We don't know whether the most recent response to this request contains information or not – if you are Alessandro Runci please sign in and let everyone know.
Alessandro Runci

Dear Energy,

Under the right of access to documents in the EU treaties, as developed in Regulation 1049/2001, I am requesting documents which contain the following information:

- All correspondence - including attachments - between DG Energy and third-parties, in which the topic of the EU Methane Regulation was mentioned or disccussed. I am interested in correspondence between 2023 and today.

By third-parties, I refer to stakeholders that are not part of the European Commission (e.g. private companies, consultancies, trade groups, think-tanks, etc.).

Yours faithfully,

Alessandro Runci
via fausto pesci, 47, 00177, Rome, Italy

Sg-Acc-Doc@ec.europa.eu, Energy

Your message has been received by the Transparency Unit of the
Secretariat-General of the European Commission.
Requests for public access to documents are treated on the basis of
[1]Regulation (EC) No 1049/2001 of 30 May 2001 regarding public access to
European Parliament, Council and Commission documents.
The Secretariat-General will reply to your request within 15 working days
upon registration of your request and will duly inform you of the
registration of the request (or of any additional information to be
provided in view of its registration and/or treatment).
 
 
L’unité «Transparence» du secrétariat général de la Commission européenne
a bien reçu votre message.
Les demandes d’accès du public aux documents sont traitées sur la base du
[2]règlement (CE) n° 1049/2001 du 30 mai 2001 relatif à l’accès du public
aux documents du Parlement européen, du Conseil et de la Commission.
Le secrétariat général répondra à votre demande dans un délai de 15 jours
ouvrables à compter de la date d’enregistrement de votre demande, et vous
informera de cet enregistrement (ou vous indiquera toute information
supplémentaire à fournir en vue de l'enregistrement et/ou du traitement de
votre demande).
 
 
Ihre Nachricht ist beim Referat „Transparenz“ des Generalsekretariats der
Europäischen Kommission eingegangen.
Anträge auf Zugang zu Dokumenten werden auf der Grundlage der
[3]Verordnung (EG) Nr. 1049/2001 vom 30. Mai 2001 über den Zugang der
Öffentlichkeit zu Dokumenten des Europäischen Parlaments, des Rates und
der Kommission behandelt.
Das Generalsekretariat beantwortet Ihre Anfrage innerhalb von
15 Arbeitstagen nach deren Registrierung und wird Sie über die
Registrierung Ihres Antrags (oder die Notwendigkeit weiterer Informationen
im Hinblick auf dessen Registrierung und/oder Bearbeitung) unterrichten.
 
 

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...
2. https://eur-lex.europa.eu/legal-content/...
3. https://eur-lex.europa.eu/legal-content/...

sg-acc-doc@ec.europa.eu,

Dear Sir or Madam,

We hereby acknowledge the receipt of your request for access to documents
sent on 19/05/2025 and registered on 19/05/2025 under the case number
2025/2733.

We will handle your request within 15 working days as of the date of
registration. The time-limit expires on 11/06/2025. We will let you know
if we need to extend this time limit for additional 15 working days.

To find more information on how we process your personal data, please see
[1]the privacy statement.

Yours faithfully,

Secretariat-General - Access to Documents
European Commission

References

Visible links
1. https://ec.europa.eu/info/principles-and...

ENER-ACCES-DOCUMENTS@ec.europa.eu,

Dear Mr Rucci,

We are writing concerning your request for access to Commission documents
registered on 19/05/2025 under case number 2025/2733.

We are currently working on your request. However, we have not yet been
able to gather all the elements necessary to carry out a full analysis of
your request. We will not be able to send you the reply within the
prescribed time limit expiring on 11/06/2025.

The application concerns documents held by different Services, which must
be consulted.

Therefore, in line with Article 7(3) of [1]Regulation (EC) No 1049/2001,
we need to extend this time limit by 15 additional working days. The new
time limit expires on 02/07/2025.

We apologise for any inconvenience this may cause.

Kind regards,

DG ENER Access to Documents Team

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...

ENER-ACCES-DOCUMENTS@ec.europa.eu,

23 Attachments

  • Attachment

    Reply to initial request 25 2733.pdf

    630K View Download

  • Attachment

    Re NGOs Letter Methane Regulation.pdf

    154K View Download

  • Attachment

    Re Letter regarding the Methane Regulation and upcoming Energy Council Meeting.pdf

    263K View Download

  • Attachment

    2023 6249482 Re 2023 6249482 Environmental Defense Fund Europe on the ENVI ITRE joint report on the Methane Regulation.pdf

    129K View Download

  • Attachment

    Re Ares 2023 2878306 UvdL.pdf

    270K View Download

  • Attachment

    Ares 2023 2878306.pdf

    677K View Download

  • Attachment

    email.pdf

    1.9M View Download

  • Attachment

    Re Open letter methane emissions and energy contracts.pdf

    315K View Download

  • Attachment

    2023 CH4 emissions of petrochemical industry final.pdf

    411K View Download

  • Attachment

    email.pdf

    833K View Download

  • Attachment

    Methane in petrochemicals BREF WGC and LVOC 31082023.docx.pdf

    187K View Download

  • Attachment

    08.2023 Methane Emissions Gas mid and downstream recommendations.pdf

    655K View Download

  • Attachment

    email.pdf

    154K View Download

  • Attachment

    20231012 MDLs in EU Methane Regulation.docx.pdf

    259K View Download

  • Attachment

    email.pdf

    454K View Download

  • Attachment

    Annex GasNaturally recommendations on the EU Methane Regulation 1.pdf

    346K View Download

  • Attachment

    email.pdf

    523K View Download

  • Attachment

    email.pdf

    518K View Download

  • Attachment

    Re GasNaturally call for a proportionate efficient and implementable EU Methane emissions reduction Regulation.pdf

    132K View Download

  • Attachment

    Re NGOs open letter methane imports.pdf

    107K View Download

  • Attachment

    Re Proposed EU Methane Regulation International dimension of EU importer requirements.pdf

    147K View Download

  • Attachment

    email.pdf

    470K View Download

  • Attachment

    email.pdf

    309K View Download

Please find attached a message concerning your request for access to
Commission documents registered under the above case number 2025/2733.

Please acknowledge the receipt of this message by return email.

Kind regards,

ENER C2 unit support

ENER-ACCES-DOCUMENTS@ec.europa.eu,

19 Attachments

  • Attachment

    IOGP Europe s recommendations to Implementing Act Article 14 7.pdf

    1.5M View Download

  • Attachment

    FW Letter from Trade associations EU Methane Regulation concerns regarding importer requirements.pdf

    234K View Download

  • Attachment

    Trade associations letter EU Methane Regulation concerns regarding importer requirements.pdf

    205K View Download

  • Attachment

    Re EU Methane Regulation concerns regarding importer requirements.pdf

    291K View Download

  • Attachment

    20241004 IOGP Europe questions and clarification on importer requirements of the EU Methane Regulation.pdf

    253K View Download

  • Attachment

    email.pdf

    75K View Download

  • Attachment

    Trade associations letter EU Methane Regulation concerns regarding importer requirements 1.pdf

    265K View Download

  • Attachment

    email.pdf

    275K View Download

  • Attachment

    MiQ Letter EC DG Energy.pdf

    1.5M View Download

  • Attachment

    Re FW IOGP Europe recommendations for the Omnibus proposal.pdf

    126K View Download

  • Attachment

    Re EU Methane Regulations Certification.pdf

    161K View Download

  • Attachment

    Agenda.docx.pdf

    131K View Download

  • Attachment

    Briefing CLB.pdf

    1.5M View Download

  • Attachment

    Readout.pdf

    66K View Download

  • Attachment

    email.pdf

    605K View Download

  • Attachment

    Ext Programme CSDDD Workshop 29 January 2025 Brussels 2301.pdf

    321K View Download

  • Attachment

    IOGP Europe recommendations for the Omnibus proposal.pdf

    154K View Download

  • Attachment

    email.pdf

    68K View Download

  • Attachment

    Synopsis MMRV Proposal NP4SE AFREC.pdf

    860K View Download

Please find attached a message concerning your request for access to
Commission documents registered under the above case number 2025/2733.

Please acknowledge the receipt of this message by return email.

Kind regards,

ENER C2 unit support

ENER-UNIT-C2@ec.europa.eu, Energy

1 Attachment

  • Attachment

    IOGP Europe recommendations for the next mandate 2024 2029 3.pdf

    10.1M View Download

Dear Mr Runci,

 

Please find one of the documents (size too big to be sent together with
the other documents via email) , part of the disclosed documents concerned
by your request for access to document EASE 2025/2733.

 

Best regards,

 

ENER C2 unit support

Alessandro Runci

Dear Energy,

Thanks for addressing my request.

Please pass this on to the person who reviews confirmatory applications.

I am filing the following confirmatory application with regards to my access to documents request 'Methane regulation'.

In its response, DG Energy stated that:

"With regard to the above-mentioned documents, a complete disclosure is prevented by the
exception concerning the protection of privacy and the integrity of the individual outlined
in Article 4(1)(b) of Regulation (EC) No 1049/2001, because they contain the following
personal data:
- the names/initials and contact information of Commission staff members not
pertaining to the senior management;
- the names/initials and contact details of other natural persons"

I am not interested in obtaining personal data or information. However, with regards to one of the documents partially disclosed, significant redaction has been applied, including of parts of the documents that do not contain personal information protected by the above-mentioned exception.

Therefore, I am requesting that full disclosure of the following document is granted, except for those parts that actually contain persona information.

Document named/titled: Briefing CLB.pdf / Briefing for Dir. Lobillo Borrero EUMR kickoff call with US 4 March 2025, 16:00-17:30, Webex

Yours faithfully,

Alessandro Runci
via fausto pesci 47
[email address]

Sg-Acc-Doc@ec.europa.eu, Energy

Your message has been received by the Transparency Unit of the
Secretariat-General of the European Commission.
Requests for public access to documents are treated on the basis of
[1]Regulation (EC) No 1049/2001 of 30 May 2001 regarding public access to
European Parliament, Council and Commission documents.
The Secretariat-General will reply to your request within 15 working days
upon registration of your request and will duly inform you of the
registration of the request (or of any additional information to be
provided in view of its registration and/or treatment).
 
 
L’unité «Transparence» du secrétariat général de la Commission européenne
a bien reçu votre message.
Les demandes d’accès du public aux documents sont traitées sur la base du
[2]règlement (CE) n° 1049/2001 du 30 mai 2001 relatif à l’accès du public
aux documents du Parlement européen, du Conseil et de la Commission.
Le secrétariat général répondra à votre demande dans un délai de 15 jours
ouvrables à compter de la date d’enregistrement de votre demande, et vous
informera de cet enregistrement (ou vous indiquera toute information
supplémentaire à fournir en vue de l'enregistrement et/ou du traitement de
votre demande).
 
 
Ihre Nachricht ist beim Referat „Transparenz“ des Generalsekretariats der
Europäischen Kommission eingegangen.
Anträge auf Zugang zu Dokumenten werden auf der Grundlage der
[3]Verordnung (EG) Nr. 1049/2001 vom 30. Mai 2001 über den Zugang der
Öffentlichkeit zu Dokumenten des Europäischen Parlaments, des Rates und
der Kommission behandelt.
Das Generalsekretariat beantwortet Ihre Anfrage innerhalb von
15 Arbeitstagen nach deren Registrierung und wird Sie über die
Registrierung Ihres Antrags (oder die Notwendigkeit weiterer Informationen
im Hinblick auf dessen Registrierung und/oder Bearbeitung) unterrichten.
 
 

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...
2. https://eur-lex.europa.eu/legal-content/...
3. https://eur-lex.europa.eu/legal-content/...

sg-acc-doc@ec.europa.eu,

Dear Sir or Madam,

We hereby acknowledge the receipt of your confirmatory request for case
2025/2733, sent on 30/07/2025 and registered on 30/07/2025.

We will handle your confirmatory request within 15 working days as of the
date of registration. The time-limit expires on 21/08/2025. We will let
you know if we need to extend this time limit for additional 15 working
days.

Yours faithfully,

Secretariat-General - Access to Documents
European Commission

sg-acc-doc@ec.europa.eu,

Hello,

We are writing concerning your confirmatory requesta for access to
Commission documents for cases EASE 2025/2733 and EASE 2025/2734
registered on 30/07/2025.

We are currently working on your confirmatory requests. However, we have
not yet been able to gather all the elements necessary to carry out a full
analysis of your requests. We will not be able to send you the replies
within the prescribed time limit expiring on 21/08/2025.

Therefore, in line with Article 8(2) of [1]Regulation (EC) No 1049/2001 we
need to extend this time limit by 15 additional working days. The new time
limit expires on 11/09/2025.

We apologise for any inconvenience this may cause.

Kind regards,

Secretariat-General of the Commission

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...

sg-acc-doc@ec.europa.eu,

Hello,

We are writing concerning your confirmatory requesta for access to
Commission documents for cases EASE 2025/2733 and EASE 2025/2734
registered on 30/07/2025.

We are currently working on your confirmatory requests. However, we have
not yet been able to gather all the elements necessary to carry out a full
analysis of your requests. We will not be able to send you the replies
within the prescribed time limit expiring on 21/08/2025.

Therefore, in line with Article 8(2) of [1]Regulation (EC) No 1049/2001 we
need to extend this time limit by 15 additional working days. The new time
limit expires on 11/09/2025.

We apologise for any inconvenience this may cause.

Kind regards,

Secretariat-General of the Commission

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...

Dear Energy,

Your response to my request for an internal review is long overdue. Could you please action this swiftly in accordance to relevant regulations?

Yours faithfully,

Alessandro Runci

Sg-Acc-Doc@ec.europa.eu, Energy

Your message has been received by the Transparency Unit of the
Secretariat-General of the European Commission.
Requests for public access to documents are treated on the basis of
[1]Regulation (EC) No 1049/2001 of 30 May 2001 regarding public access to
European Parliament, Council and Commission documents.
The Secretariat-General will reply to your request within 15 working days
upon registration of your request and will duly inform you of the
registration of the request (or of any additional information to be
provided in view of its registration and/or treatment).
 
 
L’unité «Transparence» du secrétariat général de la Commission européenne
a bien reçu votre message.
Les demandes d’accès du public aux documents sont traitées sur la base du
[2]règlement (CE) n° 1049/2001 du 30 mai 2001 relatif à l’accès du public
aux documents du Parlement européen, du Conseil et de la Commission.
Le secrétariat général répondra à votre demande dans un délai de 15 jours
ouvrables à compter de la date d’enregistrement de votre demande, et vous
informera de cet enregistrement (ou vous indiquera toute information
supplémentaire à fournir en vue de l'enregistrement et/ou du traitement de
votre demande).
 
 
Ihre Nachricht ist beim Referat „Transparenz“ des Generalsekretariats der
Europäischen Kommission eingegangen.
Anträge auf Zugang zu Dokumenten werden auf der Grundlage der
[3]Verordnung (EG) Nr. 1049/2001 vom 30. Mai 2001 über den Zugang der
Öffentlichkeit zu Dokumenten des Europäischen Parlaments, des Rates und
der Kommission behandelt.
Das Generalsekretariat beantwortet Ihre Anfrage innerhalb von
15 Arbeitstagen nach deren Registrierung und wird Sie über die
Registrierung Ihres Antrags (oder die Notwendigkeit weiterer Informationen
im Hinblick auf dessen Registrierung und/oder Bearbeitung) unterrichten.
 
 

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...
2. https://eur-lex.europa.eu/legal-content/...
3. https://eur-lex.europa.eu/legal-content/...

sg-acc-doc@ec.europa.eu,

Dear Mr Runci,

Thank you for your message of 30/09/2025 concerning your confirmatory
applications for access to Commission documents in cases EASE 2025/2733
and EASE 2025/2734.

We acknowledge that we were not able to reply to your applications within
the extended time limit of 11/09/2025, for which we apologise. This delay
has been due to internal consultations with another Commission service
concerned by your applications, necessary to duly process the
applications. We would like to assure you that the processing of your
applications is well underway and that we are doing our utmost to provide
you with a reply in the coming weeks.

We thank you for your understanding and sincerely apologise for any
inconvenience the delay may cause.

With kind regards,

Secretariat-General of the Commission

Dear Energy,

Over 2,5 months have passed since I filed a confirmatory application concerning a single document and I am still waiting for your response. I consider this behaviour not aligned with the principles enshrined in the EU transparency regulation. When are you going to act on this?

Yours faithfully,

Alessandro Runci

SG ACCES DOCUMENTS, Energy

[1]FW: access to documents request - Methane regulation -
Ares(2025)8965677  (Please use this link only if you are an Ares user –
Svp, utilisez ce lien exclusivement si vous êtes un(e) utilisateur d’Ares)

Dear Mr Runci,

Thank you for your renewed inquiry concerning your confirmatory
applications for access to Commission documents in cases EASE 2025/2733
and EASE 2025/2734.

Please be assured that the processing of your applications is well
underway. Please note that the internal consultation with another
Commission service has now been concluded and a draft decision on your
confirmatory applications is currently in preparation. Once finalised, it
will be submitted for review to the Legal Service. Next, it will be
validated within the Secretariat-General before its formal adoption. We
estimate that this process may still take a few weeks to complete.

Once again, we thank you for your understanding and sincerely apologise
for any inconvenience this delay may cause.

With kind regards,

 Secretariat-General of the Commission - cr

show quoted sections

Dear SG ACCES DOCUMENTS,

It's been now 3,5 months since I filed this confirmatory application. Still no response.

Yours sincerely,

Alessandro Runci

Dear SG ACCES DOCUMENTS,

You have failed to provide a response to my confirmatory application within a reasonable time. This is a blatant violation of the relevant EU regulations.

Yours sincerely,

Alessandro Runci

Sg-Acc-Doc@ec.europa.eu, Energy

Your message has been received by the Transparency Unit of the
Secretariat-General of the European Commission.
Requests for public access to documents are treated on the basis of
[1]Regulation (EC) No 1049/2001 of 30 May 2001 regarding public access to
European Parliament, Council and Commission documents.
The Secretariat-General will reply to your request within 15 working days
upon registration of your request and will duly inform you of the
registration of the request (or of any additional information to be
provided in view of its registration and/or treatment).
 
 
L’unité «Transparence» du secrétariat général de la Commission européenne
a bien reçu votre message.
Les demandes d’accès du public aux documents sont traitées sur la base du
[2]règlement (CE) n° 1049/2001 du 30 mai 2001 relatif à l’accès du public
aux documents du Parlement européen, du Conseil et de la Commission.
Le secrétariat général répondra à votre demande dans un délai de 15 jours
ouvrables à compter de la date d’enregistrement de votre demande, et vous
informera de cet enregistrement (ou vous indiquera toute information
supplémentaire à fournir en vue de l'enregistrement et/ou du traitement de
votre demande).
 
 
Ihre Nachricht ist beim Referat „Transparenz“ des Generalsekretariats der
Europäischen Kommission eingegangen.
Anträge auf Zugang zu Dokumenten werden auf der Grundlage der
[3]Verordnung (EG) Nr. 1049/2001 vom 30. Mai 2001 über den Zugang der
Öffentlichkeit zu Dokumenten des Europäischen Parlaments, des Rates und
der Kommission behandelt.
Das Generalsekretariat beantwortet Ihre Anfrage innerhalb von
15 Arbeitstagen nach deren Registrierung und wird Sie über die
Registrierung Ihres Antrags (oder die Notwendigkeit weiterer Informationen
im Hinblick auf dessen Registrierung und/oder Bearbeitung) unterrichten.
 
 

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...
2. https://eur-lex.europa.eu/legal-content/...
3. https://eur-lex.europa.eu/legal-content/...

Dear Energy,

I will now proceed to escalate this with the Ombudsman.

Yours faithfully,

Alessandro Runci

Sg-Acc-Doc@ec.europa.eu, Energy

Your message has been received by the Transparency Unit of the
Secretariat-General of the European Commission.
Requests for public access to documents are treated on the basis of
[1]Regulation (EC) No 1049/2001 of 30 May 2001 regarding public access to
European Parliament, Council and Commission documents.
The Secretariat-General will reply to your request within 15 working days
upon registration of your request and will duly inform you of the
registration of the request (or of any additional information to be
provided in view of its registration and/or treatment).
 
 
L’unité «Transparence» du secrétariat général de la Commission européenne
a bien reçu votre message.
Les demandes d’accès du public aux documents sont traitées sur la base du
[2]règlement (CE) n° 1049/2001 du 30 mai 2001 relatif à l’accès du public
aux documents du Parlement européen, du Conseil et de la Commission.
Le secrétariat général répondra à votre demande dans un délai de 15 jours
ouvrables à compter de la date d’enregistrement de votre demande, et vous
informera de cet enregistrement (ou vous indiquera toute information
supplémentaire à fournir en vue de l'enregistrement et/ou du traitement de
votre demande).
 
 
Ihre Nachricht ist beim Referat „Transparenz“ des Generalsekretariats der
Europäischen Kommission eingegangen.
Anträge auf Zugang zu Dokumenten werden auf der Grundlage der
[3]Verordnung (EG) Nr. 1049/2001 vom 30. Mai 2001 über den Zugang der
Öffentlichkeit zu Dokumenten des Europäischen Parlaments, des Rates und
der Kommission behandelt.
Das Generalsekretariat beantwortet Ihre Anfrage innerhalb von
15 Arbeitstagen nach deren Registrierung und wird Sie über die
Registrierung Ihres Antrags (oder die Notwendigkeit weiterer Informationen
im Hinblick auf dessen Registrierung und/oder Bearbeitung) unterrichten.
 
 

References

Visible links
1. https://eur-lex.europa.eu/legal-content/...
2. https://eur-lex.europa.eu/legal-content/...
3. https://eur-lex.europa.eu/legal-content/...