ANNEX B – CONTRACTOR'S FINANCIAL OFFER AND WORK BREAKDOWN STRUCTURE
Request for Specific Services N° Chafea/2015/Health/40
for the implementation of Framework Contract DIGIT/R2/PO/2013/004 ABC III lot 2
"High level consultancy and studies"
[To be filled in by the contractor and annexed to his offer.]
Task
Workpackag
Deliverable/
Start
End Date
Planned Value (PV) in €
e
Activity (*)
Date
(DD/MM/
(cost of activities should be integrated into the
(DD/MM/
YYYY)
cost of relevant deliverables)
YYYY)
Profile
# Days
€/Day
Total in €
01
Subtotal
02
Subtotal
03
Subtotal
04
…
Subtotal
TOTAL
Date and place:
:
[signature]
(*) It is expected that every activity produces as least one deliverable and that the activity cost is
included in the cost of the corresponding deliverable, i.e. the cost for the material (electronic or
paper deliverable) produced for a presentation in a course of an event, should integrate the overall
cost for the content collection, material preparation and physical presentation. In the exceptional
case that some activities cannot be connected to any specific deliverable or task, they could still be
introduced in the pertinent column and be marked appropriately as “activity not linked to
deliverable” or "activity not linked to concrete tasks".
(**) The contractor may adapt this table, if necessary.