Lobby meetings with Fluxys, Enagás, SNAM, GRTgaz, GIE

The request was partially successful.

Dear Energy,

Under the right of access to documents in the EU treaties, as developed in Regulation 1049/2001, I am requesting documents which contain the following information:

- a list of all lobby meetings held between DG Energy and Fluxys, Enagás, SNAM, GRTgaz and/or Gas Infrastructure Europe, and/or their affiliates/representatives (e.g. lobby consultancies) since 1 January 2013. The list should include: date, Commission attendees, the name of the organisation(s) attending and a more precise meeting topic.

- minutes of all lobby meetings held between DG Energy and Fluxys, Enagás, SNAM, GRTgaz and/or Gas Infrastructure Europe, and/or their affiliates/representatives (e.g. lobby consultancies) since 1 January 2013.

- any correspondence between DG Energy and Fluxys, Enagás, SNAM, GRTgaz and/or Gas Infrastructure Europe, and/or their affiliates/representatives (e.g. lobby consultancies) since 1 January 2013. This should include but not be limited to correspondence related to the aforementioned meetings, as well as all other email and letter exchanges. It should also include all attachments and accompanying documents contained within the correspondence

My address is:
Corporate Europe Observatory
Mundo B
Rue d'Edimbourg 26
Bruxelles 1050

Yours faithfully,

Pascoe Sabido

1 Attachment

Dear Pascoe Sabido,
Thank you for your e-mail dated 21/06/2018.  We hereby acknowledge receipt
of your application for access to documents, which was registered on
22/06/2018 under reference number GestDem 2018/3410.
In accordance with Regulation (EC) No 1049/2001 regarding public access to
European Parliament, Council and Commission documents, your application
will be handled within 15 working days. The time limit will expire on
13/07/2018. In case this time limit needs to be extended, you will be
informed in due course.
You have lodged your application via the AsktheEU.org website. Please note
that this is a private website, which has no link with any institution of
the European Union. Therefore, the European Commission cannot be held
accountable for any technical issues or problems linked to the use of this
system.
Please note also that the European Commission is not responsible for any
possible processing of personal data by the private organisation running
the AsktheEU.org website, through which you have channelled your request.
Please refer to their privacy policy.
Best regards,
 
Gitte Louise Olsen
Access to documents team
 
European Commission
Secretariat-General
Unit B4 - Transparency
Office address BERL 05/315
+32 2 995 63 26
[1][email address]
 
 
 
 

show quoted sections

1 Attachment

Dear Mr Sabido,
We refer to your e-mail dated 21/06/2018 in which you make a request for
access to documents, registered on 22/06/2018 under the above mentioned
reference number.
Your application is currently being handled. However, we will not be in a
position to complete the handling of your application within the time
limit of 15 working days, which expires on 13/06/2018.
An extended time limit is needed for thorough analysis as to the
availability of the document requested.
Therefore, we have to extend the time limit with 15 working days in
accordance with Article 7(3) of Regulation (EC) No 1049/2001 regarding
public access to documents. The new time limit expires on 03/08/2018.
We apologise for this delay and for any inconvenience this may cause.
Yours faithfully,
 
 
European Commission
 
DG Energy
ENER ACCESS DOCUMENTS
Email: [1][email address]
 
 
 
 
 
 
 

References

Visible links
1. mailto:[email address]

Dear Energy,

By law, under all circumstances, you should have responded to my request by 03/08/2018.
Please respond immediately with documents collected to date, as well as an expectation as to when I can receive the rest of the documents.

Yours faithfully,

Pascoe Sabido

Dear Mr Sabido,

Thank you for your email.
As your request concerns a lot of documents and due to the summer period, we were unable to process it as requested.

However, a reply is in preparation and we will inform you as soon as possible when we will know when it could be sent.

Best regards,

European Commission
DG Energy
ENER ACCESS DOCUMENTS
Email: [email address]

show quoted sections

Dear Energy,

Please can you inform me of the status of this request. I've not seen the reply, which was supposed to be in preparation on 21 August.

Also, if you have found some documents already, please send them through, rather than waiting for all documents to be prepared.

Yours faithfully,

Pascoe Sabido

Dear Energy,

Please pass this on to the person who reviews confirmatory applications.

I am filing the following confirmatory application with regards to my access to documents request 'Lobby meetings with Fluxys, Enagás, SNAM, GRTgaz, GIE'.

You have not met your legal requirements in responding to my request. Nor have you responded to my follow-up message.

A full history of my request and all correspondence is available on the Internet at this address: https://www.asktheeu.org/en/request/lobb...

Yours faithfully,

Pascoe Sabido

EC ARES NOREPLY,

[1]Ares(2018)5028903 - RE: Internal review of access to documents request
- Lobby meetings with Fluxys, Enagás, SNAM, GRTgaz, GIE

Sent by ve_sg.accessdoc (SG) <[DG ENER request email]>. All responses have
to be sent to this email address.
Envoyé par ve_sg.accessdoc (SG) <[DG ENER request email]>. Toutes les
réponses doivent être effectuées à cette adresse électronique.

Dear Sir,

Thank you for your email dated 01/10/2018 by which you request, pursuant
to Regulation No 1049/2001 regarding public access to European Parliament,
Council and Commission documents, a review of the position taken by DG
ENER in reply to your initial application GESTDEM 2018/3410.

We hereby acknowledge receipt of your confirmatory application for access
to documents which was registered on 01/10/2018 (Ares(2018)5028838).

Your application will be handled within 15 working days (22/10/2018).  In
case this time limit needs to be extended, you will be informed in due
course.

Please be informed that the answer to your confirmatory application is a
formal Commission decision that will be notified to you by express
delivery. Thank you for having provided your contact phone number, so that
the external delivery service can contact you in case of absence.

Please note that the Commission will not use your phone number for any
other purpose than for informing the delivery service, and that it will
delete it immediately thereafter.

Yours faithfully,

Carlos Remis
SG.B.4.
Transparence.
Berl. 05/329.

show quoted sections

EC ARES NOREPLY,

78 Attachments

  • Attachment

    26 20160216 Press Release GIE Energy Security Package final.pdf

    383K View Download

  • Attachment

    21 R study on actual GHG data for diesel petrol kerosene and natural gas Redacted.pdf

    69K View Download

  • Attachment

    9 Ares 2015 245547 Subject Approval of Final Report for project Redacted.pdf

    62K View Download

  • Attachment

    26 20160216 Press release GIE Energy Security Package final email Redacted.pdf

    294K View Download

  • Attachment

    22 GIE response to consultation on LNG and storage strategy1.pdf

    720K View Download

  • Attachment

    43 RE ProjetG186 10 Redacted.pdf

    165K View Download

  • Attachment

    22 GIE response to consultation on LNG and storage strategy Redacted.pdf

    62K View Download

  • Attachment

    46 Communication on final payment decision c 2011 4894 for the action 2010 G186 10 ENER 10 ten e Redacted.pdf

    443K View Download

  • Attachment

    30 DG Ener GLNG Sept 15 final Redacted.pdf

    3.9M View Download

  • Attachment

    44 RE ProjetG186 10 Redacted.pdf

    343K View Download

  • Attachment

    29 behrest Scan 3906299614 111814 EC Redacted.pdf

    40K View Download

  • Attachment

    23 GSE follow up3.pdf

    415K View Download

  • Attachment

    5 Ares 2014 1896069 FLUXYS TENP PROJECT Redacted.pdf

    99K View Download

  • Attachment

    24 20151111 toolbox update 2015 v6 overview for DG ENER Redacted.pdf

    200K View Download

  • Attachment

    25 RE meeting 11h00 follow up telco on Friday at 11h15 Redacted.pdf

    105K View Download

  • Attachment

    62 Updated supervision strategy to RGs Redacted.pdf

    47K View Download

  • Attachment

    53 re internet publication of replies to consultation on revision of gas security of supply regulation Redacted.pdf

    177K View Download

  • Attachment

    28 steering group participation quo vadis EU gas market regulatory framework Redacted.pdf

    54K View Download

  • Attachment

    62 Follow up to the Southern Gas Corridor Regional Group meeting of 16 February 2017 Redacted.pdf

    806K View Download

  • Attachment

    61GRTgaz answer to strategy for LNG and storage1.pdf

    73K View Download

  • Attachment

    54 fw grt gas response to European Commissions consultation on the revision of regulation 994 2010 concerning measures to safeguard security of gas supply Redacted.pdf

    99K View Download

  • Attachment

    Letter from DR to Mr Sabido.pdf

    156K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR 6.pdf

    31K View Download

  • Attachment

    66 Synth se de l tude sur un mix gaz 100 pc renouvelable en 2050 Redacted.pdf

    71K View Download

  • Attachment

    3 consultation paper on sos revision 08 04 2015 email Redacted.pdf

    137K View Download

  • Attachment

    59 FINANCIAL AUDIT 2015 025 TEN E FR AND 2015 041 RRPR FR Redacted.pdf

    189K View Download

  • Attachment

    26 Meeting 11h00 follow up TelCo on Friday at 11h15 Redacted.pdf

    400K View Download

  • Attachment

    6 Ares 2014 3233553 FLUXYS Board of Directors tif Redacted.pdf

    56K View Download

  • Attachment

    27 GIE Security of Supply TF Redacted.pdf

    92K View Download

  • Attachment

    61 GRTgaz answer to strategy for LNG and storage Redacted.pdf

    61K View Download

  • Attachment

    14 Energy security stress tests3.pdf

    404K View Download

  • Attachment

    28 steering group participation quo vadis EU gas market regulatory framework1 Redacted.pdf

    55K View Download

  • Attachment

    15 REvision SoS Regulation GIE input Redacted.pdf

    57K View Download

  • Attachment

    29 EU energy legislative reforms Redacted.pdf

    111K View Download

  • Attachment

    13 Ares 2014 2458794 Letter to EU bodies and associations on the stress tests Redacted.pdf

    214K View Download

  • Attachment

    14 Energy scurity stress tests 2 Redacted.pdf

    62K View Download

  • Attachment

    14 Energy scurity stress tests 2 Redacted.pdf

    62K View Download

  • Attachment

    11 Convocation letter GCG 24 Sept pdf Redacted.pdf

    1.4M View Download

  • Attachment

    36 FW demande de modification report date de fin de la subvention EEPR 2009 INYg FR Redacted.pdf

    181K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR 5.pdf

    15K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR 4.pdf

    104K View Download

  • Attachment

    33 SFM GasNaturally 23Jun2015 pdf.pdf

    1.2M View Download

  • Attachment

    34 Meetings and documents ENER GasNaturally docx 1.pdf

    351K View Download

  • Attachment

    64 email rtf 9 Redacted.pdf

    205K View Download

  • Attachment

    64 contracts public procurements EEPR action to be filled by beneficiary f xlsx.pdf

    29K View Download

  • Attachment

    12 forum 2014 sur le gaz pour les Etats membres Redacted.pdf

    78K View Download

  • Attachment

    20 Study on actual GHG data for Diesel petrol Kerosene and Natural gas Redacted.pdf

    111K View Download

  • Attachment

    30 2015 09 17 Platts Gas Summit final UPD Redacted.pdf

    1.4M View Download

  • Attachment

    2 ENAGAS Presentation on CREs consultation on 2018 Redacted.pdf

    442K View Download

  • Attachment

    List of Documents GESTDEM2018 3410.pdf

    280K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR Redacted.pdf

    205K View Download

  • Attachment

    30 20150922 GCG workshop LNG storage strategy v7 For DG ENER Redacted.pdf

    2.1M View Download

  • Attachment

    17 Internet publication of replies to consultation on revision of Gas Security of Supply Regulation1 Redacted.pdf

    60K View Download

  • Attachment

    42 Interconnexion gaziere entre lEspagne et la France PR.pdf

    131K View Download

  • Attachment

    31 towards the Paris Agreement with Gas infrastructure.pdf

    709K View Download

  • Attachment

    17 Internet publication of replies to consultation on revision of Gas Security of Supply Regulation Redacted.pdf

    84K View Download

  • Attachment

    32 GasNaturally Heating Workshop Programme.pdf

    219K View Download

  • Attachment

    8 2015 025 DT SKA Consultation on the revision of EU Regulation 994 2010 Redacted.pdf

    47K View Download

  • Attachment

    7 Ares 2014 3517724 FLUXYS Board of Directors tif Redacted.pdf

    63K View Download

  • Attachment

    9 Ares 2015 245547 Note to Final Report Redacted.pdf

    29K View Download

  • Attachment

    21 R study on actual GHG data for diesel petrol kerosene and natural gas Redacted.pdf

    69K View Download

  • Attachment

    63 Ares 2017 941991 Follow up to the NSI West Gas Regional Group meeting of 15 February 2017 Redacted.pdf

    87K View Download

  • Attachment

    16 AGENDA 23 06 2015 14h30 Invitation to speak Gas Naturallys Member States Gas Forum Redacted.pdf

    154K View Download

  • Attachment

    4 20150408 Enagas comments EC PC SoS ext FINAL email Redacted.pdf

    64K View Download

  • Attachment

    63 Supervisins the deelopment of PCIs a shared responsibility Redacted.pdf

    48K View Download

  • Attachment

    16 AGENDA 23 06 2015 14h30 Invitation to speak Gas Naturallys Member States Gas Forum1 Redacted.pdf

    79K View Download

  • Attachment

    15 REvision SoS Regulation GIE input1.pdf

    546K View Download

  • Attachment

    23 GSE follow up Redacted.pdf

    64K View Download

  • Attachment

    22 GIE response to consultation on LNG and storage strategy1.pdf

    720K View Download

  • Attachment

    23 GSE follow up2.pdf

    635K View Download

  • Attachment

    38 Action n EEPR 2009 INTg FR INTERIM PAYMENT Redacted.pdf

    45K View Download

  • Attachment

    23 GSE follow up1.pdf

    637K View Download

  • Attachment

    10 Ares 2017 3516795 re NSI West meeting 27 04 working document Redacted.pdf

    259K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR 1.pdf

    29K View Download

  • Attachment

    1 FW ENAGAS Proposal for a Regional Workshop on the Iberian French German Gas Corridor Madrid 14 October Redacted.pdf

    153K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR 2.pdf

    123K View Download

  • Attachment

    65 EEPR 2009 INTg FR Final Technical Implemenatation Report FTIR 3.pdf

    133K View Download

  • Attachment

    30 Platts 170915 Br ssel final Redacted.pdf

    1.0M View Download

Please find attached document Ares(2018)5389783 regarding "[Re] GESTDEM 2018/3410 - Initial request" sent by Mr Dominique RISTORI on 19/10/2018.

-------------------------------------------------------------------------------------------------------------
Note: This e-mail was automatically generated by the European Commission's central mail registration system.
Replies by e-mail must be addressed to the original sender RISTORI Dominique (mailto:[email address]).
Remarque : Cet e-mail a été généré automatiquement par le système d'enregistrement central du courrier de la Commission européenne.
Toute réponse éventuelle par e-mail doit être adressée à l'expéditeur en personne, à savoir RISTORI Dominique (mailto:[email address]).

EC ARES NOREPLY,

[1]Ares(2018)5403813 - RE: Internal review of access to documents request
- Lobby meetings with Fluxys, Enagás, SNAM, GRTgaz, GIE

Sent by REMIS NICOLAS Carlos (SG) <[email address]>. All
responses have to be sent to this email address.
Envoyé par REMIS NICOLAS Carlos (SG) <[email address]>.
Toutes les réponses doivent être effectuées à cette adresse électronique.

Dear Mr Sabido,

I refer to your e-mail of 1 October 2018, by which you submitted a
confirmatory application in accordance with Article 7(2) of Regulation
(EC) No 1049/2001 regarding public access to European Parliament, Council
and Commission documents (‘Regulation 1049/2001’).

You submitted this confirmatory application because DG ENER did not
provide you with an initial reply within the deadlines provided for by
Regulation 1049/2001.

I note that in the meantime, namely on 19 October 2018, DG ENER provided
you with its initial reply. Consequently, your present confirmatory
application has been closed.

As indicated in DG ENER's initial reply, you are of course free to file a
new confirmatory application on the basis of this initial reply.

Best regards,

Carlos Remis
SG.C.1
Transparence
Berl. 05/315

show quoted sections