Ceci est une version HTML d'une pièce jointe de la demande d'accès à l'information 'Documents exchanged and presented within the framework of the Electricity Coordination Group (E02735).'.






Ref. Ares(2021)4296942 - 01/07/2021
ENTSO-E Transparency Platform 
ECG web conference – 16 October 2020 


Background 
Freely 
accessible 
and 
ENTSO-E to 
downloadable 
develop and 
data 
maintain the 
Transparency 
Platform (TP) 
543/2013 EU 
regulation 
@ENTSO-E Al  rights reserved  


TP Regulation 543/2013 Article 15 
Information relating to the unavailability of generation and production units 

a) the planned unavailability of 100 MW or more of a generation unit including changes of 100 MW or more in the 
planned unavailability of that generation unit, expected to last for at least one market time unit up to three years 
ahead, specifying 
b) changes of 100 MW or more in actual availability of a generation unit, expected to last for at least one market 
time unit, specifying  
• the name of the production unit, 
• the name of the generation unit, 
• location, 
• bidding zone, 
• installed generation capacity (MW), 
• the production type, 
• available capacity during the event, 
• reason for the unavailability, 
• start date and estimated end date (day, hour) of the change in availability 
c) and d) tackle production units which are the collection of generation units and introduce a 200 MW threshold  
@ENTSO-E Al  rights reserved  


TP data on planned and unplanned generation outages  
Detailed description 

Planned unavailability 
• Data is to be published one hour after the decision is made 
• Typically it is reported for future outages 
Unplanned (forced) unavailability 
• Data is to be published one hour after the decision is made in the changes of the availability of a unit 
• Typically it is reported for an outage started in the past and finishes in the future. 
This means planned unavailabilities that are already decided are published for the future on the TP. 
Data quality and completeness is solely the responsibility of the owner of the data and the data 
provider 
ACER receives the data on a daily basis in the frame of the REMIT regulation 
@ENTSO-E Al  rights reserved  



TP data  
Overview 

Time period filter 
Control area filter 
Data Export via 
API or via xls 
Timestamp (and 
update history) is 
available  
@ENTSO-E Al  rights reserved  



TP data 
Detailed view 

Nature: planned/forced outage 
Unit name included 
Installed & available MW (hourly/15mins 
resolution) during the outage 
Production type: fuel type 
@ENTSO-E Al  rights reserved  


@ENTSO-E Al  rights reserved