2021 12 03 EHI Heat Pump Report Final.pdf

    1.8M Download View as HTML

  • Attachment

    3 3 Ares 2022 2209604 20220324 EHI letter REPowerEU Redacted.pdf

    439K Download View as HTML

  • Attachment

    4 Ares 2022 3083330 Meeting Request Executive Vice President Frans Timmermans Assembly of European Regions Redacted.pdf

    105K Download View as HTML

  • Attachment

    5 1 Ares 2022 609428 SSAB meeting request Redacted.pdf

    96K Download View as HTML

  • Attachment

    5 2 Ares 2022 609428 SSAB views hydrogen and decarbonised gas package.pdf

    315K Download View as HTML

Dear Ms Balanya

We invite you to acknowledge good receipt of this email within 5 working days.

Best regards

SG.D2

CLIMA-ACCESS-DOCUMENTS@ec.europa.eu, Acción por el Clima

2 Adjuntos

Dear Ms Balanya,

 

Please find enclosed a copy of our reply.

 

We would appreciate if you could confirm receipt of the present e-mail by
replying to [email address].

 

With kind regards,

 

CLIMA Access to Documents

European Commission

Directorate-General Climate Action