Measures at national level 
 

Optimization of maintenance planning of generation facilities and network 
elements (i.e. Tihange 1, Coo, Rodenhuize, PST Van Eyck) 
 

Speeding-up maintenance work on nuclear units, resulted in Doel 4 (1047 
MW) and Tihange 3 (1054 MW) coming back on-line. 
 

Facilitate market measures (e.g. permit granting) > 1200MW: 
-
Reintroduction in the market of existing units  
-
Installation of emergency generators  
-
Demand side management, including introduction new product for DSR 
-
Optimization of use of existing production park 
 ECG was regularly informed about the legislative actions taken in this context. 
 

Activation of Nemo-Link (BE-UK) foreseen for end January 2019 
 
 
http://economie.fgov.be 




Measures at national level 
 
 
 
http://economie.fgov.be 



Operational framework for regional solidarity (1/2) 
 
To ensure electricity adequacy in Belgium for the winter 2018-2019 
 
1. Optimal application of existing measures 
a)
Pay special attention to data quality in capacity calculation process 
b)
Apply seasonal thermal limits 
c)
Apply min-RAM framework 
 Compliance on the min RAM 20% obligation is good  
 
2. In case problematic situations are identified at D-3, TSOs shall integrate more flexibility for the 
coordinated use of phase shifting transformers. 
 Coordination with neighboring TSOs has been satisfactory when the use of extra taps on PSTs was 
needed  
 
3. Optimize the intraday capacity calculation process 
 Nothing specific to report 
 
 
 
 
 
http://economie.fgov.be 
 



Operational framework for regional solidarity (1/2) 
 
4. Put in place the Short and Medium Term Adequacy (SMTA) and Critical Grid Situation 
process (CGS) at the level of the Regional Security Coordinators. 
 CORESO and TSCNET have confirmed their cooperation in this process 
 
CONCLUSION : We are not in a position to assess the compliance of neighbours with each and every 
requirement but Belgium has not encountered any new Critical Grid Situation since our last meeting: 
• Mainly thanks to the mild weather so far 
• But also thanks to a good performance of the flow-based market coupling, which we think is due to 
a better compliance from all TSOs in the area. 
We thank all parties to this agreement for the efforts to comply. 
 
 BE will perform an evaluation of the functioning of the Operational Framework after 31 March 2019 
and communicate the results to the Standing Group & ECG. 
 
 
 
 
 
http://economie.fgov.be 



Winter Outlook 2018-2019 
 
Based on the following parameters and without prejudice to exceptional and unforeseen 
circumstances, we do not foresee an increased risk for the activation of the 
national load shedding plan during winter 2018-2019

Continuous improvement of the availability of the Belgian production park. 

Advanced availability of demand side measures. 

Weather patterns that are in line with historical data. 

Regional solidarity in line with the Operational Framework 

Coming online of Nemo-interconnector 
 