link to page 2 link to page 4 link to page 6 link to page 8 link to page 8 link to page 8 link to page 9 link to page 10 link to page 10 link to page 11 link to page 12 link to page 13 link to page 14 link to page 15 link to page 16 link to page 17 link to page 19 link to page 20 link to page 21 link to page 21
Ref. Ares(2023)8851266 - 22/12/2023
ANNEX II - General Conditions for Contribution Agreements
Article 1: Definitions ................................................................................................... 2
Article 2: General obligations ..................................................................................... 4
Article 3: Obligations regarding information and reporting ....................................... 6
Article 4: Liability towards third parties ..................................................................... 8
Article 5: Conflict of interests ..................................................................................... 8
Article 6: Confidentiality ............................................................................................ 8
Article 7: Visibility ...................................................................................................... 9
Article 8: Right to use results and transfer of equipment .......................................... 10
Article 9: Monitoring and evaluation of the Action .................................................. 10
Article 10: Amendment to the Agreement ................................................................ 11
Article 11: Suspension .............................................................................................. 12
Article 12: Termination ............................................................................................. 13
Article 13: Applicable law and settlement of disputes .............................................. 14
Article 14: Recovery ................................................................................................. 15
Article 15: Archiving, access and financial checks ................................................... 16
Article 16: Eligibility of costs ................................................................................... 17
Article 17: Payments ................................................................................................. 19
Article 18: Final amount of the EU Contribution ..................................................... 20
Article 19: Financing not linked to costs .................................................................. 20
Article 20: Contracting and Early Detection and Exclusion System ........................ 21
Contribution Agreement June 2023
Annex II - General Conditions
Page 1
Article 1: Definitions
Action:
the cooperation programme or project partly or wholly financed by the EU,
which is carried out by the Organisation as described in Annex I. Where
reference is made to the Action or part of the Action financed by the EU
Contribution, this refers both (i) to activities exclusively financed by the EU
Contribution and (ii) to activities jointly co-financed by the EU.
Contractor:
a natural or legal person with whom a Procurement Contract has been signed.
Days:
calendar days.
Early Detection
and Exclusion System: a system set up by Regulation (EU, Euratom) No 2015/1929 of 28 October
2015 on the financial rules applicable to the general budget of the Union (OJ
L 286/1, 30.10.2015), which includes information on the early detection of
risks threatening the EU financial interests, on the cases of exclusion from EU
funding of legal and natural persons and on the cases of imposition of financial
penalties.
End Date:
the date by which the Agreement ends, i.e. the moment of the payment of
the
balance by the Contracting Authority in accordance with Article 17 or when
the Organisation repays any amounts paid in excess of the final amount due
pursuant to Article 18. If any of the Parties invokes a dispute settlement
procedure in accordance with Article 13, the End Date shall be postponed until
the completion of such procedure.
EU Financial
Regulation
Regulation (EU, Euratom) No. 2018/1046 of the European Parliament and of
the Council of 18 July 2018 on the financial rules applicable to the general
budget of the Union, amending Regulations (EU) No 1296/2013, (EU) No
1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013,
(EU) No 1316/2013, (EU) No 223/2014, (EU) No 283/2014, and Decision No
541/2014/EU and repealing Council Regulation (EC, Euratom) No 996/2012
(OJ L 193, 30.7.2018, p. 1).
Ex-ante
Pillar-Assessment:
an assessment of the systems, rules and procedures carried out in order to
check whether such entity demonstrates a level of protection of the EU
financial interests equivalent to that existing when the European Commission
implements the budget itself.
Final Beneficiary:
a natural or legal person ultimately benefitting from the Action.
Force Majeure:
any unforeseeable and exceptional situation or event beyond the Parties'
control which prevents either of them from fulfilling any of their obligations
under the Agreement, which may not be attributed to error or negligence on
either part (or on the part of the Grant Beneficiaries, Partners, Contractors,
agents or staff), and which could not have been avoided by the exercise of due
diligence. Defects in equipment or material or delays in making them available
cannot be invoked as force majeure, unless they stem directly from a relevant
case of force majeure. Labour disputes, strikes or financial problems of the
Organisation cannot be invoked as force majeure by the defaulting Party.
Grant:
a direct financial contribution by way of donation given by the Organisation
or a Partner to finance third parties activities, including sub-granting and
procurement for the implementation of these activities.
Contribution Agreement June 2023
Annex II - General Conditions
Page 2
Grant Beneficiary:
a natural or legal person to whom a Grant has been awarded.
Grave Professional
Misconduct:
any of:
a violation of applicable laws or regulations, in particular the
Organisation’s Regulations and Rules, or ethical standards of the
profession to which a person or entity belongs, including any conduct
leading to sexual or other exploitation or abuse, or
any wrongful conduct of a person or entity which has an impact on its
professional credibility where such conduct denotes wrongful intent or
gross negligence.
Impact:
the overall objective of the Action entailing positive and negative, primary and
secondary long-term effects produced by a development intervention, directly
or indirectly, intended or unintended.
Indicator:
the quantitative and/or qualitative factor or variable that provides a simple and
reliable means to measure progress in the achievement of the relevant Results
of the Action. An indicator must have an agreed baseline, target and source of
data.
Internal
Control System:
a process applicable at all levels of management designed to provide
reasonable assurance of achieving the following objectives:
a) effectiveness, efficiency and economy of operations;
b) reliability of reporting;
c) safeguarding of assets and information;
d) prevention, detection, correction and follow-up of fraud and irregularities;
e) adequate management of the risks relating to the legality and regularity of
the financial operations, taking into account the multiannual character of
programmes as well as the nature of the payments concerned.
International
Organisation:
an international public-sector organisation set up by international agreement
(including specialised agencies set up by such organisations), or an
organisation assimilated to international organisations in accordance with the
EU Financial Regulation.
Member State
Organisation:
an entity established in a Member State of the European Union as a public law
body or as a body governed by private law entrusted with a public service
mission and provided with adequate financial guarantees from the Member
State.
Multi-Donor Action:
an Action co-financed by the EU Contribution (whether or not earmarked) and
other donor(s).
Outcome:
the specific objective of the Action entailing the likely or achieved short-term
and medium-term effects of an Action’s Outputs. For non-EU external actions
“Outcomes” are synonymous of Results.
Output:
the products, capital goods and services which result from an Action’s
activities.
Partner:
an entity implementing part of the Action and being a party to the relevant
Contribution Agreement together with the Organisation.
Procurement Contract: a contract signed between the Contractor and either the Organisation or a
Partner under which the Contractor provides services, supplies or works.
Contribution Agreement June 2023
Annex II - General Conditions
Page 3
Regulations and Rules: regulations, rules, organisational directives, instructions and other parts of the
regulatory framework of the Organisation.
Result:
the Output, Outcome or Impact of an Action.
Sound Financial
Management:
a principle overarching the implementation of this Agreement, namely
economy, effectiveness and efficiency (including all aspects of internal
control). The principle of economy requires that resources used in the pursuit
of the implementation of the Action shall be made available in due time, in
appropriate quantity and quality and at the best price. The principle of
effectiveness concerns the attainment of the specific objectives and the
achievement of the intended results. The principle of efficiency concerns the
best relationship between resources employed and results achieved.
Article 2: General obligations
Implementation of the Action
2.1
The Organisation is responsible for the implementation of the Action described in Annex I,
regardless of whether the activities are performed by the Organisation itself, a Contractor or a
Grant Beneficiary. Both Parties will endeavour to strengthen their mutual contacts with a view
to foster the exchange of information throughout the implementation of the Action. To this end,
the Organisation and the Contracting Authority shall participate in coordination meetings and
other jointly organised common activities, and the Organisation shall invite the European
Commission to join any donor committee which may be set up in relation to the Action.
2.2
In the performance of the activities and subject to ad-hoc provisions stipulated in the Special
Conditions, if any, the Organisation shall apply its own rules and procedures, which have been
subject to the Ex-ante Pillar-Assessment, as regards:
a) internal control;
b) accounting system;
c) independent external audit;
d) exclusion from access to funding;
e) publication of information on recipients;
f) protection of personal data.
The Organisation may apply its own rules and procedures as regards the award and management
of Grants and/or Procurement Contracts only if and to the extent provided for by the Special
Conditions, including any ad hoc measures.
As regards the publication of information on recipients, the Organisation shall authorise the
publication of the website where it publishes the information referred to in Article 3.8 d) on the
European Commission’s website.
2.3
Where the Organisation has been fully or partially exempted, by the European Commission,
from undergoing the Ex-ante Pillar Assessment, it may apply its own rules and procedures in
the areas provided for under Article 2.2, subject to ad-hoc provisions stipulated in the Special
Conditions, if any.
2.4
The Organisation may use any Regulations and Rules which have not been subject to an Ex-ante
Pillar Assessment to the extent that these Regulations and Rules are not in conflict with the
provisions of this Agreement and with the rules and procedures which have been subject to the
Ex-ante Pillar-Assessment.
Contribution Agreement June 2023
Annex II - General Conditions
Page 4
Responsibility
2.5
The Organisation shall be responsible for the performance of the obligations under this
Agreement with a due degree of professional care and diligence, which means that it shall
apply the same level of duty and care which it applies in managing its own funds. The
Organisation shall respect the principles of Sound Financial Management, transparency, non-
discrimination and visibility of the European Union in the implementation of the Action.
2.6
The Organisation shall have full financial responsibility towards the Contracting Authority for
all funds, including those unduly paid to or incorrectly used by Contractors or Grant
Beneficiaries. The Organisation shall take measures to prevent, detect and correct irregularities
and fraud when implementing the Action. To this end, the Organisation shall carry out, in
accordance with the principle of proportionality and its positively assessed Regulations and
Rules, ex-ante and/or ex-post controls including, where appropriate, on-the-spot checks on
representative and/or risk-based samples of transactions, to ensure that the Action financed by
the EU Contribution is effectively carried out and implemented correctly. The Organisation
shall inform the European Commission and the Contracting Authority of irregularities and
fraud detected in the management of the EU Contribution and the measures taken. Where funds
have been unduly paid to or incorrectly used by Contractors or Grant Beneficiaries, the
Organisation shall take all applicable measures in accordance with its own Regulations and
Rules to recover those funds, including, where appropriate, by bringing legal proceedings and
by endeavouring to assign claims against its Contractors or Grant Beneficiaries to the
Contracting Authority or the European Commission. Where the Organisation has exhausted
such measures and the non-recovery is not the result of error or negligence on the part of the
Organisation, the Contracting Authority will consider the amounts that could not be recovered
from Contractors and/or Grant Beneficiaries as eligible costs.
Other obligations
2.7
The Organisation undertakes to ensure that the obligations stated in this Agreement under
Articles 2.9-Other obligations, 5-Conflict of interests, 7- Visibility, and Article 15-Archiving,
access and financial checks apply, where applicable, to all Contractors and Grant Beneficiaries.
In addition, the Organisation also undertakes to require Contractors and Grant Beneficiaries
to: (i) comply with the relevant national laws and regulations as regards protection of personal
data and (ii) ensure accurate and regular records and accounts.
2.8
The Organisation shall notify the Contracting Authority and the European Commission
without delay of any substantial change in the rules, procedures and systems applied in the
implementation of the Action. This obligation concerns in particular (i) substantial changes
affecting the Ex-ante Pillar Assessment undergone by the Organisation or affecting the rules
and procedures which have been assessed by the European Commission for the purpose of
granting an exemption from the obligation to undergo an Ex-ante Pillar Assessment, or (ii)
those that may affect the conditions for eligibility provided for in the applicable legal
instruments of the EU. The Parties shall use their best efforts to resolve amicably any issues
resulting from such changes. The Contracting Authority reserves the right to adopt or require
additional measures in response to such changes. In the event an agreement on such measures
or other solutions cannot be reached between the Parties, either Party may terminate the
Agreement in accordance with Article 12.3.
2.9
The Organisation shall promote the respect of human rights and respect applicable
environmental legislation including multilateral environmental agreements, as well as
internationally agreed core labour standards. The Organisation shall not support activities that
contribute to money laundering, terrorism financing, tax avoidance, tax fraud or tax evasion.
2.10
Where the European Commission is not the Contracting Authority, it shall not be a party to
this Agreement, with the consequence that rights and obligations are conferred upon it only
Contribution Agreement June 2023
Annex II - General Conditions
Page 5
where explicitly stated. This is without prejudice to the European Commission's role in
promoting a consistent interpretation of the terms of this Agreement.
Article 3: Obligations regarding information and reporting
General issues
3.1
The Organisation shall provide the Contracting Authority with full information on the
implementation of the Action. To that end, the Organisation shall include in Annex I a work
plan at least for the first year of the Implementation Period (or the whole Implementation
Period where it is less than one (1) year). The Organisation shall submit to the Contracting
Authority progress report(s) and a final report in accordance with the provisions below. These
reports shall consist of a narrative part and a financial part.
3.2
Every report, whether progress or final, shall provide a complete account of all relevant aspects
of the implementation of the Action for the period covered. The report shall describe the
implementation of the Action according to the activities envisaged in Annex I as well as the
degree of progress towards the achievement of its Results (Outputs, Outcomes and if possible,
Impact) as measured by corresponding Indicators. The report shall be drafted in such a way
as to allow monitoring of the Results, the means envisaged and employed. The level of detail
in any report shall match that of Annexes I and III.
3.3
Where the overall action of the Organisation lasts longer than the Implementation Period of
this Agreement, the Contracting Authority may request – in addition to the final reports to be
submitted pursuant to Article 3.8 - the final reports of the overall action, once available. The
Special Conditions shall lay down the rules concerning any remaining funds.
3.4
Any alternative or additional reporting requirement shall be set out in the Special Conditions.
3.5
The Contracting Authority may request additional information at any time, providing the
reasons for that request. Subject to the Organisation’s Regulations and Rules, such information
shall be supplied within thirty (30) Days of receipt of the request. The Organisation may submit
a duly motivated request to extend the 30-Day deadline.
3.6
The Organisation shall notify the Contracting Authority without delay of any circumstances
likely to adversely affect the implementation and management of the Action, or to delay or
jeopardise the performance of the activities.
Content of the reports
3.7
The progress report(s) shall relate directly to this Agreement and shall at least include:
a)
summary and context of the Action;
b) actual Results: an updated table based on a logical framework matrix (as included in
Annex I) including reporting of Results achieved by the Action (Outputs, Outcomes, and
if possible, Impact) as measured by their corresponding Indicators, against agreed
baselines and targets, and relevant data sources;
c) information on the activities directly related to the Action as described in Annex I and
carried out during the reporting period;
d) information on the difficulties encountered and measures taken to overcome problems and
eventual changes introduced;
e) information on measures taken to identify the EU as source of financing, in accordance
with Article 7;
f) a breakdown of the total costs, following the structure set out in Annex III, incurred from
the beginning of the Action as well as the legal commitments entered into by the
Organisation during the reporting period;
Contribution Agreement June 2023
Annex II - General Conditions
Page 6
g) a summary of controls carried out and available final audit reports in line with the
Organisation’s policy on disclosure of such controls and audit reports. Where errors and
weaknesses in systems were identified, an analysis of their nature and extent, as well as
information on corrective measures taken or planned, shall also be provided;
h) where applicable, a request for payment;
i)
work plan and budget forecast for the next reporting period.
3.8
The final report shall cover the entire Implementation Period and include:
a) all the information requested in Article 3.7 a) to h);
b) a summary of the Action's receipts, payments received and of the eligible costs incurred;
c) where applicable, an overview of any funds unduly paid or incorrectly used which the
Organisation could or could not recover itself;
d) the exact link to the website referred to in last subparagraph of Article 2.2;
e) if relevant, details of transfers of equipment, vehicles and remaining major supplies
mentioned in Article 8;
f)
where the Action is a Multi-Donor Action and the EU Contribution is not earmarked, a
confirmation from the Organisation that an amount corresponding to that paid by the
Contracting Authority has been used in accordance with the obligations laid down in this
Agreement and that costs that were not eligible for the EU Contribution have been covered
by other donors' contributions;
g) where applicable, a request for payment.
3.9
The Organisation shall submit a report for every reporting period as specified in the Special
Conditions starting from the commencement of the Implementation Period, unless otherwise
specified in the Special Conditions1. Reporting, narrative as well as financial, shall cover the
whole Action, regardless of whether this Action is entirely or partly financed by the EU
Contribution. Unless otherwise specified in the Special Conditions, progress reports shall be
submitted within sixty (60) Days after the period covered by such report and the final report
shall be submitted, at the latest, six (6) months after the end of the Implementation Period.
Management declaration
3.10
Every progress and final report shall be accompanied by a management declaration in
accordance with the template included in Annex VI, unless Article 1.5 of the Special
Conditions states that a global management declaration shall be sent annually to the European
Commission headquarters, separately from the reports provided under this Agreement.
Audit or control opinion for organisations other than International Organisations/Member State
Organisations
3.11
In case the Organisation is neither an International Organisation, nor a Member State
Organisation, the Organisation shall provide an audit or control opinion in accordance with
internationally accepted audit standards, establishing whether the accounts give a true and fair
view, whether the control systems in place function properly, and whether the underlying
transactions are managed in accordance with the provisions of this Agreement. The opinion
shall also state whether the audit work puts in doubt the assertions made in the management
declaration mentioned above.
3.12
Such audit or control opinion shall be provided up to one (1) month following the management
declaration sent with every progress or final report, unless Article 1.5 of the Special Conditions
states that the global management declaration and the global audit or control opinion shall be
1 By default, the reporting period is every twelve (12) months as from the commencement of the Implementation Period.
Contribution Agreement June 2023
Annex II - General Conditions
Page 7
sent annually to the European Commission headquarters separately from the reports provided
under this Agreement.
Currency for reporting
3.13
The reports shall be submitted in the Currency of the Agreement as specified in Article 3 of
the Special Conditions.
3.14
The Organisation shall convert legal commitments, the Action’s receipts and costs incurred in
currencies other than the accounting currency of the Organisation according to its usual
accounting practices.
Failure to comply with reporting obligations
3.15
If the Organisation is unable to present a progress or final report, together with the
accompanying documents, by the deadline set out in Article 3.9, the Organisation shall inform
the Contracting Authority in writing of the reasons. The Organisation shall also provide a
summary of the state of progress of the Action and, where applicable, a provisional work plan
for the next period. If the Organisation fails to comply with this obligation for two (2) months,
following the deadline set out in Article 3.9, the Contracting Authority may terminate the
Agreement in accordance with Article 12, refuse to pay any outstanding amount and recover
any amount unduly paid.
Article 4: Liability towards third parties
4.1
The European Commission shall not, under any circumstances or for any reason whatsoever,
be held liable for damage or injury sustained by the staff or property of the Organisation while
the Action is being carried out, or as a consequence of the Action. The European Commission
shall not therefore accept any claim for compensation or increase in payment in connection
with such damage or injury.
4.2
The European Commission shall not, under any circumstances or for any reason whatsoever,
be held liable towards third parties, including liability for damage or injury of any kind
sustained by them in respect of or arising out of the implementation of the Action.
4.3
The Organisation shall discharge the European Commission of all liability associated with any
claim or action brought as a result of an infringement of the Organisation's Regulations and
Rules committed by the Organisation or Organisation's employees or individuals for whom
those employees are responsible, or as a result of a violation of a third party's rights in the
context of the implementation of the Action.
Article 5: Conflict of interests
5.1
The Organisation shall refrain, in accordance with its Regulations and Rules, from any action
which may give rise to a conflict of interests.
5.2
A conflict of interest shall be deemed to arise where the impartial and objective exercise of the
functions of any person implementing the Agreement is compromised.
Article 6: Confidentiality
6.1
The Contracting Authority and the Organisation shall both preserve the confidentiality of any
document, information or other material directly related to the implementation of the Action
that is communicated as confidential. The confidential nature of a document shall not prevent
it from being communicated to a third party on a confidential basis when the rules binding the
Parties, or the European Commission when it is not the Contracting Authority, so require. In
no case can disclosure put in jeopardy the Parties’ privileges and immunities or the safety and
security of the Parties’ staff, Contractors, Grant Beneficiaries or the Final Beneficiaries of the
Action.
Contribution Agreement June 2023
Annex II - General Conditions
Page 8
6.2
The Parties shall obtain each other’s prior written consent before publicly disclosing such
confidential information unless:
a) the communicating Party agrees in writing to release the other Party from the earlier
confidentiality obligations; or
b) the confidential information becomes public through other means than in breach of the
confidentiality obligation by the Party bound by that obligation; or
c) the disclosure of confidential information is required by law or by Regulations and Rules
established in accordance with the basic constitutive document of any of the Parties.
6.3
The Parties shall remain bound by confidentiality for five (5) years after the End Date of the
Agreement, or longer as specified by the communicating Party at the time of communication.
6.4
Where the European Commission is not the Contracting Authority, it shall nonetheless have
access to all documents communicated to the Contracting Authority, and shall maintain the
same level of confidentiality.
Article 7: Visibility
Visibility
7.1
Unless the European Commission requests or agrees otherwise, the Organisation shall take all
appropriate measures to publicise the fact that the Action has received funding from the EU.
Such measures shall be carried out in accordance with the Visibility Requirements for EU
External Action2, as in effect at the time of entry into force of this Agreement or with any other
guidelines agreed between the European Commission and the Organisation.
7.2
If, during the implementation of the Action, equipment, vehicles or major supplies are
purchased using the EU Contribution, the Organisation shall display appropriate
acknowledgement on such vehicles, equipment or major supplies, including the display of the
EU emblem (twelve yellow stars on a blue background). Where such display could jeopardise
the Organisation’s privileges and immunities or the safety of the Organisation’s staff or of the
Final Beneficiaries, the Organisation shall propose appropriate alternative arrangements. The
acknowledgement and the EU emblem shall be of such a size and prominence as to be clearly
visible in a manner that shall not create any confusion regarding the identification of the Action
as an activity of the Organisation, nor the ownership of the equipment, vehicles or major
supplies by the Organisation.
7.3
If, pursuant to Article 8.5, the equipment, vehicles or remaining major supplies purchased with
the EU Contribution have not been transferred to the local authorities, local Grant Beneficiaries
or Final Beneficiaries when submitting the final report, the visibility requirements as regards
this equipment, vehicles or major supplies (in particular display of the EU emblem) shall
continue to apply between submission of the final report and the end of the overall action, if
the latter is longer. Where the Organisation retains ownership in accordance with Article 8.6,
the visibility requirements shall continue to apply as long as the relevant equipment, vehicles
or remaining major supplies are used by the Organisation.
7.4
Unless otherwise provided in the Special Conditions, if disclosure risks threatening the
Organisation’s safety or harming its interests, the European Commission and the Contracting
Authority (if other than the European Commission) may publish in any form and medium,
including on its websites, the name and address of the Organisation, the purpose and amount
of the EU Contribution.
7.5
The Organisation shall ensure that reports, publications, press releases and updates relevant to
the Action are communicated to the addresses stated in the Special Conditions upon their
issuance.
2 Visibility in EU-financed external actions – Requirements for implementing partners (Projects), available at:
https://ec.europa.eu/intpa/comm-visibility-requirements_en.
Contribution Agreement June 2023
Annex II - General Conditions
Page 9
7.6
The Parties will consult immediately and endeavour to remedy any detected shortcomings in
implementing the visibility requirements set out in this Article. This is without prejudice to
measures the Contracting Authority may take in case of substantial breach of an obligation.
Communication
7.7
In addition to the obligations stipulated under Article 7.1 to 7.6, the Organisation shall
implement, if applicable, communication activities as described in Annex I.
Article 8: Right to use results and transfer of equipment
Right to use
8.1
Ownership of the results of the Action shall not vest in the Contracting Authority. Subject to
Article 6, the Organisation shall grant, and shall act to ensure that any third party concerned
grants the Contracting Authority (and the European Commission where it is not the
Contracting Authority) the right to use free of charge the results of the Action, including the
reports and other documents relating to it, which are subject to industrial or intellectual
property rights.
8.2
Where the results mentioned in Article 8.1 include pre-existing rights and the Organisation
cannot warrant the Contracting Authority (and the European Commission where it is not the
Contracting Authority) the right to use such results, the Organisation shall inform in writing
the Contracting Authority (and the European Commission, where it is not the Contracting
Authority) accordingly.
Transfer
8.3
The equipment, vehicles and remaining major supplies purchased with the EU Contribution
shall be transferred to or remain with local authorities, local Grant Beneficiaries or Final
Beneficiaries, at the latest when submitting the final report.
8.4
The documentary proof of those transfers shall not be presented with the final reports, but shall
be kept for verification for the duration and along with the documents mentioned in Article
15.1.
8.5
By way of derogation from Article 8.3, the equipment, vehicles and remaining major supplies
purchased with the EU Contribution in the framework of actions which continue after the end
of the Implementation Period may be transferred at the end of the overall action. The
Organisation shall use the equipment, vehicles and remaining major supplies for the benefit of
the Final Beneficiaries. The Organisation shall inform the Contracting Authority on the end
use of the equipment, vehicles and remaining major supplies in the final report.
8.6
In the event that there are no local authorities, local Grant Beneficiaries or Final Beneficiaries
to whom the equipment, vehicles and remaining major supplies could be transferred, the
Organisation may transfer them to another action funded by the EU or - exceptionally - retain
ownership of the equipment, vehicles and remaining major supplies at the end of the Action or
the overall action. In such cases, it shall submit a justified written request with an inventory
listing of the items concerned and a proposal concerning their use in due course and - at the
latest – together with the submission of the final report. In no event may the end use jeopardize
the sustainability of the Action.
Article 9: Monitoring and evaluation of the Action
9.1
Keeping in mind the commitment of the Parties to the effective and efficient operation of the
Agreement, the Organisation shall invite representatives of the European Commission and the
Contracting Authority (if other than the European Commission) to participate at their own
costs to the main monitoring missions and evaluation exercises related to the performance of
the Action. Participation in evaluation exercises should be ensured by requesting comments
Contribution Agreement June 2023
Annex II - General Conditions
Page 10
from the European Commission and the Contracting Authority on the terms of reference before
the exercise takes place, and on the different deliverables related to an evaluation exercise prior
to their final approval (as a minimum, on the final report). The Organisation shall send all
monitoring and evaluation reports relating to the Action to the European Commission and the
Contracting Authority once issued, subject to confidentiality.
9.2
Article 9.1 is without prejudice to any monitoring mission or evaluation exercise, which the
European Commission as a donor, or the Contracting Authority, at their own costs, may wish
to perform. Monitoring and evaluation missions by representatives of the European
Commission or the Contracting Authority shall be planned ahead and completed in a
collaborative manner between the staff of the Organisation and the European Commission's
(or Contracting Authority’s) representatives, keeping in mind the commitment of the Parties
to the effective and efficient operation of the Agreement. The European Commission (or the
Contracting Authority) and the Organisation shall agree on procedural matters in advance. The
European Commission (or the Contracting Authority) shall make available to the Organisation
the terms of reference of the evaluation exercise before it takes place, as well as the different
deliverables (as a minimum, the draft final report) for comments prior to final issuance. The
European Commission (or the Contracting Authority) shall send the final monitoring and
evaluation report to the Organisation once issued.
9.3
In line with the spirit of partnership, the Organisation and the European Commission (and the
Contracting Authority, if applicable), may also carry out joint monitoring and/or evaluation.
Such arrangements will be discussed and agreed in due time, planned ahead and completed in
a collaborative manner.
9.4
Representatives of the relevant partner country may, whenever possible, be invited to
participate at their own costs in the main monitoring missions and evaluation exercises, unless
such participation would be detrimental to the objectives of the Action or threaten the safety
or harm the interests of Partners, Grant Beneficiaries or Final Beneficiaries.
Article 10: Amendment to the Agreement
10.1
Without prejudice to Articles 10.3 to 10.6, any amendment to this Agreement, including its
annexes, shall be set out in writing in an addendum signed by both Parties. This Agreement
can only be amended before the End Date.
10.2
The requesting Party shall request in writing any amendment at least thirty (30) Days before
the amendment is intended to enter into force and no later than thirty (30) Days before the End
Date, unless there are special circumstances, duly demonstrated by it, and accepted by the other
Party. The other Party shall notify its decision regarding the amendment proposed in due time
and in any case no later than thirty (30) Days after the date when the amendment request was
received.
10.3
By way of derogation from Articles 10.1 and 10.2, where an amendment to Annex I and/or
Annex III does not affect the main purpose of the Action and the financial impact is limited to
a transfer within a single budget heading, including cancellation or introduction of an item, or
a transfer between budget headings involving a variation (as the case may be in cumulative
terms) of 25 % or less of the amount originally entered (or as amended by a written addendum)
in relation to each concerned heading, the Organisation may unilaterally amend Annex I and/or
Annex III and shall inform the Contracting Authority accordingly in writing, at the latest in
the next report.
10.4
The method described in Article 10.3 shall be used neither to amend the contingency reserve
referred to under Article 16.2, the rate for remuneration, nor the agreed methodology or fixed
amounts/rates of simplified cost options.
10.5
The Organisation may, in agreement with the Contracting Authority and before the
modification takes place, change the following without a formal addendum to the Agreement:
Contribution Agreement June 2023
Annex II - General Conditions
Page 11
(a) Outputs, the Indicators and their related targets, baselines and sources of verification
described in Annex I and in the logical framework if the change does not affect the main
outcome of the Action;
(b) Communication activities described in Annex I.
Approved changes must be explained in the next report.
10.6
Changes of address and of bank account shall be notified in writing to the Contracting
Authority. Where applicable, changes of bank account must be specified in the request for
payment, using the financial identification form attached as Annex IV.
Article 11: Suspension
Suspension of the time limit for payment
11.1
The Contracting Authority may suspend the time limit for payment following a single payment
request by notifying the Organisation that either:
a) the amount is not due; or
b) the appropriate supporting documents have not been provided and therefore the Contracting
Authority needs to request clarifications, modifications or additional information to the
narrative or financial reports. Such clarifications or additional information may notably be
requested by the Contracting Authority if it has doubts about compliance by the
Organisation with its obligations in the implementation of the Action; or
c) credible information has come to the notice of the Contracting Authority that puts in doubt
the eligibility of the reported expenditure; or
d) credible information has come to the notice of the Contracting Authority that indicates a
significant deficiency in the functioning of the Internal Control System of the Organisation
or that the expenditure reported by the Organisation is linked to a serious irregularity and
has not been corrected. In this case, the Contracting Authority may suspend the payment
deadline if it is necessary to prevent significant damage to the EU's financial interests.
11.2
In the situations listed in Article 11.1, the Contracting Authority shall notify the Organisation
as soon as possible, and in any case within thirty (30) Days from the date on which the payment
request was received, of the reasons for the suspension, specifying - where applicable - the
additional information required. Suspension shall take effect on the date when the Contracting
Authority sends the notification stating the reasons for the suspension. The remaining payment
period shall start to run again from the date on which the requested information or revised
documents are received or the necessary further checks are carried out. If the requested
information or documents are not provided within the deadline fixed in the notification or are
incomplete, payment may be made on the basis of the partial information available.
Suspension of the Agreement by the Contracting Authority
11.3
The Contracting Authority may suspend the implementation of the Agreement, fully or partly,
if:
a) the Contracting Authority has proof that irregularities, fraud or breach of substantial
obligations have been committed by the Organisation in the procedure of its selection, in
its Ex-ante Pillar Assessment or in the implementation of the Action;
b) the Contracting Authority has proof that irregularities, fraud or breach of obligations have
occurred which call into question the reliability or effectiveness of the Organisation's
Internal Control System or the legality and regularity of the underlying transactions;
c) the Contracting Authority has proof that the Organisation has committed irregularities,
fraud or breaches of obligations under other agreements funded by EU funds provided that
Contribution Agreement June 2023
Annex II - General Conditions
Page 12
those irregularities, fraud or breaches of obligations have a material impact on this
Agreement.
11.4
Before suspension, the Contracting Authority shall formally notify the Organisation of its
intention to suspend, inviting the Organisation to make observations within ten (10) Days from
the receipt of the notification. If the Organisation does not submit observations, or if - after
examination of the observations submitted by the Organisation - the Contracting Authority
decides to pursue the suspension, the Contracting Authority may suspend all or part of the
implementation of this Agreement serving seven (7) Days' prior notice. In case of suspension
of part of the implementation of the Agreement, upon request of the Organisation, the Parties
shall enter into discussions in order to find the arrangements necessary to continue the part of
the implementation that is not suspended. Any expenditures or costs incurred by the
Organisation during the suspension and related to the part of the Agreement suspended shall
not be reimbursed, nor be covered by the Contracting Authority. Following suspension of the
implementation of the Agreement, the Contracting Authority may terminate the Agreement in
accordance with Article 12.2, recover amounts unduly paid and/or, in agreement with the
Organisation, resume implementation of the Agreement. In the latter case, the Parties will
amend the Agreement where necessary.
Suspension for exceptional circumstances
11.5
The Organisation may decide to suspend the implementation of all or part of the Action if
exceptional and unforeseen circumstances beyond the control of the Organisation make such
implementation impossible or excessively difficult, such as in cases of Force Majeure. The
Organisation shall inform the Contracting Authority immediately and provide all the necessary
details, including the measures taken to minimise any possible damage, and the foreseeable
effect and date of resumption.
11.6
The Contracting Authority may also notify the Organisation of the suspension of the
implementation of the Agreement if exceptional circumstances so require, in particular:
a) when a relevant EU Decision identifying a violation of human rights has been adopted; or
b) in cases such as crisis entailing a change of EU policy.
11.7
Neither of the Parties shall be held liable for breach of its obligations under the Agreement if
Force Majeure or exceptional circumstances as set forth under Articles 11.5 and 11.6 prevent
it from fulfilling said obligations, and provided it takes any measures to minimise any possible
damage.
11.8
In the situations listed in Articles 11.5 and 11.6, the Parties shall minimise the duration of the
suspension and shall resume implementation once the conditions allow. During the suspension
period, the Organisation shall be entitled to the reimbursement of the minimum costs, including
new legal commitments, necessary for a possible resumption of the implementation of the
Agreement or of the Action. The Parties shall agree on such costs, including the reimbursement
of legal commitments entered into for implementing the Action before the notification of the
suspension was received which the Organisation cannot reasonably suspend, reallocate or
terminate on legal grounds. This is without prejudice to any amendments to the Agreement
that may be necessary to adapt the Action to the new implementing conditions, including, if
possible, the extension of the Implementation Period or to the termination of the Agreement in
accordance with Article 12.3. In case of suspension due to Force Majeure or if the Action is a
Multi-Donor Action, the Implementation Period is automatically extended by an amount of
time equivalent to the duration of the suspension.
Article 12: Termination
12.1
Without prejudice to any other provision of these General Conditions or penalties foreseen in
the EU Financial Regulation, where applicable, and with due regard to the principle of
proportionality, the Contracting Authority may terminate the Agreement if the Organisation:
Contribution Agreement June 2023
Annex II - General Conditions
Page 13
a) fails to fulfil a substantial obligation incumbent on it under the terms of the Agreement;
b) is guilty of misrepresentation or submits false or incomplete statements to obtain the EU
Contribution or provides reports that do not reflect reality to obtain or keep the EU
Contribution without cause;
c) is bankrupt or being wound up, or is subject to any other similar proceedings;
d) is guilty of Grave Professional Misconduct proven by any justified means;
e) has committed fraud, corruption or any other illegal activity to the detriment of the EU's
financial interests on the basis of proof in the possession of the Contracting Authority;
f) fails to comply with the reporting obligations in accordance with Article 3.15;
g) has committed any of the failings described in Article 11.3 on the basis of proof in the
possession of the Contracting Authority.
12.2
Before terminating the Agreement in accordance with Article 12.1, the Contracting Authority
shall formally notify the Organisation of its intention to terminate, inviting the Organisation to
make observations (including proposals for remedial measures) within thirty (30) Days from
the receipt of the notification. During this period, and until the termination takes effect, the
Contracting Authority may suspend the time limit for any payment in accordance with Article
11.2 as a precautionary measure informing the Organisation immediately in writing. If the
Organisation does not submit observations, or if, after examination of the observations
submitted by the Organisation, the Contracting Authority decides to pursue the termination,
the Contracting Authority may terminate the Agreement serving seven (7) Days' prior notice.
During that period, the Organisation may refer the matter to the responsible director in the
European Commission. Where the Contracting Authority is the European Commission, the
termination will take effect if and when confirmed by the director. Where the Contracting
Authority is not the European Commission, the referral to the responsible director in the
European Commission will not suspend the effects of the decision of the Contracting
Authority. In case of termination, the Contracting Authority may demand full repayment of
any amounts paid in excess of the final amount determined in accordance with Article 18 after
allowing the Organisation to submit its observations. Neither Party shall be entitled to claim
indemnity by the other Party on account of the termination of this Agreement.
12.3
If, at any time, either Party believes that the purpose of the Agreement can no longer be
effectively or appropriately performed, it shall consult the other Party. Failing agreement on a
solution, either Party may terminate the Agreement by serving sixty (60) Days written notice.
In this case, the final amount shall cover:
a) payment only for the part of the Action carried out up to the date of termination;
b) in the situations described in Articles 11.5 and 11.6, the unavoidable residual expenditures
incurred during the notice period; and,
c) in the situations described in Articles 11.5 and 11.6, reimbursement of legal commitments
the Organisation entered into for implementing the Action before the written notice on
termination was received by it and which the Organisation cannot reasonably terminate
on legal grounds.
The Contracting Authority shall recover the remaining part in accordance with Article 14.
12.4
In the event of termination, a final report and a request for payment of the balance shall be
submitted in accordance with Articles 3 and 17. The Contracting Authority shall not reimburse
or cover any expenditure or costs which are not included or justified in a report approved by
it.
Article 13: Applicable law and settlement of disputes
13.1
The Parties shall endeavour to settle amicably any disputes or complaints relating to the
interpretation, application or validity of the Agreement, including its existence or termination.
Contribution Agreement June 2023
Annex II - General Conditions
Page 14
13.2
Where the Organisation is not an International Organisation, and the European Commission is
the Contracting Authority, this Agreement is governed by EU law, complemented - if
necessary - by the relevant provisions of Belgian law. In the absence of an amicable settlement
in accordance with Article 13.1 above, the General Court, or on appeal the Court of Justice of
the European Union, has sole jurisdiction. Such actions must be brought under Article 272 of
the Treaty on the Functioning of the EU (TFEU). Notwithstanding the foregoing sentence,
where the Organisation is not established or incorporated in the EU, any of the Parties may
bring before the Brussels courts any dispute between them concerning the interpretation,
application or validity of the Agreement, if such dispute cannot be settled amicably. Where
one party has brought proceedings before the Brussels courts, the other party may not bring a
claim arising from the interpretation, application or validity of the Agreement in any other
court than the Brussels courts before which the proceedings have already been brought.
13.3
Where the Organisation is not an International Organisation and the European Commission is
not the Contracting Authority, the Agreement shall be governed by the law of the country of
the Contracting Authority and the courts of the country of the Contracting Authority shall have
exclusive jurisdiction, unless otherwise agreed by the Parties. The dispute may, by common
agreement of the Parties, be submitted for conciliation to the European Commission. If no
settlement is reached within one hundred and twenty (120) Days of the opening of the
conciliation procedure, each Party may notify the other that it considers the procedure to have
failed and may submit the dispute to the courts of the country of the Contracting Authority.
13.4
Where the Organisation is an International Organisation:
a) nothing in the Agreement shall be interpreted as a waiver of any privileges or immunities
accorded to any Party by its constituent documents, privileges and immunities agreements
or international law;
b) in the absence of an amicable settlement pursuant to Article 13.1 above, any dispute,
controversy or claim arising out of or in relation to this Agreement, or the existence,
interpretation, application, breach, termination, or invalidity thereof, shall be settled by
final and binding arbitration in accordance with the 2012 Permanent Court of Arbitration
Rules for Arbitration, as in effect on the date of entry into force of this Agreement. The
appointing authority shall be the Secretary General of the Permanent Court of Arbitration.
The arbitration proceedings must take place in the Hague and the language used in the
arbitral proceedings will be English. The arbitrator’s decision shall be binding on all
Parties and there shall be no appeal.
Article 14: Recovery
14.1
Where an amount is to be recovered under the terms of the Agreement, the Organisation shall
repay the amount due to the Contracting Authority.
14.2
Before recovery, the Contracting Authority shall formally notify the Organisation of its
intention to recover any undue amount, specifying the amount and the reasons for recovery
and inviting the Organisation to make any observations within 30 Days from the date of receipt
of the notification. If, after examination of the observations submitted by the Organisation or
if the Organisation does not submit any observations, the Contracting Authority decides to
pursue the recovery procedure, it may confirm recovery by formally notifying the
Organisation. If there is a disagreement between the Organisation and the Contracting
Authority on the amount to be repaid, the Organisation may refer the matter to the responsible
director in the European Commission within thirty (30) Days. Where the Contracting Authority
is the European Commission, a debit note specifying the terms and the date for payment may
be issued after the deadline for the referral to the director. Where the Contracting Authority is
not the European Commission, the referral to the responsible director in the European
Commission will not prevent the Contracting Authority from issuing the debit note.
14.3
If the Organisation does not make the payment by the date specified in the debit note, the
Contracting Authority shall recover the amount due:
Contribution Agreement June 2023
Annex II - General Conditions
Page 15
a) by offsetting it against any amounts owed to the Organisation by the EU;
b) by taking legal action pursuant to Article 13;
c) in exceptional circumstances justified by the necessity to safeguard the financial
interests of the EU, the Contracting Authority may, when it has justified grounds to
believe that the amount due would be lost, recover by offsetting before the deadline
specified in the debit note without the Organisation’s prior consent.
14.4
If the Organisation fails to repay by the due date, the amount due shall be increased by late
payment interest calculated at the rate indicated in Article 17.7(a). The interest shall be payable
for the period elapsing from the day after the expiration of the time limit for payment up to
and including the date when the Contracting Authority actually receives payment in full of the
outstanding amount. Any partial payment shall first cover the interest.
14.5
Where the European Commission is not the Contracting Authority, it may, if necessary,
proceed itself to the recovery.
14.6
The European Commission may waive the recovery in accordance with the principle of Sound
Financial Management and proportionality or it shall cancel the amount in the event of a
mistake.
Article 15: Archiving, access and financial checks
15.1
For a period of five (5) years from the End Date and in any case until any on-going audit,
verification, appeal, litigation or pursuit of claim or investigation by the European Anti-Fraud
Office (OLAF), if notified to the Organisation, has been disposed of, the Organisation shall
keep and make available according to Article 15 all relevant financial information (originals
or copies) related to the Agreement and to any Procurement Contracts and Grant agreements
financed by the EU Contribution.
15.2
The Organisation shall allow the European Commission, or any authorised representatives, to
conduct desk reviews and on-the-spot checks on the use made of the EU Contribution on the
basis of supporting accounting documents and any other document related to the financing of
the Action.
15.3
The Organisation agrees that OLAF may carry out investigations, including on-the-spot checks
and inspections, in accordance with the provisions laid down by EU law for the protection of
the financial interests of the EU against fraud, corruption and any other illegal activity.
15.4
The Organisation agrees that the execution of this Agreement may be subject to scrutiny by
the Court of Auditors when the Court of Auditors audits the European Commission’s
implementation of EU expenditure. In such case the Organisation shall provide to the Court of
Auditors access to the information that is required for the Court to perform its duties.
15.5
To that end, the Organisation undertakes to provide officials of the European Commission,
OLAF and the European Court of Auditors and their authorised agents, upon request,
information and access to any documents and computerised data concerning the technical and
financial management of operations financed under the Agreement, as well as grant them
access to sites and premises at which such operations are carried out. The Organisation shall
take all necessary measures to facilitate these checks in accordance with its Regulations and
Rules. The documents and computerised data may include information that the Organisation
considers confidential in accordance with its own established Regulations and Rules or as
governed by contractual agreement. Such information once provided to the European
Commission, OLAF, the European Court of Auditors, or any other authorised representatives,
shall be treated in accordance with EU confidentiality rules and legislation and Article 6.
Documents must be accessible and filed in a manner permitting checks, the Organisation being
bound to inform the European Commission, OLAF or the European Court of Auditors of the
exact location at which they are kept. Where appropriate, the Parties may agree to send copies
of such documents for a desk review.
Contribution Agreement June 2023
Annex II - General Conditions
Page 16
15.6
Where applicable, the desk reviews, investigations, on-the-spot checks and inspections
referred to in Article 15.2 to 15.5 shall refer to a verification that shall be performed in
accordance with the verification clauses agreed between the Organisation and the European
Commission. This is without prejudice to any cooperation arrangement between OLAF and
the Organisation’s anti-fraud bodies.
15.7
The European Commission shall inform the Organisation of the planned on-the-spot missions
by agents appointed by the European Commission in due time in order to ensure adequate
procedural matters are agreed upon in advance.
15.8
Failure to comply with the obligations set forth in Article 15 constitutes a case of breach of a
substantial obligation under this Agreement.
Article 16: Eligibility of costs
16.1
Direct costs are eligible for EU financing if they meet all the following criteria:
a)
they are necessary for carrying out the Action, directly attributable to it, arising as a
direct consequence of its implementation and charged in proportion to the actual use;
b)
they are incurred in accordance with the provisions of this Agreement;
c)
they are actually incurred by the Organisation, i.e. they represent real expenditure
definitely and genuinely borne by the Organisation, without prejudice to Article 16.6;
d)
they are reasonable, justified, comply with the principle of Sound Financial
Management and are in line with the usual practices of the Organisation regardless of
their source of funding;
e)
they are incurred during the Implementation Period with the exception of costs related
to final report, final evaluation, audit and other costs linked to the closure of the Action
which may be incurred after the Implementation Period;
f)
they are identifiable and backed by supporting documents, in particular determined
and recorded in accordance with the accounting practices of the Organisation;
g)
they are covered by one of the sub-headings indicated in the estimated budget in Annex
III and by the activities described in Annex I; and
h)
they comply with the applicable tax and social legislation taking into account the
Organisation's privileges and immunities.
16.2
A reserve for contingencies and/or possible fluctuations in exchange rates - not exceeding 5 %
of the direct eligible costs - may be included in Annex III to allow for adjustments necessary
in the event of unforeseeable changes of circumstances on the ground. In such case, the reserve
can be used only with the prior written authorisation of the Contracting Authority, upon a duly
justified request from the Organisation.
16.3
The following costs may not be considered eligible direct costs, but may be charged as part of
the remuneration: all eligible costs that, while necessary and arising as a consequence of
implementation, are supporting the implementation of the Action and not considered part of
the activities that the European Union finances as described in Annex I, including corporate
management costs or other costs linked to the normal functioning of the Organisation, such as
horizontal and support staff, office or equipment costs (except when duly justified and
described in Annex I, such as a project office).
16.4
The remuneration shall be declared on the basis of a flat-rate which shall not exceed 7% of the
total eligible direct costs to be reimbursed by the Contracting Authority. The remuneration
does not need to be supported by accounting documents. For Multi-Donor and comparable
actions, the remuneration shall not be higher than that charged by the Organisation to
comparable contributions.
Contribution Agreement June 2023
Annex II - General Conditions
Page 17
16.5
The following costs are ineligible for EU financing:
a) bonuses, provisions, reserves or non-remuneration related costs. Employers' contributions to
pension or to any other employee insurance funds run by the Organisation shall only be
eligible to the extent they do not exceed the cost incurred during the reporting period,
calculated following applicable international accounting standards;
b) full-purchase cost of equipment and assets unless the asset or equipment is specifically
purchased for the Action and ownership is transferred in accordance with Article 8;
c) duties, taxes and charges, including VAT, that are recoverable/deductible by the
Organisation;
d) return of capital;
e) negative remuneration (otherwise referred to as ‘negative interest’) charged by banks or other
financial institutions;
f) debts and debt service charges;
g) provision for losses, debts or potential future liabilities;
h) banking charges for the transfers from and to the Contracting Authority3;
i) costs incurred during the suspension of the implementation of the Agreement except the
minimum costs agreed on in accordance with Article 11.8;
j) costs declared by the Organisation under another agreement financed by the European Union
budget (including through the European Development Fund);
k) in-kind contributions. The cost of staff assigned to the Action and actually incurred by the
Organisation is not an in-kind contribution and may be declared as a direct eligible cost if it
complies with the conditions set out in Article 16.1; and
l) costs of purchase of land or buildings, unless otherwise provided in the Special Conditions.
Simplified cost options
16.6
Direct eligible costs may also be declared by using any or a combination of unit costs, lump
sums and flat-rate financing.
16.7
The methods used by the Organisation to determine unit costs, lump sums or flat-rates shall
comply with the principles provided in Articles 16.1, 16.3 and 16.5, be clearly described and
substantiated in Annex III, shall avoid double funding of costs and shall respect the principle
of Sound Financial Management. These methods shall be based on the Organisation's historical
or actual accounting data, its usual accounting practices, an expert judgment or on statistical
or other objective information where available and appropriate.
16.8
Costs declared under simplified cost options do not need to be backed by accounting or
supporting documents except if they are necessary to demonstrate that the costs have been
declared according to the declared method or cost accounting practices and that the qualitative
and quantitative conditions defined in Annex I and III have been respected.
3 The party causing a repetition of a transfer bears all costs of the repeated transfer.
Contribution Agreement June 2023
Annex II - General Conditions
Page 18
16.9
Simplified cost options not linked to the achievement of concrete Results shall only be eligible
if they have been ex ante-assessed by the European Commission.
16.10 If a verification reveals that the methods used by the Organisation to determine unit costs, lump
sums or flat-rates are not compliant with the conditions established in this Agreement, the
Contracting Authority shall be entitled to recover proportionately up to the amount of the unit
costs, lump sums or flat-rate financing.
Article 17: Payments
17.1
Payment procedures shall be as follows:
a) the Contracting Authority shall provide a first pre-financing instalment as set out in Article
4.1 of the Special Conditions within thirty (30) Days of receiving the Agreement signed by
both Parties;
b) the Organisation may submit a request for further pre-financing instalment for the following
reporting period in accordance with Article 4 of the Special Conditions; the following
provisions apply:
i) the reporting period is intended as a twelve-month period, unless otherwise provided
for in the Special Conditions. When the remaining period to the end of the Action is
up to eighteen (18) months, the reporting period shall cover it entirely;
ii) if at the end of the reporting period less than 70% of the last payment (and 100% of
previous payments, if any) has been paid by the Organisation to its staff or otherwise
subject to a legal commitment with a third party, the further pre-financing payment
shall be reduced by the amount corresponding to the difference between the 70 % of
the immediately preceding pre-financing payment (and 100% of previous payments, if
any) and the part of the previous pre-financing payments which has been paid by the
Organisation to its staff or has been subject to a legal commitment with a third party;
iii) the Organisation may submit a request for further pre-financing payment before the
end of the reporting period, once more than 70 % of the immediately preceding
payment (and 100% of previous payments, if any) has been paid by the Organisation
to its staff or otherwise subject to a legal commitment with a third party. In this case,
the following reporting period starts anew from the end date of the period covered by
this payment request;
c) at the end of the Implementation Period, the Organisation shall submit a payment request
for the balance, where applicable, together with the final report. The amount of the balance
shall be determined according to Article 18 and following approval of the request for
payment of the balance and of the final report; and
d) the Contracting Authority shall pay the further pre-financing instalments and the balance
within ninety (90) Days of receiving a payment request accompanied by a progress or final
report, unless the time limit for payment was suspended according to Article 11 or 12.
17.2
Payment requests shall be accompanied by narrative and financial reports presented in
accordance with Article 3. The requests for pre-financing payments and the request for the
balance shall be drafted in the Currency of the Agreement as specified in the Special
Conditions. Except for the first pre-financing instalment, the payments shall be made upon
approval of the payment request accompanied by a progress or final report. The final amount
shall be established in line with Article 18. If the balance is negative, the payment of the
balance takes the form of recovery.
17.3
Approval of the requests for payment and of the accompanying reports shall not imply
recognition of the regularity or of the authenticity, completeness and correctness of the
declarations and information contained therein.
Contribution Agreement June 2023
Annex II - General Conditions
Page 19
17.4
The Contracting Authority shall make payments in the Currency of the Agreement as specified
in the Special Conditions to the bank account referred to in the financial identification form in
Annex IV.
17.5
Payment arrangements for financing not linked to costs in accordance with Article 19 shall be
set out in Article 4 of the Special Conditions and Annex I.
17.6
If no payment has been made by the Contracting Authority within two (2) years of the entry
into force of the Agreement, the Agreement shall be terminated.
Late payment interest
17.7
In case of late payment of the amounts stated in Article 4 of the Special Conditions the
following conditions apply:
a) upon expiry of the time limits for payments specified in Article 17.1, if the Organisation
is not a Member State Organisation, it shall receive interest on late payment based on the
rate applied by the European Central Bank for its main refinancing operations in Euros
(Reference Rate), increased by three and a half percentage points. The Reference Rate
shall be the rate in force on the first day of the month in which the time limit for payment
expires, as published in the C series of the Official Journal of the EU;
b) the suspension of the time limit for payment by the Contracting Authority in accordance
with Article 11 or 12 shall not be considered as late payment;
c) interest on late payment shall cover the period running from the day following the due
date for payment, up to and including the date of actual payment as established in Article
17.1. Any partial payment shall first cover the interest;
d) by way of exception to point (c), when the interest calculated in accordance with this
provision is lower than or equal to EUR 200, the Contracting Authority shall pay such
interest to the Organisation only upon request from the Organisation submitted within two
(2) months of it receiving late payment;
e) by way of exception to point (c), when the Contracting Authority is not the European
Commission, and the European Commission does not make the payments, the
Organisation shall be entitled to late payment interest upon its request submitted within
two (2) months of it receiving late payment.
Article 18: Final amount of the EU Contribution
18.1
The Contracting Authority shall determine the final amount of the EU Contribution when
approving the Organisation’s final report. The Contracting Authority shall then determine the
balance:
a) to be paid to the Organisation in accordance with Article 17 where the final amount of the
EU Contribution is higher than the total amount already paid to the Organisation; or
b) to be recovered from the Organisation in accordance with Article 14 where the final
amount of the EU Contribution is lower than the total amount already paid to the
Organisation.
18.2
The final amount shall be the lower of the following amounts:
a) the maximum EU Contribution referred to in Article 3.1 of the Special Conditions in terms
of absolute value;
b) the amount obtained after reduction of the EU Contribution in accordance with Article
18.3.
18.3
Where the Action (i) is not implemented, (ii) is not implemented in line with the Agreement
or (iii) is implemented partially or late, the Contracting Authority may, after allowing the
Organisation to submit its observations, reduce the EU Contribution in proportion to the
Contribution Agreement June 2023
Annex II - General Conditions
Page 20
seriousness of the above mentioned situations. If there is a disagreement between the
Organisation and the Contracting Authority on the reduction, the Organisation may refer the
matter to the responsible director in the European Commission.
Article 19: Financing not linked to costs
19.1
The payment of the EU Contribution may be partly or entirely linked to the achievement of
Results measured by reference to previously set milestones or through performance Indicators.
Such financing not linked to costs is not subject to Article 16. The relevant Results and the
means to measure their achievement shall be clearly described in Annex I.
19.2
The amount to be paid per achieved Result shall be set out in Annex III.
19.3
The Organisation shall not be obliged to report on costs linked to the achievement of Results.
However, the Organisation shall submit any necessary supporting documents, including where
relevant accounting documents, to prove that the Results triggering the payment as defined in
Annex I and III have been achieved.
19.4
Articles 3.7 f), 3.8 b), 3.8 f), 10.3 and 10.5 do not apply to the part of the Action supported by
way of financing not linked to costs.
Article 20: Contracting and Early Detection and Exclusion System
Contracting
20.1
Unless otherwise provided for in the Special Conditions, the origin of the goods and the
nationality of the organisations, companies and experts selected for carrying out activities in
the Action shall be determined in accordance with the Organisation’s relevant rules. However,
and in any event, goods, organisations, companies and experts eligible under the applicable
regulatory provisions of the European Union shall be eligible. Without prejudice to the
foregoing or to the Organisation's assessed Regulations and Rules, the Organisation shall
promote the use of local contractors when implementing the Action.
Early Detection and Exclusion System
20.2
The Organisation shall inform the European Commission if, in relation to the implementation
of the Action, it has detected a situation of exclusion pursuant to its rules and procedures
referred to in Article 2.2 d) and any ad hoc measure stipulated in the Special Conditions or if
it has detected a fraud and/or an irregularity pursuant to Article 2.6. This information may be
used by the European Commission for the purpose of the Early Detection and Exclusion
System. The Organisation shall inform the European Commission when it becomes aware that
transmitted information needs to be rectified updated or removed. The Organisation shall
ensure that the entity concerned is informed that its data was transmitted to the European
Commission and may be included in the Early Detection and Exclusion System and be
published on the website of the European Commission. These requirements cease at the end
of the Implementation Period.
20.3
Without prejudice to the power of the European Commission to exclude a person or an entity
from future procurement contracts and grants financed by the EU and/or to impose financial
penalties according to the EU Financial Regulation, the Organisation may impose sanctions
on third parties according to its own Regulations and Rules ensuring, where applicable, the
right of defence of the third party.
20.4
The Organisation may take into account, as appropriate and on its own responsibility, the
information contained in the Early Detection and Exclusion System, when implementing the
EU Contribution. Access to that information can be provided through the authorised persons
Contribution Agreement June 2023
Annex II - General Conditions
Page 21

or via consultation with the European Commission as referred in Article 5.6 of the Special
Conditions.
Electronically signed on 22/12/2023 12:36 (UTC+01) in accordance with Article 11 of Commission Decision (EU) 2021/2121
Contribution Agreement June 2023
Annex II - General Conditions
Page 22
Document Outline