All the meetings and discussions with Solvay for automotive sector

La réponse à cette demande est très en retard Réseaux de communication, contenu et technologies aurait déjà dû répondre à la demande (détails). Vous pouvez vous plaindre en Solliciter une révision interne .

Francesca Cicculli

Dear Communications Networks, Content and Technology,

Under the right of access to documents in the EU treaties, as developed in Regulation 1049/2001, I am requesting documents which contain the following information:

For the period between 1 January 2018 to date:

- a list of the meeting and/or calls between Solvay SA and the Directorate-General for Communications Networks, Content and Technology, including any Cabinet Members and/or officials, during which “electric vehicles ” and/or “batteries” were discussed.

The list should include: date, individuals attending and organisational affiliation, as well as the issues discussed;

- all minutes and other reports of these meetings and/or calls;

- all documents prepared for the purpose of the meetings issued both in preparation and after the meetings took place.
- all correspondence, including attachments (i.e. any emails, mail correspondence or telephone call notes) between the Directorate-General for Communications Networks, Content and Technology and Solvay SA, including any Cabinet Members and/or officials, and any lobby group and/or industry representative discussing “electric vehicles ” and/or “batteries”.

To the extent possible, I prefer the documents in electronic format.
Should my request be denied wholly or partially, I kindly request to explain the denial or all redactions referring to specific exemptions in the regulation. Also I would expect the partial release of documents, in case of partial exemption according to article 4.6.

Please confirm receipt of this application. I look forward to receiving your reply within 15 business days, as established by the regulation.

Yours faithfully,

Francesca Cicculli

Investigative Reporting Project Italy
Viale Giulio Cesare, 92 - 00192 ROMA

SG ACCES DOCUMENTS, Réseaux de communication, contenu et technologies

Dear Madam,

We hereby acknowledge receipt of your application for access to documents,
which was registered on 03/11/2021 under reference number GESTDEM
2021/6540.

In accordance with Regulation (EC) No 1049/2001 regarding public access to
European Parliament, Council and Commission documents, your application
will be handled within 15 working days.

The time limit will expire on 24/11/2021. In case this time limit needs to
be extended, you will be informed in due course.

You have lodged your application via a private third-party website, which
has no link with any institution of the European Union.
Therefore, the European Commission cannot be held accountable for any
technical issues or problems linked to the use of this system.

Please note that the private third party running the AsktheEU.org website
is responsible and accountable for the processing of your personal data
via that website, and not the Commission.
For further information on your rights, please refer to the third party’s
privacy policy.

We understand that the third party running the AsktheEU.org website
usually publishes the content of applicants’ correspondence with the
Commission on that website. This includes the personal data that you may
have communicated to the Commission (e.g. your private postal address).

Similarly, the third party publishes on that website any reply that the
Commission will send to the email address of the applicants generated by
the AsktheEU.org website.

If you do not wish that your correspondence with the Commission is
published on a private third-party website such as AsktheEU.org, you can
provide us with an alternative, private e-mail address for further
correspondence. In that case, the Commission will send all future
electronic correspondence addressed to you only to that private address,
and it will use only that private address to reply to your request. You
should still remain responsible to inform the private third-party website
about this change of how you wish to communicate with, and receive a reply
from, the Commission.

For information on how we process your personal data visit our page
Privacy statement – access to documents.

Yours faithfully,

Access to documents team (rc)
SG.C.1
Transparency

Afficher les sections citées

CNECT-PUBLIC-ACCESS-TO-DOCUMENTS, Réseaux de communication, contenu et technologies

1 Attachment

Link: [1]File-List
Link: [2]Edit-Time-Data
Link: [3]themeData
Link: [4]colorSchemeMapping

[5]Holding reply - Your application for access to documents RefGestDem
2021/6540 - Ares(2021)7244088  (Please use this link only if you are an
Ares user – Svp, utilisez ce lien exclusivement si vous êtes un(e)
utilisateur d’Ares)

Dear Ms Cicculli,

 

We refer to your request for access to documents, registered under the
abovementioned reference number.

 

Your application is currently being handled. However, we will not be in a
position to complete the handling of your application within the time
limit of 15 working days, which expires today.

 

An extended time limit is needed as different services must be consulted.

 

Therefore, we have to extend the time limit with 15 working days in
accordance with Article 7(3) of Regulation (EC) No 1049/2001 regarding
public access to documents. The new time limit expires on 15 December
2021.

 

We apologise for this delay and for any inconvenience this may cause.

 

Yours sincerely,

 

DG CONNECT Access to Documents Team

 

 

European Commission

DG Connect – ACCESS TO DOCUMENTS

BU25 – Avenue de Beaulieu 25

B-1160 Brussels/Belgium

 

References

Visible links
1. file:///tmp/cid:filelist.xml@01D7E168.1185AAA0
2. file:///tmp/cid:editdata.mso
3. file:///tmp/~~themedata~~
4. file:///tmp/~~colorschememapping~~
5. https://webgate.ec.testa.eu/Ares/documen...